Wangdee W Billinton R.Predicting bulk electricity system reliability performance indices using sequential Monte Carlo Simulation [J].IEEE Transactions on Power Delivery,2006,21(2):909-917.
[2]
Durga R K,Kushwaha H S,Verma A K,et al.Quantification of epistemicaleatory uncertainties inlevel-1 probabilistic safety assessment studies[J].Reliability Engineering & System Safety,2007(92):947-956.
[3]
王磊,赵书强,张明文.考虑天气变化的输电系统可靠性评估[J].电网技术,2011,35(7):66-70.Wang Lei,Zhao Shuqiang,Zhang Mingwen.Reliability evaluation of transmission system considering weather change[J].Power System Technology,2011,35(7):66-70(in Chinese).
[4]
任震,万官泉,黄雯莹.参数不确定的配电系统可靠性区间评估[J].中国电机工程学报,2003,23(12): 67-73.Ren Zhen,Wan Guanquan,Huang Wenying.An interval approach to evaluate distribution system reliability with parameters uncertainty[J].Proceedings of the CSEE,2003,23(12): 67-73 (in Chinese).
[5]
孙洪波,秦翼鸿,徐国禹.计及数据不确定性的发输电组合系统可靠性评估方法[J].电力系统自动化,1996,20(11):32-34.Sun Hongbo,Qin Yihong,Xu Guoyu.A reliability evaluation a pproach of composite generation and transmission system considering data uncertainty[J].Automation of Electrical Power Systems,1996,20(11):32-34 (in Chinese).
[6]
赵书强,王海巍.基于盲数的配电系统可靠性评估[J].电力系统保护与控制,2011,39(16):7-12.Zhao Shuqiang Wang Haiwei.Power distribution system reliability evaluation based in blind number[J].Power System Protection and Control,2011,39(16):7-12(in Chinese).
[7]
万官泉,张尧,汪穗峰.基于联系数的配电系统可靠性不确定性评估[J].电力系统自动化,2008,32(4):30-34.Wan Guanquan,Zhang Yao,Wang Suifeng.Uncertainty evaluation for distribution system reliability based on connection number [J].Automation of Electrical Power Systems,2008,32(4):30-34 (in Chinese).
[8]
赵渊,谢开贵.电网概率风险评估中元件可靠性参数的不确定性分析[J].电力系统自动化,2011,35(4):6-10.Zhao Yuan Xie Kaigui.Analysis of parameter uncertainty in probabilistic risk assessment of bulk power systems[J].Automation of Electrical Power Systems,2011,35(4):6-10 (in Chinese).
[9]
赵渊,周念成,谢开贵,等.大电力系统可靠性评估的灵敏度分析[J].电网技术,2005,29(24):25-30.Zhao Yuan,Zhou Niancheng,Xie Kaigui,et al.Sensitivity analysis on reliability assessment of bulk power system[J].Power System Technology,2005,29(24):25-30(in Chinese).
[10]
王小滨,黄武浩,楼华辉,等.系统状态空间分割法在电力系统可靠性评估中的应用[J].电网技术,2010,35(10):124-129.Wang Xiaobin,Huang Wuhao,Lou Huahui,et al.Application of state-space partitioning method in power system reliability assessment [J].Power System Technology,2011,35(10):124-129(in Chinese).
[11]
王剑,刘天琪,李兴源.风电场及储能装置对发输电系统可靠性的影响[J].电网技术,2011,35(5):165-170.Wang Jian,Liu Tianqi,Li Xingyuan.Influences of connecting wind farms and energy storage devices to power grid on reliability of power generation and transmission system[J].Power System Technology,2011,35(5):165-170(in Chinese).
[12]
刘威,赵渊,周家启,等.计及风电场的发输配电系统可靠性评估[J].电网技术,2008,32(13):69-74.Liu Wei,Zhao Yuan,Zhou Jiaqi,et al.Reliability assessment of power generation transmission and distribution systems containing wind farms [J].Power System Technology,2008,32(13):69-74(in Chinese).
[13]
赵渊,沈智健,周念成.基于序贯仿真和非参数核密度估计的大电网可靠性评估[J].电力系统自动化,2008,32(6):14-19.Zhao Yuan,Shen Zhijian,Zhou Niancheng.Reliability assessment of bulk power systems utilizing sequential simulation and nonparametric kernel density estimation[J].Automation of Electrical Power Systems,2008,32(6):14-19 (in Chinese).
[14]
Chun-Lien Su.Probabilistic load-flow computation using point estimate method[J].IEEE Trans on Power Systems,2005,20(4):1843-1850.
[15]
Morales J M,Pérez-Ruiz J.Point estimate schemes to solve the probabilistic power flow[J].IEEE Trans on Power System,2007,22(4):1594-1600.
[16]
Za?ropoulos E P,DialynaE N s.Reliability and cost optimization of electronic devices considering the component failure rate uncertainty[J].Reliability Engineering and System Safety,2004(84):271-284.
[17]
I-Tung Yang.Impact of budget uncertainty on project time-cost tradeoff[J].IEEE Transactions on Engineering Management,2005, 52(2):167-174.
[18]
An Introductory Guide to Uncertainty Analysis in EnvironmentalHealth Risk Assessment[R].Prepared by SENES Oak Ridge Inc,Prepared for the US Department of Energy under contractDE-AC05-84OR21400.
[19]
Billinton R,Kumar S,Chowdhury N,et al.A reliability test system for educational purposes-basic data[J].IEEE Transactions on Power Systems,1989,4(3):1238-1244.
[20]
IEEE Subcommittee.IEEE reliability test system[J].IEEE Trans on Power ApparatusSystems,1979,PAS-98(6):2047-2054.附录A:元件故障前工作时间边缘分布函数F((t)的推导)