迟永宁,刘燕华,王伟胜,等.风电接入对电力系统的影响[J].电网技术,2007,31(3):77-81.Chi Yongning,Liu Yanhua,Wang Weisheng,et al.Study on impact of wind power integration on power system[J].Power System Technology,2007,31(3):77-81(in Chinese).
[2]
雷亚洲.与风电并网相关的研究课题[J].电力系统自动化,2003,27(8):84-89.Lei Yazhou.Studies on wind farm integration into power system [J].Automation of Electric Power Systems,2003,27(8):84-89(in Chinese).
Soman S,Zareipour H,Malik O,et al.A review of wind power and wind speed forecasting methods with different time horizons[C]//North American Power Symposium.Arlington,US:IEEE,2010:1-8.
[6]
沈伟,吴文传,张伯明,等.消纳大规模风电的在线滚动调度策略与模型[J].电力系统自动化,2011,35(22):136-140.Shen Wei,Wu Wenchuan,Zhang Boming,et al.An on-line rolling generation dispatch method and model for accommodating large-scale wind power[J].Automation of Electric Power Systems,2011,35(22):136-140(in Chinese).
[7]
Doherty R,O'Malley M.A new approach to quantify reserve demand in systems with significant installed wind capacity[J].IEEE Transactions on Power Systems,2005,20(2):587-595.
[8]
张海峰,高峰,吴江,等.含风电的电力系统动态经济调度模型[J].电网技术,2013,37(5):1298-1303.Zhang Haifeng,Gao Feng,Wu Jiang,et al.A dynamic economic dispatching model for power grid containing wind power generation system[J].Power System Technology,2013,37(5):1298-1303(in Chinese).
[9]
Yang Shengjie,Yao Jiangang,Sun Qian,et al.Analysis of integrated wind power cost based on dynamic economic dispatch[C]// International Conference on Advanced Power System Automation and Protection (APAP).Beijing,China:IEEE,2010:539-542.
[10]
Ortega-Vazquez,Kirschen D S.Assessing the impact of wind power generation on operating costs[J].IEEE Transactions on Smart Grid,2010,1(3):295-301.
[11]
Meibom P,Weber C,Barth R,et al.Operational costs induced by fluctuating wind power production in Germany and Scandinavia[J]. IET Renewable Power Generation,2009,3(1):75-83.
[12]
Lingfeng Wang,Singh C.Tradeoff between risk and cost in economic dispatch including wind power penetration using particle swarm optimization[C]//International Conference on Power System Technology.Chongqing,China:IEEE PES,2006:22-26.
[13]
田廓,曾鸣,鄢帆,等.考虑环保成本和风电接入影响的动态经济调度模型[J].电网技术,2011,35(6):55-59.Tian Kuo,Zeng Ming,Yan Fan,et al.A dynamic economic scheduling model considering environmental protection cost and impact of connecting wind power to power grid[J].Power System Technology,2011,35(6):55-59(in Chinese).
[14]
董晓天,严正,冯冬涵,等.计及风电出力惩罚成本的电力系统经济调度[J].电网技术,2012,36(8):76-80.Dong Xiaotian,Yan Zheng,Feng Donghan,et al.Power system economic dispatch considering penalty cost of wind farm output [J].Power System Technology,2012,36(8):76-80(in Chinese).
[15]
Miranda V,Pun Sio Hang.Economic dispatch model with fuzzy wind constraints and attitudes of dispatchers[J].IEEE Transactions on Power Systems,2005,20(4):2143-2145.
[16]
白杨,汪洋,夏清,等.水-火-风协调优化的全景安全约束经济调度[J].中国电机工程学报,2013,33(13):1-8.Bai Yang,Wang Yang,Xia Qing,et al.A full-scenario SCED with coordinative optimization of hydro-thermal-wind power [J].Proceedings of the CSEE,2013,33(13):1-8 (in Chinese).
[17]
Chinneck J W,Ramadan K.Linear programming with interval coefficients[J].Journal of Operation and Research Society,2000,51(2):209-220.
[18]
王松岩,李碧君,于继来,等.风速与风电功率预测误差分布的时变特性分析[J].电网技术,2013,37(4):967-973.Wang Songyan,Li Bijun,Yu Jilai,et al.Analysis on time-varying characteristics of probability error in forecast of wind speed and wind power[J].Power System Technology,2013,37(4):967-973(in Chinese).