[1] | 迟永宁,刘燕华,王伟胜,等.风电接入对电力系统的影响[J].电网技术,2007,31(3):77-81.
|
[2] | Chi Yongning,Liu Yanhua,Wang Weisheng,et al.Study on impact of wind power integration on power system[J].Power System Technology,2007,31(3):77-81(in Chinese).
|
[3] | 孙元章,吴俊,李国杰.风力发电对电力系统的影响[J].电网技术,2007,31(20):55-62.
|
[4] | Sun Yuanzhang,Wu Jun,Li Guojie.Influence research of wind power generation on power systems[J].Power System Technology,2007,31(20):55-62(in Chinese).
|
[5] | 戴慧珠,王伟胜,迟永宁.风电场接入电力系统研究的新进展[J].电网技术,2007,31(20):16-23.
|
[6] | Dai Huizhu,Wang Weisheng,Chi Yongning.Recent wind power integration study in China[J].Power System Technology,2007,31(20):16-23(in Chinese).
|
[7] | 雷亚洲,王伟胜,印永华,等.一种静态安全约束下确定电力系统风电准入功率极限的优化方法[J].中国电机工程学报,2001,21(6):25-29.
|
[8] | Lei Yazhou,Wang Weisheng,Yin Yonghua,et al.An optimization method for determining wind power penetration limit power system under static security constraints[J].Proceedings of the CSEE,2001,21(6):25-29(in Chinese).
|
[9] | 陈树勇,戴慧珠,白晓民,等.风电场的发电可靠性模型及应用[J].中国电机工程学报,2000,20(3):26-28.
|
[10] | Chen Shuyong,Dai Huizhu,Bai Xiaomin,et al.Reliability model of wind power plants and its application[J].Proceedings of the CSEE,2000,20(3):26-28(in Chinese).
|
[11] | 郑国强,鲍海,陈树勇.基于近似线性规划的风电场穿透功率极限的优化算法[J].中国电机工程学报,2004,24(10):68-71.
|
[12] | Zheng Guoqiang,Bao Hai,Chen Shuyong.Amending algorithm for wind farm penetration optimization based approximate linear programming method[J].Proceedings of the CSEE,2004,24(10):68-71(in Chinese).
|
[13] | 申洪,梁军,戴慧珠.基于电力系统暂态稳定分析的风电场穿透功率极限计算[J].电网技术,2002,26(8):8-11.
|
[14] | Shen Hong,Liang Jun,Dai Huizhu.Calculation of wind farm penetration based on power system transient stability analysis [J].Power System Technology,2002,26(8):8-11(in Chinese).
|
[15] | 吴俊玲,周双喜,孙建锋,等.并网风力发电的最大注入功率分析[J].电网技术,2004,28(20):28-32.
|
[16] | Wu Junling,Zhou Shuangxi,Sun Jianfeng,et al.Analysis on maximum power injection of wind power resource[J].Power System Technology,2004,28(20):28-32(in Chinese).
|
[17] | 雷亚洲,王伟胜,印永华,等.风电对电力系统运行的价值分析[J].电网技术,2002,26(5):10-14.
|
[18] | Lei Yazhou,Wang Weisheng,Yin Yonghua,et al.Analysis of wind power value to power system operation[J].Power System Technology,2002,26(5):10-14(in Chinese).
|
[19] | 周双喜,王海超,陈寿孙.风力发电运行价值分析[J].电网技术,2006,30(14):99-104.
|
[20] | Zhou Shuangxi,Wang Haichao,Chen Shousun.Analysis on operation value of wind power resources[J].Power System Technology,2006,30(14):99-104(in Chinese).
|
[21] | 杨校生.给风电一个合理价格[J].中国电力管理,2004(10):22-24.
|
[22] | Yang Jiaosheng.To wind power at a reasonable price[J].China Power Management,2004(10):22-24(in Chinese).
|
[23] | Hetzer J,Yu D C,Bhattarai K.An economic dispatch model incorporating wind power[J].IEEE Trans on Energy Conversion,2008,23(2):603-611.
|
[24] | Mahdad B,Bouktir T,Srairi K.Fuzzy controlled genetic algorithm for environmental/economic dispatch with shunt facts devices[J].IEEE Trans on Energy Conversion,1997,12(2):148-155.
|
[25] | Chen Chun-Lung,Lee Tsung-Ying.Impact analysis of transmission capacity constraints on wind power penetration and production cost in generation dispatch[C].IEEE International Conference on Intelligent Systems Applications to Power Systems,Taiwan,2007.
|
[26] | Makarov Y V,Loutan C,Jian Ma,et al.Impacts of integration of wind generation on regulation and load following requirements of California power systems[J].The 5th International Conference on European Electricity Market,Lisboa,2008.
|
[27] | Agrawal S,Panigrahi B K,Tiwar M K.Multiobjective particle swarm algorithm with fuzzy clustering for electrical power dispatch[J].IEEE Trans on Evolutionary Computation,2008,12(5):529-541.
|
[28] | 杜松怀,温步瀛,蒋传文.电力市场[M].北京:中国电力出版社,2004:96.
|
[29] | Roy S.Market constrained optimal planning for wind energy conversion Systems over multiple installation sites[J].IEEE Trans on Energy Conversion,2002,17(1):124-129.
|
[30] | 李渝,范高锋,李庆,等.达坂城风电接入系统对新疆电网电能质量的影响[J].电网技术,2007,31(6):88-92.
|
[31] | Li Yu,Fan Gaofeng,Li Qing,et al.The impact of Dabancheng wind farm integration on power quality of Xinjiang power grid[J].Power System Technology,2007,31(6):88-92(in Chinese).
|
[32] | 席皛,李海燕,孔庆东.风电场投切对地区电网电压的影响[J].电网技术,2008,32(10):58-62.
|
[33] | Xi Xiao,Li Haiyan,Kong Qingdong.Influence of connecting and disconnecting wind farm with regional power network on voltage of the latter[J].Power System Technology,2008,32(10):58-62(in Chinese).
|
[34] | Chen Chun-Lung.Optimal wind thermal generating unit commitment [J].IEEE Trans on Power Systems,2001,16(4):273-280.
|
[35] | Chen Chun-Lung,Chen Nanming.Direct search method for solving economic dispatch problem considering transmission capacity constraints [J].IEEE Trans on Power Systems,2001,16(4):764-769.
|