电网技术  2009 

计及气象灾害因素的电网规划方法

, PP. 82-87

Keywords: 气象灾害,多目标规划,差异化决策变量,蒙特卡罗仿真

Full-Text   Cite this paper   Add to My Lib

Abstract:

针对电网规划中提高电网抗灾能力和维持合理造价间的矛盾,引入差异化的决策变量,对应差异化的抗灾能力和造价,建立了计及气象灾害因素的多目标电网规划模型,给出了基于蒙特卡罗仿真和多目标遗传算法NSGA-II的求解方法。通过Graver-6系统算例证明了在规划过程中考虑气象灾害因素的必要性,所提方法能求得兼顾经济性与可靠性的规划方案,适用于灾害频发环境下的电网规划。

References

[1]  Billinton R.Reliability evaluation of power systems[M].London (UK):Pitman Advanced Publishing Program,1984:258-277.
[2]  李成榕,吕玉珍,崔翔,等.冰雪灾害条件下我国电网安全运行面临的问题[J].电网技术,2008,32(4):14-22.
[3]  Li Chengrong,Lü Yuzhen,Cui Xiang,et al.Research issues for safe operation of power grid in China under ice-snow disasters[J].Power System Technology,2008,32(4):14-22(in Chinese).
[4]  Billinton R,Singh G D.Reliability assessment of transmission and distribution systems considering repair in adverse weather conditions [C].Proceedings of the 2002 IEEE Canadian Conference on Electrical and Computer Engineering,2002.
[5]  张文亮,于永清,宿志一,等.湖南电网2008年冰雪灾害调研分析[J].电网技术,2008,32(4):1-5.
[6]  Zhang Wenliang,Yu Yongqing,Su Zhiyi,et al.Investigation and analysis of icing and snowing disaster happened in Hunan power grid in 2008[J].Power System Technology,2008,32(4):1-5(in Chinese).
[7]  潘力强,张文磊,汤吉鸿,等.2008年湖南电网特大冰灾事故综述[J].电网技术,2008,32(S2):20-25.
[8]  Pan Liqiang,Zhang Wenlei,Tang Jihong,et al.Overview of the extraordinarily serious ice calamity to Hunan power grid in 2008 [J].Power System Technology,2008,32(S2):20-25(in Chinese).
[9]  薛禹胜,费圣英,卜凡强.极端外部灾害中的停电防御系统构思(一)新的挑战与反思[J].电力系统自动化,2008,32(9):1-6.
[10]  Xue Yusheng,Fei Shengying,Bu Fanqiang.Upgrading the blackout defense scheme against extreme disasters part I:New challenges and reflection[J].Automation of Electric Power Systems,2008,32(9):1-6(in Chinese).
[11]  陈永进,任震,黄雯莹.考虑天气变化的可靠性评估模型与分析[J].电力系统自动化,2004,28(21):17-21.
[12]  Chen Yongjin,Ren Zhen,Huang Wenying.Model and analysis of power system reliability evaluation considering weather change[J].
[13]  Automation of Electric Power Systems,2004,28(21):17-21(in Chinese).
[14]  赵渊,徐焜耀,吴彬.大电力系统可靠性评估的蒙特卡洛仿真及概率密度估计[J].重庆大学学报,2007,30(12):16-20.
[15]  Zhao Yuan,Xu Kunyao,Wu Bin.Bulk power system reliability assessment using Monte Carlo simulation and probability density estimation[J].Journal of Chongqing University,2007,30(12):16- 20(in Chinese).
[16]  程林,郭永基.可靠性评估中多重故障算法的研究[J].清华大学学报,2001,41(3):69-72.
[17]  Cheng Lin,Guo Yongji.Multiple fault assessment algorithm for reliability evaluation[J].Journal of Tsinghua University,2001,41(3):69-72(in Chinese).
[18]  Goldberg D E.A Comparative Analysis of Selection Schemes used in Genetic Algorithms[C].Foundations of Genetic Algorithms,San Mateo,CA,Morgan Kaufmann,1991.
[19]  郑风雷,张尧,吴复立.基于帕累托改进准则的输电扩展规划[J].电网技术,2005,29(10):40-46.
[20]  Zheng Fenglei,Zhang Yao,Wu Fuli.Transmission expansion based on pareto improvement criterion[J].Power System Technology,2005,29(10):40-46(in Chinese).
[21]  王秀丽,李淑慧,陈皓勇,等.基于非支配遗传算法及协同进化算法的多目标多区域电网规划[J].中国电机工程学报,2006,26(12):11-15.
[22]  Wang Xiuli,Li Shuhui,Chen Haoyong,et al.Multi-objective and multi-district transmission planning based on NSGA-II and cooperative co-evolutionary algorithm[J].Proceedings of the CSEE,2006,26(12):11-15(in Chinese).
[23]  刘淳安,王宇平.约束多目标优化问题的进化算法及其收敛性[J].系统工程与电子技术,2007,29(2):277-280.
[24]  赖业宁,薛禹胜,王海风.电力市场稳定性及其风险管理[J].电力系统自动化,2003,27(12):18-24.
[25]  Lai Yening,Xue Yusheng,Wang Haifeng.Electricity market stability and its risk management[J].Automation of Electric Power Systems,2003,27(12):18-24(in Chinese).
[26]  蔡磊,张焰,程浩忠.考虑系统暂态稳定性的电网规划方法[J].电力系统自动化,2001,25(6):45-48.
[27]  Cai Lei,Zhang Yan,Cheng Haozhong.Transmission network planning incorporating transient stability[J].Automation of Electric Power Systems,2001,25(6):45-48(in Chinese).
[28]  程浩忠,高赐威,马则良,等.多目标电网规划的分层最优化方法[J].中国电机工程学报,2003,23(10) :11-16.
[29]  Cheng Haozhong,Gao Ciwei,Ma Zeliang,et al.The lexicographically stratified method for multi-object optimal electric power network planning[J]. Proceedings of the CSEE,2003,23(10):11-16(in Chinese).
[30]  朱旭凯,刘文颖,杨以涵.综合考虑可靠性因数的电网规划新方法[J].电网技术,2004,28(21):51-54.
[31]  Zhu Xukai,Liu Wenying,Yang Yihan.A new power network planning method by comprehensively considering system reliability factors[J].Power System Technology,2004,28(21):51-54(in Chinese).
[32]  Liu Chun’an,Wang Yuping.Evolutionary algorithm for constrained multi-objective optimization problems and its convergence[J].
[33]  Systems Engineering and Electronics,2007,29(2):277-280(in Chinese).
[34]  王锡凡.电力系统规划基础[M].北京:中国电力出版社,1994:142-146.

Full-Text