[1] | 栾军,张智刚,寇惠珍,等.提高500kV电网输电能力的技术研究[J].电网技术,2005,29(19):15-17.
|
[2] | 国家电网公司.国家电网公司750 kV输变电示范工程建设总结[M].北京:中国电力出版社,2006.
|
[3] | 西北电力设计院.西北电网“十一五”及2020年电网规划滚动调整[R].西安:西北电力设计院,2005.
|
[4] | 黄明良.拉西瓦水电站接入系统与西北750 kV电网建设方案的研究[J].电网技术,2005,29(13):20-25.
|
[5] | Huang Mingliang.Study on connecting system for Laxiwa hudropower station and construction schemes of 750 kV Northwest China power grid[J].Power System Technology,2005,29(13):20-25(in Chinese).
|
[6] | 郑宝森,郭日彩.中国互联电网的发展[J].电网技术,2003,27(2):1-3.
|
[7] | Zheng Baosen,Guo Ricai.On development of interconnection of power networks in China[J].Power System Technology,2003,27(2):1-3(in Chinese).
|
[8] | 丁新良.750 kV电压等级是西北电网发展的必然选择[J].电网技术,2002,26(3):23-26.
|
[9] | Ding Xinliang.750 kV -An inevitable choice of higher voltage grade for Northwest China power grid[J].Power System Technology,2002,26(3):23-26(in Chinese).
|
[10] | 张惠勤.世界各国750 kV 电网的发展状况[J].电网技术,2002,26(3):37-40.
|
[11] | Zhang Huiqin.Development situation of 750 kV power network in other countries[J].Power System Technology,2002,26(3):37-40(in Chinese).
|
[12] | 王梅义,吴竞昌,蒙定中.大电网系统技术[M].北京:中国电力出版社,1995.
|
[13] | Current Operational Problems Working Group.Operating problems with parallel flows[J].IEEE Trans on Power Systems,1991,6(3):1024-1034.
|
[14] | 高翔,庄侃沁,孙勇.西欧电网“11.4”大停电事故的启示[J].电网技术,2007,31(1):25-31.
|
[15] | Gao Xiang,Zhuang Kanqin,Sun Yong.Lessons annd enlightment from balckout occurred in UCTE grid[J].Power System Technology,2007,31(1):25-31(in Chinese).
|
[16] | 葛睿,董昱,吕跃春.欧洲“11.4”大停电事故分析及其对我国电网运行工作的启示[J].电网技术,2007,31(2):1-6.
|
[17] | Ge Rui,Dong Yu,Lü Yuechun.Analysis of large scale blackout in UCTE power grid and lessons to be drawn to power grid operation in China[J].Power System Technology,2007,31(2):1-6(in Chinese).
|
[18] | Luan Jun,Zhang Zhigang,Kou Huizhen,et al.Research on the methods to improve the transfer capability of 500kV power grid[J].Power System Technology,2005,29(19):15-17(in Chinese).
|
[19] | 蔡洋.电网调度管理须与电网发展俱进——北美东北电网事故浅析[J].电网技术,2004,28(8):6-9.
|
[20] | Cai Yang.Power system operation control should be in step with expansion –A brief analysis of large scope blackout in interconnected Northeast America power grid[J].Power System Technology,2004,28(8):6-9(in Chinese).
|
[21] | DL755—2001,电力系统安全稳定导则[S].
|
[22] | 侯春青,郑惠萍.2005年山西中南部500kV及220 kV电网的电磁环网运行方式研究[J].电网技术,2005,27(10):80-84.
|
[23] | Hou Chunqing,Zheng Huiping.Research on parallel operation of 500 kV and 220 kV power networks in south and central part of Shanxi power grid in 2005[J].Power System Technology,2005,27(10):80-84(in Chinese).
|
[24] | 刘振亚.特高压交流输电技术研究成果专辑[M].北京:中国电力出版社,2006.
|
[25] | 王万军,王维超,张其明,等.陕西电网中期运行方式研究[J].电网技术,2004,28(2):14-16.
|
[26] | Wang Wanjun,Wang Weichao,Zhang Qiming,et al.Research on medium-term operation of Shaanxi power system[J].Power System Technology,2004,28(2):14-16(in Chinese).
|
[27] | 西北电网有限公司,华北电力大学.在电磁环网条件下的750 kV电网运行方式的研究与编制[R].西安:西北电网有限公司,2006.
|
[28] | 西北电力调度交易中心.2006年度西北电力系统运行方式[R].西安:西北电力调度交易中心,2006.
|
[29] | Granelli G,Montagna M,Zanellini F,et al.A genetic algorithm based procedure to optimize system topology against parallel flows[J].IEEE Trans on Power Systems,2006,21(1):333-340.
|
[30] | Lawrence Berkeley National Laboratory.WECC-CAISO specific needs for loop flow monitoring,management,near term prediction and probabilistic assessment,and prototype monitoring system design [R].Los Angeles,California,2005.
|