[1] | 李小明,陈金富,段献忠,等.电源规划模型及求解方法研究综述[J].继电器,2006,34(23):78-81. Li Xiaoming,Chen Jinfu,Duan Xianzhong,et al.A survey of modeling and optimization methods on generation expansion planning [J].Relay,2006,34(23):78-81(in Chinese).
|
[2] | 冯凯,李远德,侯云鹤,等.改进单亲遗传算法在电源规划中的应用[J].电网技术,2004,28(3):11-15. Feng Kai,Li Yuande,Hou Yunhe,et al.Application of improved partheno-genetic algorithm in generation expansion planning of power system[J].Power System Technology,2004,28(3):11-15(in Chinese).
|
[3] | 丁明,石雪梅.基于遗传算法的电力市场环境下电源规划的研究[J].中国电机工程学报,2006,26(21):43-49. Ding Ming,Shi Xuemei.Study of generation expansion planning based on genetic algorithms in the environment of electricity market [J].Proceedings of the CSEE,2006,26(21):43-49(in Chinese).
|
[4] | 周篁.对我国电力行业应用综合资源规划方法的探讨[J].电力需求侧管理,2001,3(4):9-11. Zhou Huang.Considerations of how electric utilities use integrated resources planning[J].Power Demand Side Management,2001,3(4):9-11(in Chinese).
|
[5] | 曾鸣,张艳馥,王鹤,等.基于综合资源规划的供需资源优化组合模型[J].电力系统自动化,2007,31(3):24-28. Zeng Ming,Zhang Yanfu,Wang He,et al.A linear programming on resource combination optimization based on integrated resources planning[J].Automation of Electric Power Systems,2007,31(3):24-28(in Chinese).
|
[6] | 宋宏坤,唐国庆,卢毅,等.江苏省夏季空调负荷分析及需求侧管理措施的削峰效果测算[J].电网技术,2006,30(17):88-91. Song Hongkun,Tang Guoqing,Lu Yi,et al.Analysis on summer air-conditioning loads composition in Jiangsu province and estimation of peak load shifting effect by DSM measures[J].Power System Technology,2006,30(17):88-91(in Chinese).
|
[7] | 王锡凡.电力系统规划基础[M].北京:中国电力出版社,1994:107-119.
|
[8] | 余欣梅,熊信艮,吴耀武,等.电力系统调峰电源规划优化模型探讨及其应用[J].中国电力,2003,36(1):48-51. Yu Xinmei,Xiong Xinyin,Wu Yaowu,et al.Discussion on optimal model for peaking units' expansion planning and its application [J].Electric Power,2003,36(1):48-51(in Chinese).
|
[9] | 王成山,王赛一.市场条件下电力系统规划工作的探讨[J].电力系统自动化,2005,29(9):82-86. Wang Chengshan,Wang Saiyi.Discussion on the power system planning in competitive electricity market[J].Automation of Electric Power Systems,2005,29(9):82-86(in Chinese).
|
[10] | 韩祯祥,黄民翔.2002年国际大电网会议系列报道:电力系统规划和发展[J].电力系统自动化,2003,27(10):8-10. Han Zhenxiang,Huang Minxiang.A review of CIGRE’2002 on power system-planning and development[J].Automation of Electric Power Systems,2003,27(10):8-10(in Chinese).
|
[11] | 贺峰,熊信艮,吴耀武.改进免疫算法在电力系统电源规划中的应用[J].电网技术,2004,28(11):38-44. He Feng,Xiong Xinyin,Wu Yaowu.Application of modified immune algorithm in power system generation expansion planning[J].Power System Technology,2004,28(11):38-44(in Chinese).
|
[12] | 李翔,牛东晓,杨尚东.改进粒子群优化算法在电源规划中的应用[J].中国管理科学,2006,14(6):113-118. Li Xiang,Niu Dongxiao,Yang Shangdong.Application of the improved particle swarm optimization algorithm in the generation expansion planning[J].Chinese Journal of Management Science,2006,14(6):113-118(in Chinese).
