赖永生,刘明波.电力系统动态无功优化问题的快速解耦算法[J].中国电机工程学报,2008,28(7):32-39. Lai Yongsheng,Liu Mingbo.Fast decomposition algorithm for solution of dynamic reactive power optimization problem in power systems[J].Proceedings of the CSEE,2008,28(7):32-39(in Chinese).
[2]
袁辉,徐贵光,周京阳.基于模糊线性规划的无功电压优化[J].电网技术,2003,27(12):42-45. Yuan Hui,Xu Guiguang,Zhou Jingyang.A reactive power/voltage optimization based on fuzzy linear programming[J].Power System Technology,2003,27(12):42-45(in Chinese).
[3]
李玉龙,宗伟,秦立军.电力系统无功优化线性规划问题中线性步长的动态调整策略[J].电网技术,2006,30(18):40-44. Li Yulong,Zong Wei,Qin Lijun.A new strategy of dynamically adjusting step size in linear programming model for power system reactive power optimization[J].Power System Technology,2006,30(18):40-44(in Chinese).
[4]
程莹,刘明波.含离散控制变量的大规模电力系统无功优化[J].中国电机工程学报,2002,22(5):54-60. Cheng Ying,Liu Mingbo.Reactive power optimization of large-scale power systems with discrete control variables[J].Proceedings of the CSEE,2002,22(5):54-60(in Chinese).
[5]
潘珂,韩学山,孟祥星.无功优化内点法中非线性方程组求解规律研究[J].电网技术,2006,30(19):59-65. Pan Ke,Han Xueshan,Meng Xiangxing.Solution principles study of nonlinear correction equations in primal-dual interior point method for reactive power optimization [J].Power System Technology,2006,30(19):59-65(in Chinese).
[6]
Liang R H ,Cheng C K.Dispatch of main transformer ULTC and capacitors in a distribution system[J ].IEEE Trans on Power Delivery,2001,16(4):625-630.
[7]
刘明波,朱春明,钱康龄,等.计及控制设备动作次数约束的动态无功优化算法[J].中国电机工程学报,2004,24(3):34-40. Liu Mingbo,Zhu Chunming,Qian Kangling,et al.Dynamic reactive- power optimization algorithm incorporating action number constraints of control devices[J].Proceedings of the CSEE,2004,24(3):34-40(in Chinese).
[8]
张文,刘玉田.自适应粒子群优化算法及其在无功优化中的运用[J].电网技术,2006,30(8):19-24. Zhang Wen,Liu Yutian.Adaptive particle swarm optimization and its application in reactive power optimization[J].Power System Technology,2006,30(8):19-24(in Chinese).
[9]
何佳,吴耀武,娄素华,等.基于微粒群优化算法的电力系统动态无功优化[J].电网技术,2007,31(2):47-51. He Jia,Wu Yaowu,Lou Suhua,et al.Dynamic reactive power optimization based on particle swarm optimization algorithm [J].Power System Technology,2007,31(2):47-51(in Chinese).
[10]
Deng Y,Ren X,Zhao C,et al.A heuristic and algorithmic combined approach for reactive power optimization with time-varying load demand in distribution systems[J].IEEE Trans on Power Systems,2002,17(4):1068-1072.
[11]
胡泽春,王锡凡.配电网无功优化的分时段控制策略[J].电力系统自动化,2002,26(6):45-49. Hu Zechun,Wang Xifan.Time-interval based control strategy of reactive power optimization in distribution networks[J].Automation of Electric Power Systems,2002,26(6):45-49(in Chinese).
[12]
别朝红,周婷,王锡凡.电力系统多时段无功优化研究[J].西安交通大学学报,2008,42(6):698-702. Bie Zhaohong,Zhou Ting,Wang Xifan.Studies on reactive power optimization based on transition-optimized control strategy[J].Journal of Xi’an Jiaotong University,2008,42(6):698-702(in Chinese).
[13]
方兴,郭志忠.配电网时变无功电压优化方法[J].电力系统自动化,2005,29(9):40-44. Fang Xing,Guo Zhizhong.Optimal time-varying reactive power and voltage control in distribution systems[J].Automation of Electric Power Systems,2005,29(9):40-44(in Chinese).
[14]
张勇军,任震.电力系统动态无功优化的调节代价[J].电力系统自动化,2005,29(2):34-38. Zhang Yongjun,Ren Zhen.Readjusting cost of dynamic optimal reactive power dispatch of power system[J].Automation of Electric Power Systems,2005,29(2):34-38(in Chinese).
[15]
颜伟,田甜,张海兵,等.考虑相邻时段投切次数约束的动态无功优化启发式策略[J].电力系统自动化,2008,32(10):71-75. Yan Wei,Tian Tian,Zhang Haibing,et al.Heuristic strategy for dynamic reactive power optimization incorporating action time constraints between adjacent time intervals[J].Automation of Electric Power Systems,2008,32(10):71-75(in Chinese).