Chen Yalun,Li Zhiguo.Study of unbalance factor and induced current for Yimin-Fengtun 500 kV double-circuit tower line[J].Power System Technology,1995,19(6):13-17.
[4]
傅光祖.500 kV架空输电线路导线换位方式的探讨[J].浙江电力,1986,5(4):1-9.
[5]
韦钢,黄金生.同杆井架多回线序参数及不平衡计算[J].电网技术,1998,22(10):8-11.
[6]
Wei Gang,Huang Jinsheng.Sequence parameters and unbalance coefficients calculation for parallel multi-circuit transmission lines on the same tower[J].Power System Technology,1998,22(10):8-11(in Chinese).
Wei Gang,Zhang Ziyang,Fang Zhengliang,et al.Analysis of unbalance of the parallel multi-circuit transmission lines[J].High Voltage Engineering,2005,31(4):9-11(in Chinese).
Wang Jiancheng,Zhang Tao,Wang Qiwen,et al.Testing and analysis of three phase current unbalance at 500kV outlet of the 2nd Qinshan nuclear power plant[J].Power System Technology,2005,29(5):76-80(in Chinese).
Ding Hongfa,Duan Xianzhong.Unbalance issue caused by un-transposed transmission lines and its solution[J].Power System Technology,2004,28(19):24-28(in Chinese).
Shang Liqun,Shi Wei.Study on secondary arc current and recovery voltage on double-circuit lines on the same pole [J].High Voltage Engineering,2003,29(10):22-23(in Chinese).
Wang Xiaotong,Lin Jiming,Chen Gesong,et al.Electromagnetic transient analysis of 500 kV submarine cable transmission system from Guangdong to Hainan[J].Power System Technology,2008,32(12):6-11(in Chinese).