Xiao Jun,Luo Fengzhang,Wang Chengshan.An interval-based method for evaluation and decision-making of power system planning projects[J].Power System Technology,2004,28(7):62-67(in Chinese).
Liu Baozhu,Zhu Tao,Yu Jilai.Multilevel fuzzy comprehensive assessment for forewarning grade of voltage state and tendency in power systems[J].Power System technology,2005,29(24):31-36(in Chinese).
Xiao Jun,Gao Haixia,Ge Shaoyun,et al.Evaluation method and case study of urban medium voltage distribution network[J].Power System technology,2005,29(20):77-81(in Chinese).
[13]
张焰.电网规划中的模糊可靠性评估方法[J].中国电机工程学报,2000,20(11):77-80.
[14]
Zhang Yan.The evaluation method of fuzzy reliability in electric power network planning[J].Proceedings of the CSEE,2000,20 (11):77-80(in Chinese).
Xiao Jun,Luo Fengzhang,Wang Chenshan,et al.Design and application of a multi-attribute decision-making[J].Power System Technology,2005,29(2):9-13(in Chinese).
[18]
Pan J,Teklu Y,Rahman S,et al.An interval-based MADM approach to the identification of candidate alternatives in strategic resource planning[J].IEEE Transactions on Power Systems,2000,15(4):1441-1446.
[19]
Satty T L.The analytic hierarchy process[M].NewYork:McGraw- Hill Inc.,1980.
Chang Xianrong,Xing Jinfeng,Zhang Jie.Dispatcher training evaluation based on multi-grade fuzzy comprehensive evaluation method[J].Power System Technology,2005,29(17):30-34(in Chinese).