[1] | 郎永强,张学广,徐殿国,等.双馈电机风电场无功功率分析及控制策略[J].中国电机工程学报,2007,27(9):77-82.
|
[2] | Lang Yongqiang,Zhang Xueguang,Xu Dianguo,et al.Reactive power analysis and control of doubly fed induction generator wind farm[J].Proceedings of the CSEE,2007,27(9):77-82(in Chinese).
|
[3] | Niiranen J.Voltage dip ride through of a doubly-fed generator equipped with an active crowbar[C].Nordic Wind Power Conference,Helsinki,Finland,2004.
|
[4] | 向大为,杨顺昌,冉立.电网对称故障时双馈感应发电机不脱网运行的系统仿真研究[J].中国电机工程学报,2006,26(10):130-135.
|
[5] | Xiang Dawei,Yang Shunchang,Ran Li.System simulation of a doubly fed induction generation rid-through control for symmetrical grid fault[J].Proceedings of the CSEE,2006,26(10):130-135(in Chinese).
|
[6] | Johan M,Sjoerd W H de H.Ridethrough of wind trubines with doubly-fed induction generation during a voltage dip[J].IEEE Trans. on Energy Conversion,2005,20(2):435-441.
|
[7] | Abbey C,Joos G.Effect of low voltage ride through(LVRT) characteristic on voltage stability[J].IEEE Trans. on Industry Applications,2005,42(3):1-7.
|
[8] | 曹娜,李岩春,赵海翔,等.不同风电机组对电网暂态稳定性的影响[J].电网技术,2007,31(9):53-57.
|
[9] | Cao Na,Li Yanchun,Zhao Haixiang,et al.Comparison of effect of different wind turbines on power grid transient stability[J].Power System Technology,2007,31(9):53-57(in Chinese).
|
[10] | 王承煦,张源.风力发电[M].北京:中国电力出版社,2002:48-70.
|
[11] | 叶杭冶.风力发电机组的控制技术[M].北京:机械工业出版社,2002:14-110.
|
[12] | 关宏亮,赵海翔,迟永宁,等.电力系统对并网风电机组承受低电压能力的要求[J].电网技术,2007,31(7):79-82.
|
[13] | Guan Hongliang,Zhao Haixiang,Chi Yongning,et al.Requirment for LVRT capability of wind turbine generator in power system [J].Power System Technology,2007,31(7):79-82(in Chinese).
|
[14] | Trudnowski D J,Gentile A,Khan J M.Fixed-speed wind generator and wind-park modeling for transient stability studies[J].IEEE Trans. on Power System,2004,19(4):1911-1917.
|
[15] | Salman S k,Teo A L J.Windmill modeling consideration and factors influencing the stability of a grid-connected wind power-based embedded generator[J].IEEE Trans. on Power System,2003,18(2):793-803.
|
[16] | Sun Tao,Chen Z,Blaabjerg F.Transient analysis of grid-connected wind turbines with DFIG after an external short-circuit faul [C].Nordic Wind Power Conference,Gothenburg,Sweden,2004.
|
[17] | Chowdhury B H,Chellapilla S.Double-fed induction generation control for variable wind power generation[J].Electric Power Systems Research,2006,76(12):786-800.
|
[18] | 李晶,宋家骅,王伟胜.考虑变频器特性的变速恒频双馈风力发电机组控制策略的研究与仿真[J].电网技术,2004,28(21):ll-l6.
|
[19] | Li Jing,Song Jiahua,Wang Weisheng.Study and dynamic simulation of control strategy for variable speed wind turbine with doubly-fed generator considering frequency converter characteristics[J].Power System Technology,2004,28(21):11-16(in Chinese).
|
[20] | 雷亚洲,Lightbody G.国外风力发电导则及动态模型简介[J].电网技术,2005,29(12):27-32.
|
[21] | Lei Yazhou,Lightbody G.An introduction on wind power grid code and dynamic simulation[J].Power System Technology,2005,29(12):27-32(in Chinese).
|
[22] | 王纯琦,吐尔逊×依不拉音,晁勤.基于Matlab的含风电电网建模与仿真[J].可再生能源,2006,129(5):61-64.
|
[23] | Wang Chunqi,Tuerxun-yibulayin,Chao Qin.Modeling and simulation of the wind power system based on Matlab[J].Renewable Energy,2006,129(5):61-64(in Chinese).
|
[24] | 李晶,宋家骅,王伟胜.大型变速恒频风力发电机组建模与仿真[J].中国电机工程学报,2004,24(6):100-105.
|
[25] | Li Jing,Song Jiahua,Wang Weisheng.Modeling and dynamic simulation of variable speed wind turbine with large capacity [J].Proceedings of the CSEE,2004,24(6):100-105(in Chinese).
|