[1] | 丁宁,吴军基,邹云.基于DSM的峰谷时段划分及分时电价研究[J].电力系统自动化,2001,25(23):9-12.
|
[2] | Ding Ning,Wu Junji,ZouYun.Research of peak and valley time period partition approach and TOU price on DSM[J].Automation of Electric Power Systems,2001,25(23):9-12(in Chinese).
|
[3] | 吴秋伟,汪蕾,邹云.基于DSM和MCP的分时电价的确定与分析[J].电力需求侧管理,2003,5(1):24-29.
|
[4] | Wu Qiuwei,Wang Lei,Zou Yun.Determination and analysis of TOU power price based on DSM and MCP[J].Power Demand Side Management,2003,5(1):24-29(in Chinese).
|
[5] | 王明俊.市场环境下的负荷管理和需求侧管理[J].电网技术,2005,29(5):1-5.
|
[6] | Wang Mingjun.Load management and demand side management in electricity market environment[J].Power System Technology, 2005,29(5):1-5(in Chinese).
|
[7] | 周明,李庚银,倪以信.电力市场下电力需求侧管理实施机制初探[J].电网技术,2005,29(5):6-11.
|
[8] | Zhou Ming,Li Gengyin,Ni Yixin.A preliminary research on implementation mechanism of demand side management under electricity market[J].Power System Technology,2005,29(5):6-11(in Chinese).
|
[9] | 李晖,康重庆,夏清.考虑用户满意度的需求侧管理价格决策模型[J].电网技术,2004,28(23):1-6.
|
[10] | Li Hui,Kang Chongqing,Xia Qing.Price based decision making for demand side management considing consumer satisfaction index [J].Power System Technology,2004,28(23):1-6(in Chinese).
|
[11] | 刘昌,姚建刚,姚文峰,等.基于DSM的分时电价的确定和分析[J].继电器,2005,33(15):57-61.
|
[12] | Liu Chang,Yao Jiangang,Yao Wenfeng,et al.Research of TOU power price model based on DSM[J].Relay,2005,33(15):57-61(in Chinese).
|
[13] | 王剑辉.电力市场中购电风险模型分析[J].电网技术,2005,29(9):46-49.
|
[14] | Wang Jianhui.Analysis on risk model of power purchasing in electricity market[J].Power System Technology,2005,29(9):46-49(in Chinese).
|
[15] | 郭金,江伟,谭忠富.风险条件下供电公司最优购电问题研究[J].电网技术,2004,28(11):18-22.
|
[16] | Guo Jin,Jiang Wei,Tan Zhongfu.Reserch on optimized power purchasing of power suppliers under risk conditions[J].Power System Technology,2004,28(11):18-22(in Chinese).
|
[17] | 韩金山,张世英,张文泉,等.零售市场单一卖方的最优风险管理策略[J].电网技术,2004,28(13):54-59.
|
[18] | Han Jinshan,Zhang Shiying,Zhang Wenquan,et al.Optimal risk mangement strategies for single seller in real market[J].Power system technology,2004,28(13):54-59(in Chinese).
|
[19] | 周明,李庚银,严正,等.考虑备用需求和风险的供电企业最优购电计划[J].电网技术,2005,29(3):32-38.
|
[20] | Zhou Ming,Li GengYin,Yan Zheng,et al.Optimal electricity procurement schedule for load service entities incorporating with reserve and risks[J].Power System Technology,2005,29(3):32-38(in Chinese).
|
[21] | 赵娟,谭忠富,李晓军.分时电价下供电公司盈亏风险分析模型[J].电力需求侧管理,2005,7(1):9-11.
|
[22] | Zhao Juan,Tan Zhongfu,Li Xiaojun.Risk analysis model of supplying power company under TOU price[J].Power Demand Side Management,2005,7(1):9-11(in Chinese).
|
[23] | 秦祯芳,岳顺民,余贻鑫,等.零售端电力市场中的电量电价弹性矩阵[J].电力系统自动化,2004,28(5):16-19.
|
[24] | Qin Zhenfang,Yue Shunmin,Yu Yixin,et al.Price elasticity matrix of demand in current retail power market[J].Automation of Electric Power Systems,2004,28(5):16-19(in Chinese).
|
[25] | 唐捷,任震,胡秀珍.一种可操作的需求侧管理峰谷分时电价定价方法[J].电网技术,2005,29(22):71-75.
|
[26] | Tang Jie,Ren Zhen,Hu Xiuzhen.An operable peak-valley time-of-use tariff setting method for demand side management [J].Power System Technology,2004,29(22):71-75(in Chinese).
|