李景禄,郑瑞臣.关于接地工程中若干问题的分析和探讨[J].高电压技术,2006,32(6):122-124. Li Jinglu,Zheng Ruichen.Discussion on relative parameters in grounding technology[J].High Voltage Engineering,2006,32(6):122-124(in Chinese).
[2]
程路,陈乔夫.小电流接地系统单相接地选线技术综述[J].电网技术,2009,33(18):219-224. Cheng Lu,Chen Qiaofu.A survey on faulty line selection technology for single-phase grounded transmission line in small current neutral grounded system[J].Power System Technology,2009,33(18):219-224(in Chinese).
[3]
王斌,张宇,贲飞,等.基于虚拟现实技术的 Φ 5.5 m电力电缆隧道内部布置方案[J].华东电力,2010,38(4):540-541. Wang Bin,Zhang Yu,Ben Fei,et al.Research on internal layout scheme of Φ 5.5 meters power cable tunnel based on virtual reality technology[J].East China Electric Power,2010,38(4):540-541(in Chinese).
[4]
张海峰,王丰华,金之俭,等.地下金属管道对变电站接地网接地电阻及其测量的影响[J].电网技术,2011,35(1):134-140. Zhang Haifeng,Wang Fenghua,Jin Zhijian,et al.Impacts of underground metal pipelines on grounding resistance of substation grounding grid and its measurement[J].Power System Technology,2011,35(1):134-140(in Chinese).
[5]
王晓彤,林集明,陈葛松,等.广东—海南500 kV海底电缆输电系统电磁暂态研究[J].电网技术,2008,32(12):6-10. Wang Xiaotong,Lin Jiming,Chen Gesong,et al.Electromagnetic transient analysis of 500 kV submarine cable transmission system from Guangdong to Hainan[J].Power System Technology,2008,32(12):6-10(in Chinese).
[6]
庞仲豪,张宇,陈伟明,等.接地一体化系统在混凝土电杆上的应用[J].华东电力,2013,41(7):1562-1565. Pang Zhonghao,Zhang Yu,Chen Weiming,et al.Application of integrated grounding system in concrete poles[J].East China Electric Power,2013,41(7):1562-1565(in Chinese).
[7]
Zhang Bo,Wu Jinpeng,He Jinliang,et al.Analysis of transient performance of grounding system considering soil ionization by time domain[J].IEEE Trans on Magnetics,2013,49(5):1837-1840.
[8]
王丽,郑刚.盾构法开挖隧道对桩基础影响的有限元分析[J].岩土力学,2011,32(增刊1):704-712. Wang Li,Zheng Gang.Finite element analysis of effects of shield driven tunneling on pile foundation[J].Rock and Soil Mechanics,2011,32(Sup1):704-712(in Chinese).
[9]
唐晓武,朱季,刘维,等.盾构施工过程中的土体变形研究[J].岩石力学与工程学报,2010,29(2):417-422. Tang Xiaowu,Zhu Ji,Liu Wei,et al.Research on soil deformation during shield construction process[J].Chinese Journal of Rock Mechanics and Engineering,2010,29(2):417-422(in Chinese).
[10]
张治国,张孟喜.软土城区土压平衡盾构上下交叠穿越地铁隧道的变形预测及施工控制[J].岩石力学与工程学报,2013,32(增刊2):3428-3439. Zhang Zhiguo,Zhang Mengxi.Deformation prediction of subway tunnel induced by EPB shield soft clay during above and down overlapped traversing process and its construction control[J].Chinese Journal of Rock Mechanics and Engineering,2013,32(Sup2):3428-3439(in Chinese).
[11]
王鑫,张庆贺,周金海.特殊荷载作用下电力电缆隧道结构内力计算[J].上海交通大学学报,2011,45(5):639-642. Wang Xin,Zhang Qinghe,Zhou Jinhai.Structure inner force analysis of electric cable tunnel under special loads[J].Journal of Shanghai Jiao Tong University,2011,45(5):639-642(in Chinese).
[12]
施虎,龚国芳,杨华勇,等.盾构掘进机推进力计算模型[J].浙江大学学报,2011,45(1):126-131. Shi Hu,Gong Guofang,Yang Huayong,et al.Determination of thrust force for shield tunneling machine[J].Journal of Zhejiang University,2011,45(1):126-131(in Chinese).
[13]
施虎,杨华勇,龚国芳,等.盾构掘进机关键技术及模拟实验台现状与展望[J].浙江大学学报,2013,47(5):741-748. Shi Hu,Yang Huayong,Gong Guofang,et al.Key technologies of shield tunneling machine and present status and prospect of test rigs for tunneling simulation[J].Journal of Zhejiang University,2013,47(5):741-748(in Chinese).
[14]
潘文霞,王兵,全锐,等.典型特高压杆塔基础接地计算与分析[J].电网技术,2013,37(3):679-685. Pan Wenxia,Wang Bing,Quan Rui,et al.Calculation and analysis of grounding body of typical tower foundation for UHV power transmission[J].Power System Technology,2013,37(3):679-685(in Chinese).
[15]
谭波,杨建军,文习山,等.高土壤电阻率地区大型水电站接地系统设计[J].高电压技术,2011,37(10):2485-2490. Tan Bo,Yang Jianjun,Xi Wenshan,et al.Safety design principle of grounding system in large hydropower station in the area of high soil resistivity[J].High Voltage Engineering,2011,37(10):2485-2490(in Chinese).
[16]
李增,吴广宁,付龙海,等.双层结构土壤模型地网接地电阻的简化计算[J].高电压技术,2008,34(1):45-48. Li Zeng,Wu Guangyu,Fu Longhai,et al.Simplified calculation of grounding resistance of substation grounding system in the Two-layer soil[J].High Voltage Engineering,2008,34(1):45-48(in Chinese).
[17]
杨易旻,彭敏放,王嘉家,等.基于矩量法的接地网接地电阻计算[J].电力科学与技术学报,2008,23(2):56-59. Yang Yimin,Peng Minfang,Wang Jiajia,et al.An algorithm for grounding resistance based on the Galerkin’s moment method[J].Journal of Electric Power Science and Technology,2008,23(2):56-59(in Chinese).
杜学龙,仇天骄,张晓颖,等.电缆隧道中盾构接地系统接地电阻简化计算公式[J].电工电能新技术,2014,33(11):44-49. Du Xuelong,Qiu Tianjiao,Zhang Xiaoying,et al.Simplified formula for calculating the grounding resistance of grounding system using the tunnel foundation in cable tunnel[J].Advanced Technology of Electrical Engineering and Energy,2014,33(11):44-49(in Chinese).