钱科军,袁越,石晓丹,等.分布式发电的环境效益分析[J].中国电机工程学报,2008,28(29):11-15.Qian Kejun,Yuan Yue,Shi Xiaodan,et al.Environmental benefits analysis of distributed generation[J].Proceedings of the CSEE,2008,28(29):11-15(in Chinese).
[2]
马溪原,吴耀文,方华亮,等.采用改进细菌觅食算法的风/光/储混合微电网电源优化配置[J].中国电机工程学报,2011,31(25):17-25.Ma Xiyuan,Wu Yaowen,Fang Hualiang,et al.Optimal sizing of hybrid solar-wind distributed generation in an islanded microgrid using improved bacterial foraging algorithm[J].Proceedings of the CSEE,2011,31(25):17-25(in Chinese).
[3]
田廓,曾鸣,鄢帆,等.考虑环保成本和风电接入影响的动态经济调度模型[J].电网技术,2011,35(6):55-59.Tian Kuo,Zeng Ming,Yan Fan,et al.A dynamic economic scheduling model considering environmental protection cost and impact of connecting wind power to power grid[J].Power System Technology,2011,35(6):55-59(in Chinese).
[4]
刘殿海,杨勇平,杨昆,等.计及环境成本的火电机组供电成本研究[J].中国电力,2005,38(9):24-28.Liu Dianhai,Yang Yongping,Yang Kun,et al.Research on the production cost of coal-fired power generating unit with consideration of environmental costs[J].Electric Power,2005,38(9):24-28(in Chinese).
[5]
王建学,高卫恒,王锡凡,等.考虑环境成本的电源规划JASP模型[J].西安交通大学学报,2008,42(8):1015-1020.Wang Jianxue,Gao Weiheng,Wang Xifan,et al.Improved JASP model of generation planning with environment cost[J].Journal of Xian Jiaotong University,2008,42(8):1015-1020(in Chinese).
[6]
封圆.广域源荷互动调峰模式研究[D].保定:华北电力大学,2013.
[7]
孙近文,万云飞,郑培文,等.基于需求侧管理的电动汽车有序充放电策略[J].电工技术学报,2014,29(8):64-69.Sun Jinwen,Wan Yunfei,Zheng Peiwen,et al.Coordinated charging and discharging strategy for electric vehicles based on demand side management[J].Transactions of China Electrotechnical Society,2014,29(8):64-69(in Chinese).
[8]
翟桥柱,王凌云.需求侧响应对降低发电成本的效益估计[J].中国电机工程学报,2014,34(7):1198-1205.Zhai Qiaozhu,Wang Lingyun.Estimation of generating costs reduction as a result of demand response [J].Proceedings of the CSEE,2014,34(7):1198-1205(in Chinese).
[9]
Dave S,Sooriyabandara M,Yearworth M.System behaviour modelling for demand response provision in a smart grid[J].Energy Policy,2013(61):172-181.
[10]
钟莉娜.我国实施DSM可行性的经济性与财务分析[D].北京:华北电力大学,2004.
[11]
Bouffard F,Galina F D.An electricity market with a probabilistic spinning reserve criterion[J].IEEE Transactions on Power System,2004,19(1):300-307.
[12]
Murgan P,Kannan S,Baskar S.NSGA-II algorithm for multi-objective generation expansion planning problem[J].Electric Power Systems Research,2009,79(1):622-628.
[13]
Aghaei J,Akbari M,Roosta A,et al.Intergrated renewable-conventional generation expansion planning using multiobjective framework[J].IET Generation Transmission and Distribution,2012,6(8):773-784.
[14]
元博,周明,李庚银,等.基于可靠性指标的含风电电力系统的发电和运行备用的协调调度模型[J].电网技术,2013,37(3):800-807.Yuan Bo,Zhou Ming,Li Gengyin,et al.A coordinated dispatching model considering generation and operating reserve for wind power integrated power system based on ELNSR[J].Power System Technology,2013,37(3):800-807(in Chinese).
[15]
Sirikum I, Techanitisawad A, Kachitvichyanukul V.A new efficient GA-benders decomposition method: for power generation expansion planning with emission controls[J].IEEE Transactions on Power Systems,2007,22(3):1092-1100.
[16]
黄伟,张建华,张聪,等.基于细菌群体趋药性算法的电力系统无功优化[J].电力系统自动化,2007,31(7):29-33.Huang Wei,Zhang Jianhua,Zhang Cong,et al.Reactive power optimization in power system based on bacterial colony chemotaxis algorithm[J].Automation of Electric Power Systems,2007,31(7):29-33(in Chinese).
[17]
张晓辉,卢志刚,秦四娟.基于改进细菌群体趋药性算法的电力系统无功优化[J].电网技术,2012,36(2):109-114.Zhang Xiaohui,Lu Zhigang,Qin Sijuan.Reactive power management based on improved bacterial colony chemotaxis algorithm[J].Power System Technology,2012,36(2):109-114(in Chinese).
[18]
华梁,杨伟.基于细菌群体趋药性算法的二级电压控制[J].电网技术,2010,34(4):146-151.Hua Liang,Yang Wei.Secondary voltage control based on bacterial colony chemotaxis algorithm[J].Power System Technology,2010,34(4):146-151(in Chinese).
[19]
卢志刚,夏明昭,张晓辉.基于多阶段减排规划的发电厂碳捕集系统优化配置[J].中国电机工程学报,2011,31(15):65-71.Lu Zhigang,Xia Mingzhao,Zhang Xiaohui.Carbon capture systems optimal allocation scheme for multi-stage emission reduction planning in power plants[J].Proceedings of the CSEE,2011,31(15):65-71(in Chinese).
[20]
张晓辉,闫鹏达,钟嘉庆,等.可再生能源激励制度下的低碳经济电源规划[J].电网技术,2015,39(3):655-662.Zhang Xiaohui,Yan Pengda,Zhong Jiaqing,et al.Research on generation expansion planning in low-carbon economy environment under incentive mechanism of renewable energy sources[J].Power System Technology,2015,39(3):655-662(in Chinese).
[21]
张节潭,苗淼,范宏.含风电场的双层电源规划[J].电网技术,2011,35(11):43-49.Zhang Jietan,Miao Miao,Fan Hong.Bi-level generation expansion planning with large-scale wind farms[J].Power System Technology,2011,35(11):43-49(in Chinese).
[22]
Hatice T,David W C,Frank A F.Multi-period multi-objective electricity generation expansion planning problem with Monte-Carlo simulation[J].Electric Power System Research,2010,80(1):1394-1405.
[23]
季震,陈启鑫,张宁,等.含碳捕集电厂的低碳电源规划模型[J].电网技术,2013,37(10):2689-2696.Ji Zhen,Chen Qixin,Zhang Ning,et al.Low-carbon generation expansion planning model incorporating carbon capture power plant [J].Power System Technology,2013,37(10):2689-2696(in Chinese).