[1] | 何永秀,关雷,蔡琪,等.抽水蓄能电站在电网中的保安功能与效益分析[J].电网技术,2004,28(20):54-57.
|
[2] | He Yongxiu,Guan Lei,Cai Qi,et al.Analysis of securing function and economic benefit of pumped storage station in power grid [J].Power System Technology,2004,28(20):54-57(in Chinese).
|
[3] | Chen Zhigang.On necessity of building Huizhou pumped storage power station[J].Power System Technology,2001,25(7):67-71(in Chinese).
|
[4] | 余欣梅,熊信艮,吴耀武,等.电力系统调峰电源规划优化模型探讨及应用[J].中国电力,2003,36(1):48-51.
|
[5] | Yu Xinmei,Xiong Xinyin,Wu Yaowu,et al.Discussion on optimal model for peaking units’ expansion planning and its application [J].Electric Power,2003,36(1):48-51(in Chinese).
|
[6] | 徐得潜,翟国寿,刘新建.抽水蓄能电站调频及备用效益计算方法研究[J].水力发电学报,2001,(3):2-10.
|
[7] | Xu Deqian,Zhai Guoshou,Liu Xinjian.Research on the calculation method for the frequency modulation and reserve benefits of pumped storage station[J].Journal of Hydroelectric Engineering,2001,(3):2-10(in Chinese).
|
[8] | 李景宗,杨振立,王海政.基于电源优化扩展规划的抽水蓄能电站经济评价方法研究[J].水电能源科学,2002,20(2):85-88.
|
[9] | Li Jingzong,Yang Zhenli,Wang Haizheng.Preliminary study about economic evaluation of pumped storage power station based on electricity optimization expansion planning[J].International Journal of Hydroelectric Energy,2002,20(2):85-88(in Chinese).
|
[10] | 赵永生.我国抽水蓄能电站发展问题探讨[J].水力发电,2003,29(7):69-71.
|
[11] | 彭天波,刘晓亭.我国抽水蓄能电站建设经营现状分析[J].中国电力,2004,37(12):38-42.
|
[12] | Peng Tianbo,Liu Xiaoting.Analysis on present status of operation and construction of pumped storage stations in China[J].Electric Power,2004,37(12):38-42(in Chinese).
|
[13] | 刘树昌.十三陵抽水蓄能电厂在电网中的作用[J].水力发电,1997,(12):5-7.
|
[14] | Liu Shuchang.Function of Shisanling pumped-storage power station in power grid[J].Water Power,1997,(12):5-7(in Chinese).
|
[15] | 蒋晓荣,刘军.十三陵抽水蓄能电厂经济运行效益分析[J].华北电力技术,2001,(11):34-36.
|
[16] | Jiang Xiaorong,Liu Jun.Economic analyses of Shisanling pumped storage power station[J].North China Electric Power,2001,(11):34-36(in Chinese).
|
[17] | 杨京燕,付志奎.抽水蓄能电厂规划评估模型和算法[J].中国电机工程学报,2001,21(2):33-41.
|
[18] | Yang Jingyan,Fu Zhikui.A model and arithmetic for the planning of pumped storage power plant[J].Proceedings of the CSEE,2001,21(2):33-41(in Chinese).
|
[19] | 杨京燕,付志奎,张克.抽水蓄能电厂事故备用效益实用算法[J].电网技术,1999,23(1):70-73.
|
[20] | YangJingyan,Fu Zhikui,Zhang Ke.A practical evaluation method of fault reserve benefit for pumped-storage power plants[J].Power System Technology,1999,23(1):70-73(in Chinese).
|
[21] | 陈志刚.惠州抽水蓄能电站建设的必要性分析[J].电网技术, 2001,25(7):67-71.
|
[22] | Zhao Yongsheng.Discussions on the development of pumped storage power plants in China[J].Water Power,2003,29(7):69-71(in Chinese).
|
[23] | 宣菊琴,林章岁,郑春平.福建电网电力负荷特性的分析预测研究[J].电力技术经济,2005,17(1):37-41.
|
[24] | Xuan Juqin,Lin Zhangsui,Zheng Chunping.Analysis and study on load properties and change trends of Fujian power grid[J].Electric Power Technologic Economics,2005,17(1):37-41(in Chinese).
|
[25] | 福建省电力勘测设计院.福建电网建设抽水蓄能电站的必要性论证[R].福州:福建省电力勘测设计院,2004.
|
[26] | 赵希正.中国电力负荷特性分析与预测[M].北京:中国电力出版社,2001.
|
[27] | 王锡凡.电力系统优化规划[M].北京:水利电力出版社,1990.
|