周玮,孙辉,顾宏,等.含风电场的电力系统经济调度研究综述[J].电力系统保护与控制,2011,39(24):148-154.Zhou Wei,Sun Hui,Gu Hong,et al.A review on economic dispatch of power system including wind farms[J].Power System Protection and Control,2011,39(24):148-154(in Chinese).
[2]
傅旭,李海伟,李冰寒.大规模风电场并网对电网的影响及对策综述[J].山西电力,2010,38(1):53-57.Fu Xu,Li Haiwei,Li Binghan.Review on influences of large-scale wind farms power systems and countermeasure[J].Shaanxi Electric Power,2010,38(1):53-57(in Chinese).
邹见效,李丹,郑刚,等.基于机组状态分类的风电场有功功率控制策略[J].电力系统自动化,2011,35(24):28-32.Zou Jianxiao,Li Dan,Zheng Gang,et al.An active power control scheme for wind farms based on state classification algorithm[J].Automation of Electric Power Systems,2011,35(24):28-32(in Chinese).
[6]
林俐,谢永俊,朱晨宸,等.基于优先顺序法的风电场限出力有功控制策略[J],电网技术,2013,37(4):960-966.Lin Li,Xie Yongjun,Zhu Chenchen,et al.Priority list-based output-restricted active power control strategy for wind farms[J].Power System Technology,2013,37(4):960-966(in Chinese).
[7]
邹见效,袁炀,黄其平,等.风电场有功功率控制降功率优化算法[J].电子科技大学学报,2011,40(6):882-885.Zou Jianxiao,Yuan Yang,Huang Qiping,et al.Optimization algorithm for wind farm active power cutback control[J].Journal of University of Electronic Science and Technology of China,2011,40(6):882-885(in Chinese).
[8]
Chen N,Wang Q,Tang Y.An optimal active power control method of wind farm using power prediction information[C]// 2012 IEEE International Conference on Power System Technology.New Zealand:IEEE,2012:1-5.
[9]
Moyano C F,Lopes J A P.An optimization approach for wind turbine commitment and dispatch in a wind park[J].Electric Power Systems Research,2009,79(1):71-79.
[10]
Xiang L,Xie Y,Zhang B L.Dynamic grouping strategy for active power control of wind farm[C]//IEEE 3rd Annual International Conference on Cyber Technology in Automation,Control and Intelligent Systems(CYBER).Nanjing:IEEE,2013:132-137.
[11]
Tarnowski G C,Reginatto R.Adding active power regulation to wind farms with variable speed induction generators[C]//Power Engineering Society General Meeting.Tampa,FL,USA:Power Engineering Society General Meeting,2007:1-8.
[12]
李文朝.并网型风电机组软并网控制系统研究[D].南京:河海大学,2006.
[13]
Ullah N R,Thiringer T,Karlsson D.Temporary primary frequency control support by variable speed wind turbines: potential and application[J].IEEE Transactions on Power Systems,2008,23(2):601-612.
[14]
Lei Y Z,Mullane A,Iightbody G.Modeling of the wind turbine with a doubly-fed induction generator for grid integration studies[J].IEEE Transactions on Energy Conversion,2006,21(1):257-264.
[15]
贾坤.MW级风力发电机液压变桨系统的研究[D].西安:陕西科技大学,2011.
[16]
王江.风力发电变桨距控制技术研究[D].合肥:合肥工业大学,2009.
[17]
Costa A, Crespo A, Navarro J,et al.A review on the young history of the wind power short term prediction[J].Renewable and Sustainable Energy Reviews,2008,12(6):1725-1744.
[18]
王长贵,崔容强,周篁.新能源发电技术[M].北京:中国电力出版社,2003:138-175.
[19]
刘伟,黄越辉,刘纯,等.风电场功率分配算法[J].中国电力,2011,44(8):53-56.Liu Wei,Huang Yuehui,Liu Chun,et al.Study on algorithms of power curtailment among wind farms[J].Electric Power,2011,44(8):53-56(in chinese).