[1] | 张文泉.电力技术经济评价理论、方法与应用[M].北京:中国电力出版社,2004.
|
[2] | 程浩忠,张焰.电力网络规划方法与应用[M].上海:科学技术出版社,2002.
|
[3] | 黄武忠,孔德明,钟丹红,等.模糊综合评判在电网远期规划中的应用[J].供用电,2001,18(5):7-9.
|
[4] | Wu Li,Wu Jie,Zhou Lerong.Fuzzy multi-objective comprehensive decision on transmission projects[J].Power System Technology,1999,23(3):19-22(in Chinese).
|
[5] | 肖峻,王成山,周敏.基于区间层次分析法的城市电网规划综合评判决策[J].中国电机工程学报,2004,24(4):50-57.
|
[6] | 陈大宇,肖峻,王成山.基于模糊层次分析法的城市电网规划综合评判[J].东北电力技术,2003,(9):5-14.
|
[7] | 罗道平,肖笛.数据包络分析(DEA)在电力工业的应用[J].系统工程理论与实践,1996,(4):60-66.
|
[8] | 张铁峰,苑津莎,王江涛,等.基于数据包络分析的配电线路利用有效性研究[J].电网技术,2006,30(4):97-102.
|
[9] | Zhang Tiefeng,Yuan Jinsha,Wang Jiangtao,et al.Utilization availability of distribution lines based on data envelopment analysis [J].Power System Technology,2006,30(4):97-102(in Chinese).
|
[10] | 秦寿康.综合评价原理与应用[M].北京:电子工业出版社,2003.
|
[11] | 郭均鹏,吴育华,李汶华.基于VRS的SE-DEA模型可行性的研究[J].系统工程学报,2003,18(6):511-514.
|
[12] | Guo Junpeng,Wu Yuhua,Li Wenhua.Study on feasibility of variable returns-to-scale based super-efficiency data envelopment analysis model[J].Journal of Systems Engineering,2003,18(6):511-514(in Chinese).
|
[13] | 龙海明,李花.德尔菲法及其在社科成果评奖中的应用[J].中国高校师资研究,2006,(3):27-32.
|
[14] | 陈坚红,盛德仁,李蔚,等.火电厂工程多目标综合评价模型[J].中国电机工程学报,2002,22(12):152-155.
|
[15] | Chen Jianhong,Sheng Deren,Li Wei,et al.A model of multi-objective comprehensive evaluation for power plant projects [J].Proceedings of the CSEE,2002,22(12):152-155(in Chinese).
|
[16] | 上海电力公司.安亭—上海国际汽车城高压配电网发展规划[Z].上海:上海电力公司,2003.
|
[17] | 上海电力公司.安亭—上海国际汽车城核心区中压配电网发展规划[Z].上海:上海电力公司,2002.
|
[18] | 上海电力公司.安亭新镇一期中压配电网发展规划[Z].上海:上海电力公司,2002.
|
[19] | Huang Wuzhong,Kong Dejie,Zhong Danhong,et al.Application of fuzzy comprehensive judgment in long-term network planning [J].Distribution & Utilization,2001,18(5):7-9(in Chinese).
|
[20] | 周任军,徐志生,杨洪明.模糊优选在电网规划综合决策中的应用[J].郑州大学学报(工学版),2005,26(2):23-26.
|
[21] | Zhou Renjun,Xu Zhisheng,Yang Hongming.An application of multi-attribute fuzzy optimal selection to the evaluation of grid planning[J].Journal of Zhengzhou University (Engineering Science),2005,26(2):23-26(in Chinese).
|
[22] | 伍力,吴捷,周乐荣.输变电工程项目的模糊多目标综合评价决策[J].电网技术,1999,23(3):19-22.
|
[23] | Xiao Jun,Wang Chengshan,Zhou Min.An IAHP-based MADM method in urban power system planning[J].Proceedings of the CSEE,2004,24(4):50-57(in Chinese).
|
[24] | 肖峻,罗凤章,王成山.一种基于区间分析的电网规划项目决策方法[J].电网技术,2004,28(7):62-67.
|
[25] | Xiao Jun,Luo Fengzhang,Wang Chengshan.An interval-based method for evaluation and decision-making of power system planning projects[J].Power System Technology,2004,28(7):62-67(in Chinese).
|
[26] | Chen Dayu,Xiao Jun,Wang Chengshan.Comprehensive judgment of policy-making for urban power network based on fuzzy analytic hierarchy process[J].Northeast Electric Power Technology,2003,(9):5-14(in Chinese).
|
[27] | Mika G,Miki T.Comparison of productive and cost efficiencies among Japanese and US electric utilities[J].The International Journal of Management Science,1998,26(2):177-194.
|
[28] | Pahwa A,Feng Xiaoming,Lubkeman D.Performance evaluation of electric distribution utilities based on data envelopment analysis [J].IEEE Trans on Power Systems,2003,18(1):400-405.
|
[29] | 魏权龄,岳明.DEA概论与C2R模型-数据包络分析(一)[J].系统工程理论与实践,1989,(1):58-69.
|
[30] | Seiford L M.Data envelopment analysis:the evolution of state of the art[J].Journal of Production Analysis,1996(7):99-137.
|
[31] | Andersen P,Petersen N C.A procedure for ranking efficient untits in data envelopment analysis[J].Management Science,1993,39(10):1261-1264.
|