[1] | Zhao Xia,Zhao Chengyong,Jia Xiufang,et al.Fuzzy synthetic evaluation of power quality based on changeable weight[J].Power System Technology,2005,29(6):11-16(in Chinese).
|
[2] | 田玲.基于层次分析法的购电方案模糊综合评价探讨[J].电网技术,2005,29(7):24-26.
|
[3] | Tian Ling.Research on fuzzy comprehensive evaluation of electric energy purchasing scheme based on analytic hierarchy process [J].Power System Technology,2005,29(7):24-26(in Chinese).
|
[4] | 徐泽水.不确定性多属性决策方法及应用[M].北京:清华大学出版社,2004.
|
[5] | Li Lushu,Lai K K.Fuzzy dynamic programming approach to hybrid multi-objective multistage decision making problems[J].Fuzzy Sets and Systems,2001,117:13-25.
|
[6] | 张文红,陈森发.混合指标层次模糊决策法研究[J].管理科学学报,2005,8(4):7-11.
|
[7] | Tang Zhenfei,Tang Guoqing,Yu Erkeng,et al.Power market dynamic analysis[J].Proceedings of the CSEE,2001,21(12):88-92(in Chinese).
|
[8] | 周明,李庚银,倪以信.电力市场下电力需求侧管理实施机制初探[J].电网技术,2005,29(5):6-11.
|
[9] | Zhou Ming,Li Gengyin,Ni Yixin.A preliminary research on implementation mechanism of demand side management under electricity market[J].Power System Technology,2005,29(5):6-11(in Chinese).
|
[10] | 周明,聂艳丽,李庚银,等.电力市场下长期购电方案及风险评估[J].中国电机工程学报,2006,26(6):116-122.
|
[11] | Zhou Ming,Nie Yanli,Li Gengyin,et al.Long-term electricity purchasing scheme and risk assessment in power markets [J].Proceedings of the CSEE,2006,26(6):116-122(in Chinese).
|
[12] | 伍萱.客户信用管理体系的建立[J].中国电力企业管理,2002,11:33-35.
|
[13] | Wu Xuan.Establishment of customer credit management system [J].China Electricity Enterprise Management,2002,11:33-35(in Chinese).
|
[14] | 李翔,杨淑霞,黄陈锋.基于模糊多属性决策的用电客户信用评价[J].电网技术,2004,28(21):55-59.
|
[15] | Li Xiang,Yang Shuxia,Huang Chenfeng.Credit evaluation of electricity customers based on fuzzy multi-attribute decision making method[J].Power System Technology,2004,28(21):55-59(in Chinese).
|
[16] | 吴为涛.电力客户信用等级分析[D].北京:华北电力大学,2004.
|
[17] | 杨淑霞,吕世森.用电客户信用的主客观评价及分析[J].中国电力,2005,38(6):1-4.Yang Shuxia,Lü Shisen.Subjective and objective credit evaluation on electricity customers and its analysis[J].Electric Power,2005,38(6):1-4(in Chinese).
|
[18] | Liou T S,Wang M J.Ranking fuzzy numbers with integral value [J].Fuzzy Sets and Systems,1992,50:247-255.
|
[19] | 陈坚红,盛德仁,李蔚,等.火电厂工程多目标综合评价模型[J].中国电机工程学报,2002,22(12):152-155.
|
[20] | Chen Jianhong,Sheng Deren,Li Wei,et al.A model of multi-objective comprehensive evaluation for power plant projects [J].Proceedings of the CSEE,2002,22(12):152-155(in Chinese).
|
[21] | 李泓泽,何海峰,郭鑫.厂网分开后独立发电企业竞争力评价的相关问题探讨[J].电网技术,2004,28(20):7-10.
|
[22] | Li Hongze,He Haifeng,Guo Xin.Evaluation of independent generation’s competition competence after separation of grid and generation[J].Power System Technology,2004,28(20):7-10(in Chinese).
|
[23] | 肖峻,王成山,周敏.基于区间层次分析法的城市电网规划综合评判决策[J].中国电机工程学报,2004,24(4):50-57.
|
[24] | Xiao Jun,Wang Chengshan,Zhou Min.An IAHP-based madm method in urban power system planning[J].Proceedings of the CSEE,2004, 24(4):50-57(in Chinese).
|
[25] | 赵霞,赵成勇,贾秀芳,等.基于可变权重的电能质量模糊综合
|
[26] | 评价[J] .电网技术,2005,29(6):11-16.
|
[27] | 曾鸣,程芸,丁声高.我国电力市场的实施方案和相关问题研究[J].电网技术,2000,24(2):69-73.
|
[28] | Zeng Ming,Cheng Yun,Ding Shenggao.Research on solutions of electricity market of China and interrelated problems[J].Power System Technology,2000,24(2):69-73(in Chinese).
|
[29] | 汤振飞,唐国庆,于尔铿,等.电力市场动态分析[J].中国电机工程学报,2001,21(12):88-92.
|
[30] | 方兆本,杨培洁,彭甘霖,等.电力企业客户信用风险管理实证研究[J],电力系统自动化,2005,29(1):61-64.
|
[31] | Fang Zhaoben,Yang Peijie,Peng Ganlin,et al.Empirical research on credit risk management for electric power clients[J].Automation of Electric Power Systems,2005,29(1):61-64(in Chinese).
|
[32] | Zhang Wenhong,Chen Senfa.Research on hybrid hierarchy fuzzy decision-making method[J].Journal of Management Sciences in China,2005,8(4):7-11(in Chinese).
|