王锡凡.电网可靠性评估的随机网流模型[J].电力系统自动化,2006,30(12):1-6. Wang Xifan.Probabilistic network-flow models for reliability evaluation of power networks[J].Automation of Electric Power Systems,2006,30(12):1-6(in Chinese).
[3]
邹斌,李冬.基于有效容量分布的含风电场电力系统随机生产模拟[J].中国电机工程学报,2012,32(7):23-31. Zou Bin,Li Dong.Power System probabilistic production simulation with wind generation based on available capacity distribution[J]. Proceedings of the CSEE,2012,32(7):23-31(in Chinese).
[4]
Feng C Y,Wang X F.Wang J X.Iteration approach to generator maintenance schedule considering unexpected unit failures in restructured power systems[J].European Transactions on Electrical Power,2011,21(1):142-154.
[5]
周景宏,胡兆光,田建伟,等.含能效电厂的电力系统生产模拟[J].电力系统自动化,2010,34(18):27-31. Zhou Jinghong,Hu Zhaoguang,Tian Jianwei,et al.Power system production simulation including efficiency power plant[J]. Automation of Electric Power Systems,2010,34(18):27-31(in Chinese).
[6]
Wang X F,McDonald J R.Modern power system planning[M]. London:McGraw-Hill,1994:166-209.
[7]
王秀丽,曹成军,王锡凡.互联系统可靠性效益评估方法[J].电网技术,2000,24(7):1-5. Wang XiuLi,Cao Chengjun,Wang Xifan.Reliability benefits evaluation method for power system interconnection[J].Power System Technology,2000,24(7):1-5(in Chinese).
[8]
潘炜,刘文颖,杨以涵,等.电磁环网条件下西北750 kV 电网运行方式的研究[J].电网技术,2007,31(15):33-38. Pan Wei,Liu Wenying,Yang Yihan,et al.Research on operating modes of 750 kV Northwest China power grid electro-magnetically coupled with 330 kV power grid[J].Power System Technology,2007,31(15): 33-38(in Chinese).
[9]
王锡凡.电力市场条件下电网的安全保证体系[J].电网技术,2004,28(9):7-13. Wang Xifan.Electric network security setup in electricity market environment[J].Power System Technology,2004,28(9):7-13(in Chinese).
[10]
王建学,王锡凡,陈天恩,等.分段竞价在区域电力市场中的应用方案[J].电力系统自动化,2009,33(9):47-51. Wang Jianxue,Wang Xifan,Chen Tian?en,et al.An application scheme of block bidding theory in a regional power market[J]. Automation of Electric Power Systems,2009,33(9):47-51(in Chinese).
[11]
李翔,肖鸣,李阳坡,等.西电东送交流断面功率波动空间的分析及建议[J].南方电网技术,2011,5(2):12-16. Li Xiang,Xiao Ming,Li Yangpo,et al.Analysis of AC section power luctuation in west-to-east electricity transmission project and related suggestion[J].Southern Power System Technology,2011,5(2):12-16(in Chinese).
[12]
曹镇,石岩,蒲莹,等.呼辽±500 kV直流工程送端系统次同步振荡仿真分析[J].电网技术,2011,35(6):107-112. Cao Zhen,Shi Yan,Pu Ying,et al.Simulation analysis on subsynchronous oscillation at sending end of ±500 kV power transmission project From Hulun Buir to Liaoning[J].Power System Technology,2011,35(6):107-112(in Chinese).
[13]
张鹏飞,罗承廉,孟远景,等.河南电网送端和受端负荷模型对稳定极限的影响[J].电网技术,2007,31(6):51-55. Zhang Pengfei,Luo Chenglian,Meng Yuanjing,et al.Influence of load models in sending and receiving ends of Henan power grid on tie-line stability limit of sending end[J].Power System Technology,2007,31(6): 51-55(in Chinese).
[14]
Reliability Test System Task Force.The IEEE reliability test system-1996[J].IEEE Transactions on Power Systems,1999,14(3): 1010-1020.