[1] | 牛东晓,曹树华,赵磊,等.电力负荷预测技术及其应用[M].北京:中国电力出版社,1999.
|
[2] | Chen J F,Wang W M,Huang C M.Analysis of an adaptive time-series autoregressive moving-average(ARMA) model for short-term load forecasting[J].Electric Power Systems Research,1995,34(3):187-196.
|
[3] | 谢宏,陈志业,牛东晓,等.基于小波分解与气象因素影响的电力系统日负荷预测模型研究[J].中国电机工程学报,2001,21(5):5-10.
|
[4] | 邰能灵,侯志俭,李涛,等.基于小波分析的电力系统短期负荷预测方法[J].中国电机工程学报,2003,23(1):45-50.
|
[5] | Tai Nengling,Hou Zhijian,Li Tao,et al.New principle based on wavelet transform for power system short-term load forecasting [J].Proceedings of the CSEE,2003,23(1):45-50(in Chinese).
|
[6] | Rahaman S,Bhatnagar R.An expert system based algorithm for short term load forecasting[J].IEEE Trans on Power Systems,1988, 3(2):392-399.
|
[7] | Hiroyuki Mori,Atsushi Yuihara.Deterministic annealing clustering for ANN-based short-term load forecasting[J].IEEE Trans on Power Systems,2001,16(3):545-551.
|
[8] | Ling S H,Leung F H F,Lam H K.Short-term electric load forecasting based on a neural fuzzy network[J].IEEE Trans on Industial Electronics,2003,50(6):1305-1316.
|
[9] | 马文晓,白晓民,沐连顺.基于人工神经网络和模糊推理的短期负荷预测方法[J].电网技术,2003,27(5):29-32.
|
[10] | Ma Wenxiao,Bai Xiaomin,Mu Lianshun.Short term load forecasting using artificial neural network and fuzzy inference [J].Power System Technology,2003,27(5):29-32(in Chinese).
|
[11] | 姜勇.基于模糊聚类的神经网络短期负荷预测方法[J].电网技术,2003,27(2):45-49.
|
[12] | Jiang Yong.Short-term load forecasting using a neural network based on fuzzy clustering[J].Power System Technology,2003,27(2):45-49(in Chinese).
|
[13] | Xie Hong,Chen Zhiye,Niu Dongxiao,et al.The research of daily load forecasting model based on wavelet decomposing and climate influencing[J].Proceedings of the CSEE,2001,21(5):5-10(in Chinese).
|
[14] | 赵剑剑,张步涵,程时杰,等.一种基于径向基函数的短期负荷预测方法[J].电网技术,2003,27(6):22-25.
|
[15] | Zhao Jianjian, Zhang Buhan,Cheng Shijie,et al.A deterministic anneal clustering based short-term load forecasting method with radial basis function network[J].Power System Technology,2003,27(6):22-25(in Chinese).
|
[16] | 冉启文,单永正,王骐,等.电力系统短期负荷预报的小波-神经网络-PARIMA方法[J].中国电机工程学报,2003,23(3):38-42.
|
[17] | Ran Qiwen,Shan Yongzheng,Wang Qi,et al.Wavelet-neural networks-PARIMA method for power system short term load forecasting[J].Proceedings of the CSEE,2003,23(3):38-42(in Chinese).
|
[18] | 谢开贵,李春燕,俞集辉.基于遗传算法的短期组合预测模型[J].电网技术,2001,25(8):20-23.
|
[19] | Xie Kaigui,Li Chunyan,Yu Jihui.Genetic algorithm based combination forecasting model for short term load[J].Power System Technology,2001,25(8):20-23(in Chinese).
|
[20] | 史德明,李林川,宋建文.基于灰色预测和神经网络的电力系统负荷预测[J].电网技术,2001,25(12):14-17.
|
[21] | Shi Deming, Li Linchuan, Song Jianwen. Power system load forecasting based upon combination of gray forecast and artificial neural network[J].Power System Technology,2001,25(12):14-17(in Chinese).
|
[22] | 李林川,吕冬,武文杰.一种简化的电力系统负荷线性组合预测法[J].电网技术,2002,26(10):10-13.
|
[23] | Li Linchuan,Lü Dong,Wu Wenjie.A linear combination based simplified load forecasting method for power system[J].Power System Technology,2002,26(10):10-13(in Chinese).
|
[24] | 李金颖,牛东晓.非线性季节型电力负荷灰色组合预测研究[J].电网技术,2003,27(25):26-28.
|
[25] | Li Jinying,Niu Dongxiao.Study on gray combined forecasting of nonlinear sersonal power load[J].Power System Technology,2003,27(25):26-28(in Chinese).
|
[26] | 刘为,顾洁.电力系统短期负荷预测的高木-关野模型研究[J].电力系统及其自动化学报,2003,15:45-48.
|
[27] | Liu Wei,Gu Jie.Study on the TAKAJI-SUGENO model of short-term load forecasting for power system[J].Proceedings of the EPSA,2003,15:45-48(in Chinese).
|
[28] | 邰能灵,侯志俭.小波模糊神经网络在电力系统短期负荷预测中的应用[J].中国电机工程学报,2004,24(1):24-29.
|
[29] | Tai Nengling,Hou Zhijian.New short-term load forecasting principle with the wavelet transform fuzzy neural network for the power systems[J].Proceedings of the CSEE,2004,24(1):24-29(in Chinese).
|
[30] | 闻新,周露,李翔,等.MATLAB神经网络仿真与应用[M].北京:科学出版社,2003.
|
[31] | Liang R H,Cheng C C.Combined regression-fuzzy approach for short-term load forecasting[J].IEE Proc.-Gener.Transm.Distrib,2000,147(4):261-266.
|