田杰.高压直流控制保护系统的设计与实现[J].电力自动化设备,2005,25(9):10-14. Tian Jie.Design and realization of HVDC control and protection system[J].Electric Power Automation Equipment,2005,25(9):10-14(in Chinese).
[3]
Li W,Choudhury P,Gillespie D,et al.A risk evaluation based approach to replacement strategy of aged HVDC components and its application at BCTC[J].IEEE Trans on Power Delivery,2007,22(3):1834-1840.
[4]
Li W.Probability distribution of HVDC capacity considering repairable and aging failures[J].IEEE Trans on Power Delivery,2006,21(1):523-525.
[5]
Billinton R,Firuzabad M,Faried S O.Reliability evaluation of hybrid multiterminal HVDC subtransmission systems[J].IEE Proceedings on Generation,Transmission and Distribution,2002,149(5):571-577.
[6]
Vukkubtib R,Aborehaid S,Firuzabad M.Well-being analysis for HVDC transmission systems[J].IEEE Trans on Power Systems,1997,12(2):913-918.
[7]
丁明,李小燕,毕锐,等.含VSC-HVDC的交直流混合发输电系统可靠性评估[J].电网技术,2008,32(16):53-58. Ding Ming,Li Xiaoyan,Bi Rui,et al.Reliability assessment of hybrid AC/DC power system containing VSC-HVDC[J].Power System Technology,2008,32(16):53-58(in Chinese).
[8]
周家启,陈炜骏,谢开贵,等.高压直流输电系统可靠性灵敏度分析模型[J].电网技术,2007,31(19):18-23. Zhou Jiaqi,Chen Weijun,Xie Kaigui,et al.A sensitivity analysis model of HVDC transmission system reliability evaluation[J].Power System Technology,2007,31(19):18-23(in Chinese).
[9]
胡博,谢开贵,黎小林,等.HVDC输电系统可靠性跟踪方法[J].中国电机工程学报,2010,30(10):29-35. Hu Bo,Xie Kaigui,Li Xiaolin,et al.Techniques of tracing the unreliability contributions of HVDC transmission system components [J].Proceedings of the CSEE,2010,30(10):29-35(in Chinese).
[10]
谢开贵,王立斌,刘映尚,等.高压直流输电系统最优设备选型模型和算法[J].中国电机工程学报,2010,30(4):16-21. Xie Kaigui,Wang Libin,Liu Yingshang,et al.Optimal model and its algorithm for determining the components type in HVDC systems[J].Proceedings of the CSEE,2010,30(4):16-21(in Chinese).
[11]
喻新强.国家电网公司直流输电系统可靠性统计与分析[J].电网技术,2009,33(12):1-7. Yu Xinqiang.Statistics and analysis on reliability of HVDC power transmission systems of State Grid Corporation of China[J].Power System Technology,2009,33(12):1-7(in Chinese).
[12]
王遂,任震,蒋金良.混合法在高压直流输电系统可靠性评估中的应用[J].电网技术,2007,31(12):42-46. Wang Sui,Ren Zhen,Jiang Jinliang.Application of hybrid reliability evaluation method for HVDC transmission systems[J].Power System Technology,2007,31(12):42-46(in Chinese).
[13]
刘耀,王明新.高压直流输电系统保护装置冗余配置的可靠性分析[J].电网技术,2008,32(5):51-54. Liu Yao,Wang Mingxin.Reliability analysis on redundant configuration of protective relaying for HVDC power transmission system[J].Power System Technology,2008,32(5):51-54(in Chinese).
徐荆州,李扬.基于GO法的复杂配电系统可靠性评估[J].电工技术学报,2007,22(1):149-153. Xu Jingzhou,Li Yang.Reliability assessment of complex distribution system using GO method[J].Transactions of China Electrotechnical Society,2007,22(1):149-153(in Chinese).
[16]
王超,高鹏,徐政,等.GO法在继电保护可靠性评估中的初步应用[J].电力系统自动化,2007,31(24):52-56. Wang Chao,Gao Peng,Xu Zheng,et al.Application of GO methodology in reliability assessment of protective relays[J].Automation of Electrical Power Systems,2007,31(24):52-56 (in Chinese).
[17]
曾克娥.电力系统继电保护装置运行可靠性指标探讨[J].电网技术,2004,28(14):83-85. Zeng Ke?e.Research on operation situation and reliability indices of protective relayings in power system[J].Power System Technology,2004,28(14):83-85(in Chinese).