[1] | 柳国良,张新育,胡兆明.变电站模块化建设研究综述[J].电网技术,2008,32(14):36-38.
|
[2] | Liu Guoliang,Zhang Xinyu,Hu Zhaoming.A survey on modularized construction of power substations[J].Power System Technology,2008,32(14):36-38(in Chinese).
|
[3] | 郭日彩,袁兆祥,李宝金.法国、韩国变电站典型设计概况及对我国电网工程的启示[J].电网技术,2006,30(6):73-76.
|
[4] | Guo Ricai,Yuan Zhaoxiang,Li Baojin.A survey on typical design of substations in France and Korea and relevant suggestion to power network engineering in China[J].Power System Technology,2006,30(6):73-76(in Chinese).
|
[5] | 张大立.城市中压配电网接线与开闭所的配置[J].电网技术,2007,31(7):83-86.
|
[6] | 刘自发,张建华.基于改进多组织粒子群体优化算法的配电网络变电站选址定容[J].中国电机工程学报,2007,27(1):105-111.
|
[7] | Liu Zifa,Zhang Jianhua.Optimal planning of substation locating and sizing based on refined multi-team PSO algorithm[J].Proceedings of the CSEE,2007,27(1):105-111(in Chinese).
|
[8] | 金义雄,程浩忠,严健勇,等.改进粒子群算法及其在输电网规划中的应用[J].中国电机工程学报,2005,25(4):46-70.
|
[9] | Jin Yixiong,Cheng Haozhong,Yan Jianyong,et al.Improved particle swarm optimization method and its application in power transmission network planning[J].Proceedings of the CSEE,2005,25(4):46-70(in Chinese).
|
[10] | 金义雄,程浩忠,严健勇,等.基于局优分支优化的粒子群收敛保证算法及其在电网规划中的应用[J].中国电机工程学报,2005,25(23):12-18.
|
[11] | Jin Yixiong,Cheng Haozhong,Yan Jianyong,et al.Local best embranchment based convergence guarantee particle swarm optimization and its use in transmission network planning [J].Proceedings of the CSEE,2005,25(23):12-18(in Chinese).
|
[12] | 靳晓凌,赵建国.基于改进二进制粒子群优化算法的负荷均衡化配电网重构[J].电网技术,2005,29(23):40-43.
|
[13] | 郭日彩,许子智,徐鑫乾.220 kV和110 kV变电站典型设计研究与应用[J].电网技术,2007,31(6):23-55.
|
[14] | Guo Ricai,Xu Zizhi,Xu Xinqian.Research and application of typical design for 220 kV and 110 kV substations[J].Power System Technology,2007,31(6):23-55(in Chinese).
|
[15] | 符杨,胡荣,朱兰.城区配电网实用规划方案的研制[J].上海电力学院学报,2006,22(1):36-38.
|
[16] | Fu Yang,Hu Rong,Zhu Lan.Development of applied urban distribution electric network planning technique[J].Journal of Shanghai University of Electric Power,2006,22(1):36-38(in Chinese).
|
[17] | 王成山,王赛一.基于空间GIS的城市中压配电网络智能规划(三)带开闭所接线模式的自动布局[J].电力系统自动化,2004,28(7):58-61.
|
[18] | Wang Chengshan,Wang Saiyi.The intelligent planning of urban mid-voltage distribution network based on spatial GIS,part three:Automatic routing of switching station network[J].Automation of Electric Power Systems,2004,28(7):58-61(in Chinese).
|
[19] | 王赛一.基于地理信息系统10kV开关站自动布局[J].供用电,2006,23(5):23-26.
|
[20] | Wang Saiyi.Automatic layout of 10 kV switching station based on the spatial GIS[J].Distribution & Utilization,2006,23(5):23-26(in Chinese).
|
[21] | 张李盈,范明天.配电网综合规划模型与算法的研究[J].中国电机工程学报,2004,24(6):60-64.
|
[22] | Zhang Liying,Fan Mingtian.A new model and methodology for distribution network integration planning[J].Proceedings of the CSEE,2004,24(6):60-64(in Chinese).
|
[23] | 王成山,魏海洋,肖峻,等.变电站选址定容两阶段优化规划方法[J].电力系统自动化,2005,29(4):62-66.
|
[24] | Wang Chengshan,Wei Haiyang,Xiao Jun,et al.Two-phase optimization planning approach to substation locating and sizing [J].Automation of Electric Power Systems,2005,29(4):62-66(in Chinese).
|
[25] | 林济铿,李鸿路,罗萍萍,等.统一考虑变电站和网架优化的配电网综合规划[J].电力系统自动化,2006,30(19):42-46.
|
[26] | Lin Jikeng,Li Honglu,Luo Pingping,et al.Integrated planning for the distribution system with the unified optimization of substation and network frame[J].Automation of Electric Power Systems,2006,30(19):42-46(in Chinese).
|
[27] | 段刚,余贻鑫.输配电系统综合规划的全局优化算法[J].中国电机工程学报,2002,22(4):109-113.
|
[28] | Duan Gang,Yu Yixin.Global optimization for power transmission and distribution system planning[J].Proceedings of the CSEE,2002,22(4):109-113(in Chinese).
|
[29] | 刘军,张建华,赵江河.基于模糊微分演化算法的配电网综合规划[J].电网技术,2008,32(11):40-44.
|
[30] | Liu Jun,Zhang Jianhua,Zhao Jianghe.Application of fuzzy differential evolution algorithm in comprehensive planning of distribution network[J].Power System Technology,2008,32(11):40-44(in Chinese).
|
[31] | Jin Xiaoling,Zhao Jianguo.Distribution network reconfiguration for load balancing based on improved binary particle swarm optimization [J].Power System Technology,2005,29(23):40-43(in Chinese).
|
[32] | 许立雄,吕林,刘俊勇.基于改进粒子群优化算法的配电网络重构[J].电力系统自动化,2006,30(7):27-30.
|
[33] | Xu Lixiong,Lü Lin,Liu Junyong.Modified particle swarm optimization for reconfiguration of distribution network[J].Automation of Electric Power Systems,2006,30(7):27-30(in Chinese).
|
[34] | 王伟,张粒子,麻秀范.基于结构元理论的中压配电网接线模式[J].电力系统自动化,2006,30(11):35-40.
|
[35] | Wang Wei,Zhang Lizi,Ma Xiufan.Connection modes in medium-voltage distribution systems based on configuration-unit theory[J].Automation of Electric Power Systems,2006,30(11): 35-40(in Chinese).
|
[36] | 李欣然,李培强,朱湘有,等.基于最优化原理的高压配电网建设规模评估[J].电力系统自动化,2007,31(4):46-50.
|
[37] | Li Xinran,Li Peiqiang,Zhu Xiangyou,et al.Evaluation construction size of district high voltage distribution networks[J].Automation of Electric Power Systems,2007,31(4):46-50(in Chinese).
|
[38] | 刘友强,李欣然.变电站经济容量和经济供电半径的探讨[J].广东电力,2005,18(11):7-9.
|
[39] | Liu Youqiang,Li Xinran.Discussion on economical capacity and economical power supply radius for transformer substations [J].Guangdong Electric Power,2005,18(11):7-9(in Chinese).
|
[40] | 徐珍霞,顾洁.离散粒子群优化算法在变电站选址中的应用[J].电气应用,2006,25(4):35-38.
|
[41] | Xu Zhenxia,Gu Jie.Application of discrete particle swarm optimization algorithm to substation location[J].Electric Application,2006,25(4):35-38(in Chinese).
|