杨万开,印永华,曾南超,等.三广直流工程系统调试概述[J].中国电力,2005,38(11):14-15. Yang Wankai,Yin Yonghua,Zeng Nanchao,et al.Summary of system commissioning test for Three Gorges-Guangdong HVDC project[J].Electric Power,2005,38(11):14-15(in Chinese).
[2]
梁旭明,吴巾克,冀肖彤.国家电网公司直流输电工程控制保护运行情况分析[J].电网技术,2005,29(23):7-10,17. Liang Xuming,Wu Jinke, Ji Xiaotong.Operating performances analysis on control and protection system of SGCC’s HVDC projects[J].Power System Technology,2005,29(23):7-10,17(in Chinese).
[3]
喻新强.2003年以来国家电网公司直流输电运行情况总结[J].电网技术,2005,29(20):41-46. Yu Xinqiang.Summary on operation of SGCC’s HVDC projects since 2003[J].Power System Technology,2005,29(20):41-46(in Chinese).
[4]
丁钊,韩伟强.天广直流输电系统双极运行情况总结[J].电网技术,2003,27(9):9-14. Ding Zhao,Han Weiqiang. Summary of bipole operation situation of Tian-Guang DC power transmission system[J].Power System Technology,2003,27(9):9-14(in Chinese).
[5]
余涛,沈善德,任震.华中—华东多回HVDC紧急功率转移控制的研究[J].电网技术,2004,28(12):1-4. Yu Tao,Shen Shande,Ren Zhen.Research on emergency power shifting control of multi-circuit HVDC systems from central China power grid to east China power grid[J].Power System Technology,2004,28(12):1-4(in Chinese).
[6]
周长春,徐政.直流输电稳态模型有效性的仿真验证[J].中国电机工程学报,2003,23(12):33-36. Zhou Changchun,Xu Zheng.Simulation validity test of the HVDC quasi-steady-state model[J].Proceedings of the CSEE,2003,23(12):32-36(in Chinese).
[7]
吴红斌,丁明,李生虎.直流输电模型和调节方式对暂态稳定影响的统计研究[J].中国电机工程学报,2003, 23(10):32-37. Wu Hongbin,Ding Ming,Li Shenghu.Statistical research on the effects of HVDC models and controls on transient stability of power system[J].Proceedings of the CSEE,2003,23(10):32-37(in Chinese).
[8]
戚庆茹,焦连伟,严正,等.高压直流输电动态建模与仿真[J].中国电机工程学报,2003,23(12):28-32. Qi Qingru,Jiao Lianwei,Yan Zheng,et al. Modeling and simulation of HVDC with dynamic phasors[J].Proceedings of the CSEE,2003, 23(12):28-32(in Chinese).
吴桂芳.我国±500kV直流输电工程的电磁环境问题[J].电网技术,2005,29(11):5-8. Wu Guifang.Electromagnetic environment problem brought about by ±500kV DC transmission project in China[J].Power System Technology,2005,29(11):5-8(in Chinese).
[11]
刘云,王明新,曾南超.高压直流工程逆变站最后断路器跳闸功能配置研究[J].电网技术,2006,30(6):35-40. Liu Yun,Wang Mingxin,Zeng Nanchao.Configuration principle of last breaker trip equipment in inverter station of HVDC[J].Power System Technology,2006,30(6):35-40 (in Chinese).
[12]
杨万开,王华伟.灵宝背靠背系统调试技术报告[R].北京:中国电力科学研究院,2005.
[13]
胡学浩,丁功扬.全国电网互联中采用高压直流输电时国外经验之借鉴[J].电网技术,1998,22(5):64-67,70. Hu Xuehao,Ding Gongyang.Adopting HVDC transmission scheme in nation power network interconnection with reference to experiences of other countries[J].Power System Technology,1998,22(5):64-67,70(in Chinese).
[14]
余建国,杨明,罗海云,等.天广直流输电工程换流站中新技术的应用[J].电网技术,2002,26(4):52-54. Yu Jianguo,Yang Ming,Luo Haiyun,et al.Application of new technologies in converter stations of Tian-Guang HVDC transmission project[J].Power System Technology,2002,26(4):52-54(in Chinese).