[1] | Power Automation Equipment,2006,26(7):1-5(in Chinese).
|
[2] | 张保会,姚峰,周德才,等.输电断面安全性保护及其关键技术研究[J].中国电机工程学报,2006,26(21):1-7.
|
[3] | Zhang Baohui,Yao Feng,Zhou Decai,et al.Study on security protection of transmission section and its key technologies [J].Proceedings of the CSEE,2006,26(21):1-7(in Chinese).
|
[4] | 王梅义,吴竟昌,蒙定中.大电网系统技术[M].北京:水利电力出版社,1995:12-15.
|
[5] | 孔涛,王洪涛,刘玉田,等.500 kV~220 kV电磁环网开环研究[J].电力自动化设备,2003,23(12):13-16.
|
[6] | Kong Tao,Wang Hongtao,Liu Yutian,et al.On opening 500 kV~
|
[7] | 22 0 kV electromagnetic loop circuit[J].Electric Power Automation Equipment,2003,23(12):13-16(in Chinese).
|
[8] | 葛睿,董昱,吕跃春.欧洲“11.4”大停电事故分析及其对我国电网运行工作的启示[J].电网技术,2007,31(2):1-6.
|
[9] | Ge Rui,Dong Yu,Lü Yuechun.Analysis of large scale blackout in UCTE power grid and lessons to be drawn to power grid operation in China[J].Power System Technology,2007,31(2):1-6(in Chinese).
|
[10] | 刘振亚.特高压交流输电技术研究成果专辑[M].北京:中国电力出版社,2006:20-22.
|
[11] | 周明,聂艳丽,李庚银,等.电力市场下长期购电方案及风险评估[J].中国电机工程学报,2006,26(6):118-124.
|
[12] | Zhou Ming,Nie Yanli,Li Gengyin,et al.Long-term electricity purchasing scheme and risk assessment in power markets [J].Proceedings of the CSEE,2006,26(6):118-124(in Chinese).
|
[13] | 王守相,张伯明,郭琦.基于时间裕度的全局电力系统暂态安全风险评估[J].中国电机工程学报,2005,25(15):54-58.
|
[14] | Wang Shouxiang,Zhang Boming,Guo Qi.Transient security risk assessment of global power system based on time margin[J].
|
[15] | Current operational problems working group.Operating problems with parallel flows[J].IEEE Trans on Power Systems,1991,6(3):1024-1034.
|
[16] | 叶华,刘玉田,牛新生.500 kV~220 kV电磁环网开环方案模糊综合评价[J].电力自动化设备,2006,26(7):1-5.
|
[17] | Ye Hua,Liu Yutian,Niu Xinsheng.Fuzzy comprehensive evaluation of opening schemes for 500 kV~220 kV electromagnetic loop[J].Electric
|
[18] | 侯春青,郑惠萍.2005年山西中南部500 kV及220 kV电网的电磁环网运行方式研究[J].电网技术,2005,29(10):83-87.
|
[19] | Hou Chunqing,Zheng Huiping.Research on parallel operation of
|
[20] | 50 0 kV and 220 kV power networks in south and central part of Shanxi power grid in 2005[J].Power System Technology,2005,29(10):83-87(in Chinese).
|
[21] | 王万军,王维超,张其明,等.陕西电网中期运行方式研究[J].电网技术,2004,28(2):14-16.
|
[22] | Wang Wanjun,Wang Weichao,Zhang Qiming,et al.Research on medium-term operation of Shaanxi power system[J].Power System Technology,2004,28(2):14-16(in Chinese).
|
[23] | 李晨光,李柏青,汤涌.电磁环网线路无故障跳线和单永故障稳定性分析[J].电力系统自动化,2003,27(1):53-56.
|
[24] | Li Chenguang,Li Baiqing,Tang Yong.Stability analysis of the tripping of line without fault and single line permanent ground fault in an electromagnetically coupled power loop[J].Automation of Electric Power Systems,2003,27(1):53-56(in Chinese).
|
[25] | 潘炜,刘文颖,杨以涵,等.电磁环网条件下西北750 kV电网运行方式的研究[J].电网技术,2007,31(15):33-38.
|
[26] | Pan Wei,Liu Wenying,Yang Yihan,et al.Research on operating modes of 750 kV northwest china power grid electro-magnetically coupled with 330 kV power grid[J].Power System Technology,2007,31(15):33-38(in Chinese).
|
[27] | 刘铠滢,蔡述涛,张尧.基于风险评判的电网规划方法[J].中国电机工程学报,2007,27(12):71-75.
|
[28] | Liu Kaiying,Cai Shutao,Zhang Yao.The power network planning method based on risk evaluation[J].Proceedings of the CSEE,2007,27(12):71-75(in Chinese).
|
[29] | 戴剑锋,周双喜,鲁宗相,等.基于风险的电力系统无功优化问题研究[J].中国电机工程学报,2007,27(12):40-45.
|
[30] | Dai Jianfeng,Zhou Shuangxi,Lu Zongxiang,et al.Study on reactive power optimization based upon risk[J].Proceedings of the CSEE,2007,27(12):40-45(in Chinese).
|
[31] | Mccalley J D,Agrawal B L,Vittal V,et al.A risk-based security index for determining operating limits in stability-limited electric power system[J].IEEE Trans on Power Systems,1997,12(3):1210-1219.
|
[32] | Proceedings of the CSEE,2005,25(15):54-58(in Chinese).
|
[33] | 王英,谈定中,王小英,等.基于风险的暂态稳定性安全评估方法在电力系统中的应用[J].电力系统自动化,2003,27(12):37-41.
|
[34] | Wang Ying,Tan Dingzhong,Wang Xiaoying,et al.Application of risk based transient stability and security assessment in power system [J].Automation of Electric Power Systems,2003,27(12):37-41(in Chinese).
|
[35] | 王克球,张保会,王立永,等.安全稳定控制系统的经济效益评价[J].电网技术,2007,31(6):35-41.
|
[36] | Wang Keqiu,Zhang Baohui,Wang Liyong,et al.Assessment on economic benefit of security and stability control system[J].Power System Technology,2007,31(6):35-41(in Chinese).
|
[37] | Wan H,Mccalley J D,Vittal V,et al.Risk based voltage security assessment[J].IEEE Tran on Power Systems,2000,15(4):1247-1254.
|
[38] | Ni M,Mccalley J D,Vittal V,et al.Online risk-based security assessment[J].IEEE Trans on Power Systems,2003,18(1):258-265.
|