吴俊玲,周双喜,孙建锋,等.并网风力发电的最大注入功率分析[J].电网技术,2004,28(20):28-32.Wu Junling,Zhou Shuangxi,Sun Jianzhang,et al.Analysis on maximum power injection of wind power resource[J].Power System Technology,2004,28(20):28-32(in Chinese).
[3]
迟永宁,刘燕华,王伟胜,等.风电接入对电力系统的影响[J].电网技术,2007,31(3):77-81.Chi Yongning,Liu Yanhua,Wang Weisheng,et al.Study on impact of wind power integration on power system[J].Power System Technology,2007,31(3):77-81(in Chinese).
[4]
戴慧珠,王伟胜,迟永宁.风电场接入电力系统研究的新进展[J].电网技术,2007,31(20):16-23.Dai Huizhu,Wang Weisheng,Chi Yongning.Recent wind power integration study in China[J].Power System Technology,2007,31(20):16-23(in Chinese).
[5]
孙元章,吴俊,李国杰.风电发电对电力系统的影响[J].电网技术,2007,31(20):55-62.Sun Yuanzhang,Wu Jun,Li Guojie.Influence research of wind power generation on power system[J].Power System Technology,2007,31(20):55-62(in Chinese).
[6]
孙元章,吴俊,李国杰,等.基于风速预测和随机规划的含风电场电力系统动态经济调度[J].中国电机工程学报,2009,29(4):41-47.Sun Yuanzhang,Wu Jun,Li Guojie,et al.Dynamic economic dispatch considering wind power penetration based on wind speed forecasting and stochastic programming[J].Proceedings of the CSEE,2009,29(4):41-47(in Chinese).
[7]
邱威,张建华,刘念.含大型风电场的环境经济调度模型与解法[J].中国电机工程学报,2011,31(19):8-16.Qiu Wei,Zhang Jianhua,Liu Nian.Model and solution for environmental economic dispatch considering large-scale wind power penetration[J].Proceedings of the CSEE,2011,31(19):8-16(in Chinese).
[8]
李强,袁越,李振杰,等.考虑峰谷电价的风电-抽水蓄能联合系统能量转化效益研究[J].电网技术,2009,33(6):13-18.Li Qiang,Yuan Yue,Li Zhenjie,et al.Research on energy shifting benefits of hybrid wind power and pumped hydro storage system considering peak-valley electricity price[J].Power System Technology,2009,33(6):13-18(in Chinese).
[9]
Javier G G,Rocio M R M,Luz M S,et al.Stochastic joint optimization of wind generation and pumped-storage units in an electricity market [J].IEEE Trans on Power Systems,2008,23(2):460-468.
[10]
祝瑞金,邴焕帅,王建军,等.考虑调峰效益和电量效益的风蓄联合运行优化模型及算法[J].华东电力,2012,40(4):564-567.Zhu Ruijin,Bing Huanshuai,Wang Jianjun,et al.Optimization model and algorithm for wind-storage combined operation considering peak shaving and electricity benefits[J].East China Electric Power,2012,40(4):564-567(in Chinese).
[11]
Juan I P D,Alejandro P,Jose R W.Optimal short-term operationsizing of pumped-storage power plants in systems with high penetration of wind energy[C]//Proceedings of the 7th International Conference on the European Energy Market (EEM).Madrid,Spain:IEEE,2010:23-25.
[12]
龙军,莫群芳,曾建.基于随机规划的含风电场的电力系统节能优化调度策略[J].电网技术,2011,35(9):133-138.Long Jun,Mo Qunfang,Zeng Jian.A stochastic programming based short-term optimization scheduling strategy considering energy conservation for power system containing wind farms[J].Power System Technology,2011,35(9):133-138(in Chinese).
[13]
刘宝碇,赵瑞清.随机规划与模糊规划[M].(北京:)清华大学出版社,2004:74-94
[14]
吴杰康,朱健全.机会约束规划下的梯级水电站短期优化调度策略[J].中国电机工程学报,2008,28(13):41-46.Wu Jiekang Zhu Jianquan.A new strategy for short-term scheduling optimization of cascade hydro plants based on chance-constrained programming[J].Proceedings of the CSEE,2008,28(13):41-46(in Chinese).
[15]
李丽,牛奔.粒子群优化算法[M].(北京:)冶金工业出版社,2009:25-33
[16]
王凌,刘波.微粒群优化与调度算法[M].(北京:)清华大学出版社,2008:36-39
[17]
吉平,周孝信,武守远.采用平均风速参与因子法的区域风资源评估[J].中国电机工程学报,2012,32(19):10-15.Ji Ping,Zhou Xiaoxin,Wu Shouyuan.Regional wind energy assessment approach using average wind speed participation factor [J].Proceedings of the CSEE,2012,32(19):10-15(in Chinese).
[18]
HOMER energy.Software[EB/OL].2012-02-01.http:// homerenergy. com/software. html.
[19]
HOMER energy.HOMER version history[EB/OL].2012-02-01.http://homerenergy.com/version_history.html.
[20]
王卿然,谢国辉,张粒子.含风电系统的发用电一体化调度模型[J].电力系统自动化,2011,35(5):15-18.Wang Qingran,Xie Guohui,Zhang Lizi.An integrated generation consumption dispatch model with wind power[J].Automation of Electric Power Systems,2011,35(5):15-18(in Chinese).
[21]
袁铁江,晁勤,吐尔逊×伊不拉音,等.电力市场环境下含风电机组的环境经济调度模型及其仿真[J].电网技术,2009,33(6):67-71.Yuan Tiejiang,Chao Qin,Tuerxun Yibulayin,et al.An environmental economic dispatch model for power grid containing wind power generation units its simulation in electricity market environment[J].Power System Technology,2009,33(6):67-71(in Chinese).
[22]
刘殿海,杨勇平,杨昆,等.计及环境成本的火电机组供电成本研究[J].中国电力,2005,38(9):24-28.Liu Dianhai,Yang Yongping,Yang Kun,et al.Research on the production cost of coal-fired power generating unit with consideration of environmental costs[J].Electric Power,2005,38(9):24-28(in Chinese).附录A
[23]
表A1 1 d内各小时第1个时段风蓄联合优化调度结果
[24]
表A1 Optimal results of wind power and pumped-storage plant in the first period of each hour for a given day MW