电网技术  2007 

系统备用容量优化问题综述

, PP. 41-46

Keywords: 备用容量,协调优化,可中断负荷,风险管理,电力市场

Full-Text   Cite this paper   Add to My Lib

Abstract:

从应对系统可能出现的多种容量事故角度,发电侧备用容量(reservecapacityofgenerationside,RCGS)与需求侧可中断负荷(interruptibleload,IL)容量都可作为系统备用容量。为有效提高备用容量配置和稳定控制的经济性,以及抑制RCGS在备用容量市场上的市场力,应充分利用各类备用手段的经济互补性,从风险管理的角度对其加以协调。文中在建立市场环境下系统备用容量体系的基础上,基于风险管理与协调优化的观点,对目前系统备用容量优化方面的问题进行了综述。

References

[1]  孟祥星,韩学山.不确定性因素引起备用的探讨[J].电网技术,2005,29(1):30-34.
[2]  Meng Xiangxing,Han Xueshan.Discussion on reserve caused by uncertain facts[J].Power System Technology,2005,29(1):30-34(in Chinese).
[3]  薛禹胜.电力市场稳定性与电力系统稳定性的相互影响[J].电力系统自动化,2002,26(21):1-6.
[4]  Xue Yusheng.Interactions between power market stability and power system stability[J].Automation of Electric Power Systems,2002,26(21):1-6(in Chinese).
[5]  王锡凡.电力市场条件下电网的安全保证体系[J].电网技术,2004,28(9):7-13.
[6]  Wang Xifan.Electric network security setup in electricity market environment[J].Power System Technology,2004,28(9):7-13(in Chinese).
[7]  谭伦农,张保会.市场环境下的事故备用容量[J].中国电机工程学报,2002,22(11):54-58.
[8]  Tan Lunnong,Zhang Baohui.Reserve capacity for accident in power market environment[J].Proceedings of the CSEE,2002,22(11):54-58(in Chinese).
[9]  薛禹胜,罗运虎,李碧君,等.关于可中断负荷参与系统备用的评述[J].电力系统自动化,2007,31(10):1-6.
[10]  Xue Yusheng,Luo Yunhu,Li Bijun,et al.A review of interruptible load participating system reserve[J].Automation of Electric Power Systems,2007,31(10):1-6(in Chinese).
[11]  杨炳元,吴集光,刘俊勇,等.计及可中断负荷影响的阻塞管理定价模型研究[J].电网技术,2005,29(9):41-45.
[12]  Yang Bingyuan,Wu Jiguang,Liu Junyong,et al.Research on pricing model of congestion management considering influence of partitioned interruptible load[J].Power System Technology,2005,29(9):41-45(in Chinese).
[13]  He Yongxiu,Huang Wenjie,Tan Zhongfu,et al.A study on demand of electricity reserve market in marketing operation[J].Proceedings of the CSEE,2004,24(3):46-50(in Chinese).
[14]  赖业宁,薛禹胜,王海风.电力市场稳定性及其风险管理[J].电力系统自动化,2003,27(12):18-24.
[15]  Lai Yening,Xue Yusheng,Wang Haifeng.Electricity market stability and its risk management[J].Automation of Electric Power Systems,2003,27(12):18-24(in Chinese).
[16]  王建学.电力市场中的备用容量问题研究[D].西安:西安交通大学,2003.
[17]  赖业宁,薛禹胜,汪德星,等.备用容量服务市场的风险决策[J].电力系统自动化,2006,30(16):1-5.
[18]  Lai Yening,Xue Yusheng,Wang Dexing,et al.Risk decision-marking for reserve capacity market[J].Automation of Electric Power Systems,2006,30(16):1-5(in Chinese).
[19]  Chen C S,Lue J T.Interruptible load control for Taiwan Power Company[J].IEEE Trans on Power Systems,1990,5(2):460-465.
[20]  任震,邝新武,黄雯莹.电力市场中可中断电价的设计[J].华南理工大学学报,2006,34(4):70-74.
[21]  Ren Zhen,Kuang Xinwu,Huang Wenying.Design of interruptible price in electricity market[J].Journal of South University of Technology,2006,34(4):70-74(in Chinese).
[22]  Bhattacharya K,Bollen H J,Daalder J E.Real time optimal interruptible tariff mechanism incorporating utility-customer interactions[J].IEEE Trans on Power Systems,2000,15(2):700-706.
[23]  Wang Jianxue,Wang Xifan,Ding Xiaoying.The forward contract model of interruptible load in power market[C].IEEE PES Transmission and Distribution Conference,Dalian,China,2005:1-5.
[24]  Wang Jianxue,Wang Xifan,Zhang Xian.The flexible operating reserve model in the power market[J].Proceedings of the CSEE,2005,25(18):20-27(in Chinese).
[25]  王乐,余志伟,文福拴.基于机会约束规划的最优旋转备用容量确定[J].电网技术,2006,30(20):14-19.
[26]  Wang Le,Yu Zhiwei,Wen Fushuan.A chance-constrained programming approach to determine requirement of optimal spinning reserve capacity[J].Power System Technology,2006,30(20):14-19(in Chinese).
