衣立东,朱敏奕,魏磊,等.风电并网后西北电网调峰能力的计算方法[J].电网技术,2010,34(2):129-132. Yi Lidong,Zhu Minyi,Wei Lei,et al.A computing method for peak load regulation ability of northwest china power grid connected with large-scale wind farms[J].Power System Technology,2010,34(2):129-132(in Chinese).
[2]
杨宏,刘建新,苑津莎.风电系统中常规机组负调峰能力研究[J].中国电机工程学报,2010,30(16):26-31. Yang Hong,Liu Jianxin,Yuan Jinsha.Research of peak load regulation of conventional generators in wind power grid[J].Proceedings of theCESS,2010,30(16):26-31(in Chinese).
[3]
杨冬锋,周苏荃,鲍锋.风电并网系统低谷时段的调峰能力分析[J].电网技术,2014,38(6):1446-1451. Yang Dongfeng,Zhou Suquan,Bao Feng.Analysis on peak load regulation capability of power grid integrated with wind farms in valley load period[J].Power System Technology,2014,38(6):1446-1451(in Chinese).
[4]
孟祥星,王宏.大规模风电并网条件下的电力系统调度[J].东北电力大学学报,2009,29(1):1-7. Meng Xiangxing,Wang Hong.Electric system scheduling in the condition of synchronization of large-scale wind power[J].Journal of Northeastern Electric University Natural Science Edition,2009,29(1):1-7(in Chinese).
[5]
雷亚洲.与风电并网相关的研究课题[J].电力系统自动化,2003,27(8):84-89. Lei Yazhou.Studies on wind farm integration into power system[J].Automation of Electric Power Systems,2003,27(8):84-89(in Chinese).
[6]
戴慧珠,王伟胜,迟永宁.风电场接入电力系统研究的新进展[J]. 电网技术,2007,31(20):16-23. Dai Huizhu,Wang Weisheng,Chi Yongning.Recent wind power integration study in China[J].Power System Technology,2007,31(20):16-23(in Chinese).
[7]
吴淳.风电对电力系统调频和备用的影响研究[J].华东电力,2011,39(6):993-996. Wu Chun.Research on the influence of wind power on power balancing and reserve capacity[J].East China Electric Power,2011,39(6):993-996(in Chinese).
[8]
张国强,吴文传,张伯明.考虑风电接入的有功运行备用协调优化[J].电力系统自动化,2011,35(12):15-19. Zhang Guoqiang,Wu Wenchuan,Zhang Boming.Optimization of operation reserve coordination considering wind power integration[J].Automation of Electric Power System,2011,35(12):15-19(in Chinese).
[9]
Bodo D R,Mauzy D M,Trefny F J.Economic generation dispatch with responsive spinning reserve constraints[J].IEEE Transactions on Power Systems,1994,9(1):555-559.
[10]
周玮.含风电场的电力系统动态经济调度问题研究[D].大连:大连理工大学,2010.
[11]
Dany G.Power reserve in interconnected systems with high wind power production[J].IEEE Porto. Power Tech Proceedings,2001,4(6):10-13.
[12]
Hetzer J,Yu D C.An economic dispatch model incorporating wind power[J].IEEE Transactions on Power Energy Conversion,2008,23(2):603-611.
[13]
袁铁江,晁勤,吐尔逊﹒伊不拉音,等.大规模风电并网电力系统动态清洁经济优化调度的建模[J].中国电机工程学报,2010,30(31):7-13. Yuan Tiejiang,Chao Qin,Toerxun Yibulayin,et al.Optimized economic and environment-friendly dispatching modeling for large-scale wind power integration[J].Proceedings of the CESS,2010,30(31):7-13(in Chinese).
[14]
王剑,刘天琪,刘学平.基于优先级排序和内点法的机组优化组合[J].电力系统保护与控制,2010,38(13):55-60. Wang Jian,Liu Tianqi,Liu Xueping.Unit commitment optimization based on priority list and interior point methods[J].Power System Protection and Control,2010,38(13):55-60(in Chinese).
[15]
Shi Y,Eberhart R.Empirical study of particle swarm optimization//International Conference on Evolutionary Computation.Washington,USA:IEEE,1999:1945-1950.
[16]
Zaininger H W,Bell D J.Potential dynamic impacts of wind turbines on utility systems[J].IEEE Transactions on Power Apparatus and Systems,1981,100(12):4821-4829.
[17]
李茜,刘天琪,李兴源.大规模风电接入的电力系统优化调度新方法[J].电网技术,2013,37(3):733-739. Li Qian,Liu Tianqi,Li Xingyuan.A new optimized dispatch method for power grid connected with large-scale wind farms[J].Power System Technology,2013,37(3):733-739(in Chinese).