[1] | Mielczarski W,Michalik G.Open electricity markets in Australia:contract and spot price[J].IEE Power Engineering Review,1999,19(2):49-53.
|
[2] | 宋永华,孙锦鑫.英国将推出电力市场新模式[J].电网技术,1999,23 (8):69-73.
|
[3] | Fahrioglu M,Alvarado F L.Designing incentive compatible contracts for effective demand management[J].IEEE Trans.on PWRS,2000,15(4):1255-1260.
|
[4] | 张少华,方勇,李渝曾. 电力市场中的激励机制设计[J].电网技术,2003,27(1):52-56.
|
[5] | Zhang Shaohua,Fang Yong,Li Yuzeng.The mechanism design of incentives in electricity markets[J].Power System Technology,2003,27(1):52-56.
|
[6] | 方勇,李渝曾.合理回收容量成本的激励性电力竞价机制的建模研究[J].中国电机工程学报,2004,24 (1):18-23.
|
[7] | Fang Yong,Li Yuzeng.A research on modeling the incentive electricity bidding mechanism of reasonable capacity cost recovery [J].Proceedings of the CSEE,2004,24(1):18-23.
|
[8] | 方勇,李渝曾.电力市场中激励性可中断负荷合同的建模与实施研究[J].电网技术,2004,28(17):41-45.
|
[9] | Fang Yong,Li Yuzeng.Modeling and implementation of incentive interruptible load contracts in electricity markets[J].Power System Technology,2004,28(17):41-45.
|
[10] | 让-雅克·拉丰,大卫·马赫蒂摩.激励理论(委托-代理模型)[M].北京:中国人民大学出版社,1996.
|
[11] | 童明光,刘敏,曾鸣,等.二级备用辅助服务市场中可中断负荷管理模型研究[J].中国电机工程学报,2004,24(3):30-34.
|
[12] | Tong Mingguang,Liu Min,Zeng ming,et al.A study or management model of secondary reserve for ancillary services markets [J].Proceedings of the CSEE,2004,24(3):30-34.
|
[13] | 王锡凡.分段竞价的电力市场[J].中国电机工程学报,2001,21(12):1-6.
|
[14] | Wang Xifan.Block bidding model based power market [J].Proceedings of the CSEE,2001,21(12):1-6.
|
[15] | Song Yonghua,Sun Jinxin.The new electricity market model which England will propose[J].Power System Technology,1999,23(8):69-73.
|
[16] | 白利超,康重庆,夏清,等.不确定性电价分析[J].中国电机工程学报,2002,23 (5):36-41.
|
[17] | Bai Lichao,Kang Chongqing,Xia Qing,et al.Analysis on the uncertainty of electricity price[J]. Proceedings of the CSEE,2002,23(5):36-41.
|
[18] | 王锡凡,王秀丽,陈皓勇.电力市场基础[M].西安:西安交通大学出版社,2003.
|
[19] | 张少华,李渝曾,王长军.双向可选择电力远期合同模型[J].电力系统自动化,2001,25(21):28-32.
|
[20] | Zhang Shaohua,Li Yuzeng,Wang Changjun.The model of bilateral optional electric power forward contracts[J].Automation of Electric Power Systems,2001,25(21):28-32.
|
[21] | Gedra T W,Varaiya P P.Markets and pricing or interruptible electric power[J].IEEE Trans. on PWRS,1993,8(1):122-128.
|
[22] | Gedra T W.Optional forward contracts for electric power markets [J].IEEE Trans. on PWRS,1994,9(4):1766-1773.
|
[23] | David A K.Modeling risk in energy contracts with investor owned generation[J].IEE Proc.Pt-C,Gt&D,1994,141(1):75-80.
|
[24] | David A K.Risk modeling in energy contracts between host utilities and BOT plant investors[J].IEEE Trans.on Energy Conversion,1996,11(2):359-365.
|
[25] | Chung T S,Zhang S H,Yu C W,et al.Electricity market risk management using forward contracts with bilateral options[J].IEE Proceedings-Generation,Transmission and Distribution.2003,150(5):588-594.
|
[26] | 张显,王锡凡,王建学,等.可中断电力合同中新型期权的定价[J].中国电机工程学报,2004,24(12):18-23.
|
[27] | Zhang Xian,Wang Xifan,Wang Jianxue,et al.Price for exotic option of interruptible electricity contracts[J].Proceedings of the CSEE, 2004,24(12):18-23.
|