|
[13] | 吴耀武,侯云鹤,熊信艮,等.基于遗传算法的电力系统电源规划模型[J].电网技术,1999,23(3):10-14. Wu Yaowu,Hou Yunhe,Xiong Xinyin,et al.A model for generation expansion planning of power system based on genetic algorithm [J].Power System Technology,1999,23(3):10-14(in Chinese).
|
[14] | 陈金富,李小明,段献忠,等.结合独立发电商和环境保护的电源规划模型[J].华中科技大学学报:自然科学版,2006,34(6):55-57. Chen Jinfu,Li Xiaoming,Duan Xianzhong,et al.Generation expansion planning for competitive power markets[J].Journal of Huazhong University of Science and Technology:Nature Science Edition,2006,34(6):55-57(in Chinese).
|
[15] | 周安石,康重庆,洪元瑞,等.电力工业可持续发展的统一规划模型[J].电力系统自动化,2005,29(7):28-32. Zhou Anshi,Kang Chongqing,Hong Yuanrui,et al.Power system expansion planning model considering the strategy of sustainable development[J].Automation of Electric Power Systems,2005,29(7):28-32(in Chinese).
|
[16] | 曾鸣.综合资源规划及其激励理论与应用[M].北京:中国经济出版社,2000:70-73.
|
[17] | 康重庆,相年德,夏清.综合资源规划及其研究热点问题[J].电网技术,1997,21(4):19-24. Kang Chongqing,Xiang Niande,Xia Qing.An introduction to integrated resource planning and its hot topics[J].Power System Technology,1997,21(4):19-24(in Chinese).
|
[18] | 周明,李庚银,倪以信.电力市场下电力需求侧管理实施机制初探[J].电网技术,2005,29(5):6-11. Zhou Ming,Li Gengyin,Ni Yixin.A preliminary research on implementation mechanism of demand side management under electricity market[J].Power System Technology,2005,29(5):6-11(in Chinese).
|
[19] | 胡江溢,王鹤,周昭茂.电力需求侧管理的国际经验及对我国的启示[J].电网技术,2007,31(18):10-13. Hu Jiangyi,Wang He,Zhou Zhaomao.International experience of power demand side management and enlightenment to China [J].Power System Technology,2007,31(18):10-13(in Chinese).
|
[20] | 季强,李强,宋宏坤,等.江苏省能效资源潜力及能效电厂研究[J].电力需求侧管理,2005,7(4):19-22. Ji Qiang,Li Qiang,Song Hongkun,et al.Research on energy efficiency resources potential and efficiency power plant in Jiangsu [J].Power Demand Side Management,2005,7(4):19-22(in Chinese).
|
[21] | 李朝明.广东省能效电厂项目机制研究和探索[J].电力需求侧管理,2007,9(5):15-16. Li Zhaoming.Research of EPP mechanism of Guangdong province [J].Power Demand Side Management,2007,9(5):15-16(in Chinese).
|
[22] | Moskovitz D,Weston F,周伏秋,等.大力推行能效电厂,支持实现国家节能减排目标[J].电力需求侧管理,2007,9(4):2-5. Moskovitz D,Weston F,Zhou Fuqiu,et al.Devote major efforts to practise EPP to support national goal of energy conservation and emission reduction[J].Power Demand Side Management,2007,9(4):2-5(in Chinese).
|
[23] | 王明俊.市场环境下的负荷管理和需求侧管理[J].电网技术,2005,29(5):1-5. Wang Mingjun.Load management and demand side management in electricity market environment[J].Power System Technology,2005,29(5):1-5(in Chinese).
|
[24] | 任震,邝新武,黄雯莹.可中断负荷措施的成本效益分析[J].电网技术,2006,30(7):22-24. Ren Zhen,Kuang Xinwu,Huang Wenying.Cost-benefit analysis for actualizing interruptible load measure[J].Power System Technology,2006,30(7):22-24(in Chinese).
|