[1] | Cao Shiguang,Liu Zhuo,Yu Erkeng.Research on outage cost and reliability planning[J].Power System Technology.1997,21(9):52-54.
|
[2] | 于会萍,刘继东,程浩忠,等.电网规划方案的成本效益分析与评价研究[J].电网技术,2001,25(7):32-35.
|
[3] | Yu Huiping,Liu Jidong,Cheng Haozhong,et al.Cost-benefit analysis and evaluation of power network planning[J].Power System Technology,2001,25(7):32-35.
|
[4] | 万官泉,任震.考虑馈线自动化的用户停电损失计算[J].电网技术,2005,29(1):24-29.
|
[5] | Wan Guanquan,Ren Zhen.Calculation of customer’s outage cost considering feeder automation[J].Power System Technology,2005, 29(1):24-29.
|
[6] | 朱旭凯,刘文颖,杨以涵,等.考虑综合可靠性因素的电网规划新方法[J].电网技术,2004,28(21):51-54.
|
[7] | 郭永基,鲁宗相,毕见广.东北地区产电比的统计分析[J].电网技术,1999,23(10):56-58.
|
[8] | Guo Yongji,Lu Zongxiang,Bi Jianguang.Statistical analysis of radios output value to unit electric energy consumption[J].Power System Technology,1999,23(10):56-58.
|
[9] | 陈章潮,唐德光.城市电网规划与改造[M].中国电力出版社,1998.
|
[10] | 王成山,王赛一,葛少云,等.中压配电网不同接线模式经济性和可靠性分析[J].电力系统自动化,2002,26(24):34-39.
|
[11] | Wang Chengshan,Wang Saiyi,Ge Shaoyun,et al.Economy and reliability analysis of different connection modes in MV distribution systems[J].Automation of Electric Power Systems,2002,26(24): 34-39.
|
[12] | 肖俊,王跃强,王成山.城市中压配电网接线模式识别[J].电网技术,2003,27(10):92-95.
|
[13] | Xiao Jun,Wang Yueqiang,Wang Chengshan.Automatic identification on connection modes of urban middle voltage distribution system[J].Power System Technology,2003,27(10): 92-95.
|
[14] | 陈庭记,程浩忠,何明,等.城市中压配电网接线模式研究[J].电网技术,2000,24(9):35-38.
|
[15] | Chen Tingji,Cheng Haozhong,He Ming,et al.Research on connection modes on urban middle voltage distribution networds [J].Power System Technology,2000,24(9):35-38.
|
[16] | 万国成,任震,荆勇.等.主馈线分段开关的设置研究[J].中国电机工程学报,2003,23(4):124-127.
|
[17] | Wan Guocheng,Ren Zhen,Jing Yong,et al.Deployment of disconnect switches on main feeder[J].Proceedings of the CSEE, 2003,23(4):124-127.
|
[18] | 谢开贵,周家启.基于免疫算法的配电网开关优化配置模型[J].电力系统自动化,2003,27(15):35-39.
|
[19] | Xie Kaigui,Zhou Jiaqi.Model for optimal switching devices based on immune algorithm in electric distribution networks[J].Automation of Electric Power Systems,2003,27(15):35-39.
|
[20] | 康庆平,卢锦玲,杨国旺.确定城市10kV配电网线路最优分段数的一种方法[J].电力系统自动化,2000,1(10):57-59.
|
[21] | Kang Qingping,Lu Jinling,Yang Guowang.A method for optimizing the number of sections of feeder on 10kV distribution network [J].Automation of Electric Power Systems,2000,1(10):57-59.
|
[22] | 郭永基.电力系统可靠性分析[M].清华大学出版社,2003.
|
[23] | Billinton R,Billinton J E.Distribution system reliability indices [J].IEEE Transactions on Power Delivery,1989,4(1):561-568.
|
[24] | 徐其迎,李日隆,陈树挺.一种基于VB编程的配电网可靠性评估算法[J].电网技术,2004,28(3):48-50.
|
[25] | Xu Qiying,Li Rilong,Chen Shuting.A new reliability evaluation method for distribution system implemented by visual basic [J].Power System Technology,2004,28(3):48-50.
|
[26] | 陆志峰,周家启.计及开关和母线故障的配电系统可靠性评估[J].电网技术,2002,26(4):26-29.
|
[27] | Lu Zhifeng,Zhou Jiaqi.Reliability evaluation of distribution system considering faults occurred in swiches and buses[J].Power System Technology,2002,26(4):26-29.
|
[28] | 曹世光,柳焯,于尔铿.缺电成本与可靠性规划的研究[J].电网技术,1997,21(9):52-54.
|
[29] | Zhu Xukai,Liu Wenying,Yang Yihan,et al.A new power network planning method by comprehensively considering system reliability factors[J].Power System Technology,2004,28(21):51-54.
|
[30] | Allan R N,Da Silva M G.Evaluation of reliability indices and outage costs in distribution systems[J].IEEE Transactions on Power Systems,1995,10(1):413-419.
|
[31] | Tollefson G,Billinton R ,Wacker G,et al.A Canadian customer survey to assess power system reliability worth[J].IEEE Transactions on Power Systems,1994,9(1):443-450.
|