[27]  Majumdar S,Chattopadhyay D,Parikh J.Interruptible load management using optimal power flow analysis[J].IEEE Trans on Power Systems,1996,11(2):715-720.
[28]  Wadaed Uturbey,Antonio Simoes Costa.Interruptible load management assessment via dynamic optimal power flow[C].2003 IEEE Bologna Power Tech Conference,Bologna,Italy,2003.
[29]  孙昕,童明光,赵庆波,等.二级备用辅助服务市场中可中断负荷管理模型研究[J].中国电机工程学报,2004,24(3):30-33.
[30]  Sun Xin,Tong Mingguang,Zhao Qingbo,et al.A study on management model of secondary reserve for ancillary services market[J].Proceedings of the CSEE,2004,24(3):30-33(in Chinese).
[31]  吴集光,刘俊勇,牛怀平,等.电力市场环境下最优备用容量的确定[J].电力系统自动化,2005,29(15):10-13.
[32]  Wu Jiguang,Liu Junyong,Niu Huaiping,et al.Determination of optimal reserve capacity in electricity market environment [J].Automation of Electric Power Systems,2005,29(15):10-13(in Chinese).
[33]  葛炬,张粒子.可中断负荷参与的备用市场的帕累托优化模型[J].电力系统自动化,2006,30(9):34-37.
[34]  Ge Ju,Zhang Lizi.Pareto optimality model of reserve market including interruptible load as participants[J].Automation of Electric Power Systems,2006,30(9):34-37(in Chinese).
[35]  郭永基.电力系统可靠性分析[M].北京:清华大学出版社,2003.
[36]  薛禹胜.时空协调的大停电防御框架:(三)各道防线内部的优化和不同防线之间的协调[J].电力系统自动化,2006,30(3):1-10.
[37]  Xue Yusheng.Space-time cooperative framework for defending blackouts: part III optimization and cooperation of defense-lines [J].Automation of Electric Power Systems,2006,30(3):1-10(in Chinese).
[38]  薛禹胜.暂态稳定预防控制和紧急控制的协调[J].电力系统自动化,2002,26(4):1-4.
[39]  Xue Yusheng.Coordinations of preventive control and emergency control for transient stability[J].Automation of Electric Power Systems,2002,26(4):1-4(in Chinese).
[40]  鲁丽娟,候云鹤,吴耀武,等.计及用户需求弹性影响的输电阻塞解决方案研究[J].电网技术,2004,28(5):46-49.
[41]  Lu Lijuan,Hou Yunhe,Wu Yaowu,et al.A research on transmission congestion management considering influence of consumers’ demand elasticity[J].Power System Technology,2004,28(5):46-49(in Chinese).
[42]  何永秀,黄文杰,谭忠富,等.电力备用市场化运营需求研究[J].中国电机工程学报,2004,24(3):46-50.
[43]  王建学,王锡凡,张显.电力市场中弹性运行备用研究[J].中国电机工程学报,2005,25(18):20-27.
[44]  王建学,王锡凡,王秀丽.电力市场可中断负荷合同模型研究[J].中国电机工程学报,2005,25(9):11-16.
[45]  Wang Jianxue,Wang Xifan,Wang Xiuli.Study on model of interruptible load contract in power market[J].Proceedings of the CSEE,2005,25(9):11-16(in Chinese).
[46]  罗运虎,薛禹胜,Ledwich G,等.低电价与高赔偿2种可中断负荷的协调[J].电力系统自动化,2007,31(11):17-21.
[47]  Luo Yunhu,Xue Yusheng,Ledwich G,et al.Coordination of low price interruptible load and high compensation interruptible load [J].
[48]  Automation of Electric Power Systems,2007,31(11):17-21(in Chinese).
[49]  罗运虎,薛禹胜,Dong Z,等.发电容量充裕性的混合优化[J].电力系统自动化,2007,31(12):30-35.
[50]  Luo Yunhu,Xue Yusheng,Dong Z,et al.Hybrid optimization of generation capacity adequacy[J].Automation of Electric Power Systems,2007,31(12):30-35(in Chinese).
[51]  郭金,江伟,谭忠富.风险条件下供电公司最优购电问题研究[J].电网技术,2004,28(11):18-22.
[52]  Guo Jin,Jiang Wei,Tan Zhongfu.Research on optimized power purchasing of power suppliers under risk condition[J].Power System Technology,2004,28(11):18-22(in Chinese).
[53]  韩金山,张世英,张文泉,等.零售市场单一卖方的最优风险管理策略[J].电网技术,2004,28(13):54-59.
[54]  Han Jinshan,Zhang Shiying,Zhang Wenquan,et al.Optimal risk management strategies for single seller in retail market[J].Power System Technology,2004,28(13):54-59(in Chinese).
[55]  周明,李庚银,严正,等.考虑备用需求和风险的供电企业最优购电计划[J].电网技术,2005,29(3):33-38.
[56]  Zhou Ming,Li Gengyin,Yan Zheng,et al.Optimal electricity procurement schedule for load service entities incorporating with reserve and risks[J].Power System Technology,2005,29(3):33-38(in Chinese).

Full-Text

Contact Us

service@oalib.com

QQ:3279437679