胡臻达,武守远,戴朝波.特高压输电线路用新型TCSC方案及其控制策略研究[J].电网技术,2012,36(9):73-80.Hu Zhenda,Wu Shouyuan,Dai Chaobo.A novel TCSC scheme for UHV transmission line and its control strategy [J].Power System Technology,2012,36(9):73-80 (in Chinese).
[2]
詹雄,戴朝波,刘慧文,等.特高压串补平台测量箱的大电流试验研究[J].电网技术,2012,36(1):26-31.Zhan Xiong,Dai Chaobo,Liu Huiwe,et al.Study on high current experiments of measurement box located on platform of series capacitor compensation for UHV power transmission project [J].Power System Technology,2012,36(1):26-31(in Chinese).
陈葛松,林集明,郭剑波,等.500 kV串补站过电压保护研究[J].电网技术,2001,25(2):21-24.Chen Gesong,Lin Jiming,Guo Jianbo,et al.Overvoltage protection for500 kV series compensation station[J].Power System Technology,2001,25(2):21-24(in Chinese).
[6]
ABB.ABB power system reactive power compensation,series compensation[R].Zurich,Switzerland: ABB,1998.
[7]
贺建国,邓军波,施围,等.阳城500 kV输电工程中串补装置的工作条件[J].高电压技术,2001,27(6):34-36.He Jianguo,Deng Junbo,Shi Wei,et al.Working condition of fixed series compensation in the Yangcheng500 kV transmission system[J].High Voltage Engineering,2001,27(6):34-36(in Chinese).
[8]
曹继丰.(平果可控串补工程及其在南方电网中的作用[J].电网技术),2004,28(14):6-9.Cao Jifeng.An introduction to Pingguo TCSC project and its function in China southern power grid[J].Power System Technology,2004,28(14):6-9(in Chinese).
[9]
赵海纲,祁胜利,沈宇.神保500 kV线路串补装置的保护配置及整定原则[J].华北电力技术,2007(11):17-22.Zhao Haigang,Qi Shengli,Shen Yu.Principle of series compensation protection equipments dispositionsetting in Shen-bao500 kV transmission line[J].North China Electric Power,2007(11):17-22(in Chinese).
[10]
蒋卫平,李新年,吕鹏飞,等.500 kV固定串补人工单相接地故障试验现场实测结果分析与仿真计算[J].电网技术,2007,33(1):17-21.Jiang Weiping Li Xinnian,Lü pengfei,et al.Analysis on field measurement results of artificial single phase grounding test for 500 kV fixed series compensator and simulating calculation[J].Power System Technology,2007,33(1):17-21(in Chinese).
郭剑波,武守远,李国富,等.甘肃成碧220kV可控串补国产化示范工程研究[J]. 电网技术,2005,29(19):12-17.Guo Jianbo,Wu Shouyuan,Li Guofu,et al.Study on domestic-manufactured demo project of220kV TCSC for power transmission line from Cheng County to Bikou in Gansu province[J]. Power System Technology,2005,29(19):12-17 (in Chinese).
[13]
王维洲,彭夕岚,何世恩.成碧220kV可控串补装置的运行与维护[J].电网技术,2007,3l(1):50-55.Wang Weizhou,Peng Xilan,He Shien.Operationmaintenance of the first home-made220kV TCSC equipment for transmission line from Cheng County to Bikou in Gansu province[J].Power System Technology,2007,31(1):50-55(in Chinese).
[14]
潘勇破,杨绍远.500 kV河池固定串补运行情况分析[J]. 电网技术,2008,32(增刊21):82-85.Pan Yongbin Yany Shaoyuan.Introductionoperation of fixed series compensation in Hechi [J]. Power System Technology,2008,32(S2)):82-85 (in Chinese).
[15]
祝谦,刘相枪.平果可控串补本体保护介绍[J].电网技术,2004,28(16):73-77.Zhu Qian, Liu Xiangqiang.Protection system of TCSC installed in Pingguo series compensation station[J].Power System Technology,2004,28(16):73-77(in Chinese).
[16]
IEC-60143—2004,Series capacitor for power systems[S].