[1] | 何永秀,黄文杰,谭忠富,等.电力备用市场化运营需求研究[J].中国电机工程学报,2004,24(3):46-50.
|
[2] | He Yongxiu,Huang Wenjie,Tan Zhongfu,et al.A study on demand of electricity reserve market in marketing operation[J].Proceedings of the CSEE,2004,24(3):46-50(in Chinese).
|
[3] | 杨梓俊,丁明,孙昕.电力市场下综合考虑系统可靠性和旋转备用效益的机组组合[J].电网技术,2003,27(6):13-18.
|
[4] | Yang Zijun,Ding Ming,Sun Xin.Unit commitment problem under the condition of electricity market considering system reliability and benefit from spinning reserve[J].Power System Technology,2003, 27(6):13-18(in Chinese).
|
[5] | 谭伦农,张保会,市场环境下的事故备用容量[J].中国电机工程学报,2004,22(11):54-58.
|
[6] | Tan Lunnong,Zhang Baohui.Reserve capacity for accident in power market environment[J].Proceedings of the CSEE,2004,22(11): 54-58(in Chinese).
|
[7] | 焦连伟,文福拴,祁达才,等.电力市场中辅助服务的获取与定价[J].电网技术,2002,26(7):1-6.
|
[8] | Jiao Lianwei,Wen Fushuan,Qi Dacai,et al.Procurement and pricing of ancillary services in electricity markets[J].Power System Technology,2002,26(7):1-6(in Chinese).
|
[9] | Oren S S.Design of ancillary service markets[C].Proceedings of the 34th IEEE Hawaii International Conference on System Sciences,Hawaii,2001.
|
[10] | Liu Y,Alaywan Z,Liu S,et al.A rational buyer's algorithm used for ancillary service procurement[C].IEEE Power Engineering Society Winter Meeting,Singapore,2000.
|
[11] | 刘宝碇,赵瑞清.随机规划与模糊规划[M].北京:清华大学出版社,1998.
|
[12] | 杨宁,文福拴.基于机会约束规划的输电系统规划方法[J].电力系统自动化,2004,28(14):23-27.
|
[13] | Yang Ning,Wen Fushaun.Transmission system expansion planning based on chance constrained programming[J].Automation of Electric Power Systems,2004,28(14):23-27(in Chinese).
|
[14] | 马新顺,文福拴,刘建新.构造发电公司最优报价策略的机会约束规划方法[J].电网技术,2005,29(10):35-39.
|
[15] | Ma Xinshun,Wen Fushuan,Liu Jianxin.A chance constrained programming based approach for building optimal bidding strategies for generation companies with risk management[J].Power System Technology,2005,29(10):35-39(in Chinese).
|
[16] | Wang J X,Wang X F,Wu Y.Operating reserve model in power market[J].IEEE Trans on Power Systems,2005,20(1):223-229.
|
[17] | Tseng C L,Oren S S,Svoboda A,et al.Price-based adaptive spinning reserve requirements in power system scheduling[J].International Journal of Electrical Power and Energy Systems,1999,21(2): 137-145.
|
[18] | Yu C W,Zhao X S,Wen F S,et al.Pricing and procurement of operating reserves in competitive pool-based electricity markets [J].Journal of Electric Power Systems Research,2005,73(1):37-43.
|
[19] | 张国全,王秀丽,王锡凡.电力市场中旋转备用的效益和成本分析[J].电力系统自动化,2000,24(21):14-18.
|
[20] | Zhang Guoquan,Wang Xiuli,Wang Xifan.Study on benefits and costs of spinning reserve capacity in power market[J].Automation of Electric Power Systems,2000,24(21):14-18(in Chinese).
|
[21] | Chan C Y,Chan T K,Ni Y X,et al.A decentralized approach for operating reserve procurement[C].Proceeding of 6th International Conference on APSCOM,Hong Kong,2003.
|
[22] | 孟祥星,韩学山.不确定性因素引起备用的探讨[J].电网技术, 2005,29(1):30-34.
|
[23] | Meng Xiangxing,Han Xueshan.Discussion on reserve caused by uncertainty factors[J].Power System Technology,2005,29(1):30-34(in Chinese).
|