PricewaterhouseCoopers LLP(PwC),Potsdam Institute for Climate Impact Research(PIK),International Institute for Applied Systems Analysis(IIASA).100% Renewable electricity: a roadmap to 2050 for Europe and North Africa[R].London:PricewaterhouseCoopers LLP(PwC),Germany:Potsdam Institute for Climate Impact Research(PIK),Austria:International Institute for Applied Systems Analysis(IIASA),2014.
[2]
Hand M M,Baldwin S,DeMeo E,et al.Renewable electricity futures study[R].Colorado:National Renewable Energy Laboratory,2014.
[3]
肖创英,汪宁渤,陟晶,等.甘肃酒泉风电出力特性分析[J].电力系统自动化,2010,34(17):64-67. wXiao Chuangying,Wang Ningbo,Zhi Jing,et al.Power characteristics of Jiuquan wind power base[J].Automation of Electric Power Systems,2010,34(17):64-67(in Chinese).
[4]
张宏宇,印永华,申洪,等.大规模风电接入后的系统调峰充裕性评估[J].中国电机工程学报,2011,31(22):26-31. Zhang Hongyu,Yin Yonghua,Shen Hong,et al.Peak-load regulating adequacy evaluation associated with large-scale wind power integration[J].Proceedings of the CSEE,2011,31(22):26-31(in Chinese).
[5]
International Energy Agency.Harnessing variable renewables[M].Paris:International Energy Agency,2011:41-67.
[6]
Capasso A,Falvo M C,Lamedica R,et al.A new methodology for power systems flexibility evaluation[C]//Proceedings of the Power Technology.Russia:IEEE,2005:27-30.
[7]
Lannoye E,Flynn D,O’Malley M.The role of power system flexibility in generation planning[C]//Proceedings of the Power and Energy Society General Meeting.San Diego,California,USA:IEEE,2011:1-6.
[8]
Lannoye E,Flynn D,O’Malley M.Evaluation of Power System Flexibility[J].IEEE Transactions on Power Systems,2014,27(2):922-931.
[9]
Lannoye E,Flynn D,O’Malley M.Transmission, variable generation, and power system flexibility[J].IEEE Transactions on Power Systems,2015,30(1):57-66.
[10]
Lannoye E,Flynn D,O’Malley M.Assessment of power system flexibility:a high-level approach[C]//IEEE Proceedings of the Power and Energy Society General Meeting.San Diego,CA,2012:1-8.
[11]
肖定垚,王承民,曾平良,等.电力系统灵活性及其评价综述[J].电网技术,2014,38(6):1569-1576. Xiao Dingyao,Wang Chengmin,Zeng Pingliang,et al.A survey on power system flexibility and its evaluations[J].Power System Technology,2014,38(6):1569-1576(in Chinese).
Cochran J,Miller M,Zinaman O,et al.Flexibility in 21st Century power systems[R].Colorado:National Renewable Energy Laboratory,Dublin:University College Dublin,Paris:International Energy Agency,California:Electric Power Research Institute,Portland:Northwest Power and Conservation Council,Finland :VTT Technical Research Centre,New Delhi:Power System Operation Corporation,2014.
[14]
张海峰,高峰,吴江,等.含风电的电力系统动态经济调度模型[J].电网技术,2013,37(5):1298-1303. Zhang Haifeng,Gao Feng,Wu Jiang,et al.A dynamic economic dispatching model for power grid containing wind power generation system[J].Power System Technology,2013,37(5):1298-1303(in Chinese).
[15]
王彩霞,鲁宗相.风电功率预测信息在日前机组组合中的应用[J].电力系统自动化,2011,35(7):13-18. Wang Caixia,Lu Zongxiang.Unit commitment based on wind power forecast[J].Automation of Electric Power Systems,2011,35(7):13-18(in Chinese).