[1] | 曾鸣,张艳馥,王鹤,等.基于综合资源规划的供需资源优化组合模型[J].电力系统自动化,2007,31(3):24-28.
|
[2] | Zeng Ming,Zhang Yanfu,Wang He,et al.A linear programming on resource combination optimization based on integrated resources planning[J].Automation of Electric Power Systems,2007,31(3):24-28(in Chinese).
|
[3] | Kang Chongqing,Xiang Niande,Xia Qing.An introduction to integrated resource planning and its hot topics[J].Power System Technology,1997,21(4):19-24(in Chinese).
|
[4] | 曾鸣.综合资源规划及其激励理论与应用[M].北京:中国经济出版社,2000:70-73.
|
[5] | Liu Youbo,Liu Junyong,Tang Jieming.An optimal decision-making model for power supply company’s power purchase in weekly market considering price elasticity matrix of demand side and risk[J].Power System Technology,2008,32(18):18-24(in Chinese).
|
[6] | 电力企业联合会.全国电力工业统计快报[EB/OL].http://tj.cec. org.cn.
|
[7] | 李来福,柳焯.需求侧管理在缓解紧急态势中的作用[J].电网技术,2008,32(7):56-60.
|
[8] | Li Laifu,Liu Zhuo.Role of demand side management played in alleviation of urgent situation[J].Power System Technology,2008,32(7):56-60(in Chinese).
|
[9] | 刘明明,高岩.保险理论在需求侧风险管理中的应用[J].电网技术,2007,31(2):66-69.
|
[10] | Liu Mingming,Gao Yan.Application of insurance theory in risk management at demand side[J].Power System Technology,2007,31(2):66-69(in Chinese).
|
[11] | 王绵斌,谭忠富,曹福成,等.考虑不确定性因素的需求侧管理成本效益分析模型[J].电网技术,2006,30(14):59-63.
|
[12] | Wang Mianbin,Tan Zhongfu,Cao Fucheng,et al.Cost-benefit analysis models for DSM project considering uncertain factors[J].Power System Technology,2006,30(14):59-63(in Chinese).
|
[13] | 王明俊.市场环境下的负荷管理和需求侧管理[J].电网技术,2005,29(5):1-5.
|
[14] | Wang Mingjun.Load management and demand side management in electricity market environment[J].Power System Technology,2005,29(5):1-5(in Chinese).
|
[15] | 周明,李庚银,倪以信.电力市场下电力需求侧管理实施机制初探[J].电网技术,2005,29(5):6-11.
|
[16] | Zhou Ming,Li Gengyin,Ni Yixin.A preliminary research on implementation mechanism of demand side management under electricity market[J].Power System Technology,2005,29(5):6-11(in Chinese).
|
[17] | Moskovitz D.Efficiency power plants: policy option[EB/OL].http://www.sdpc.gov.cn/jjyx/dzxqcgl/P020070810341545082138.pdf.
|
[18] | 韩祯祥,黄民翔.2002 年国际大电网会议系列报道:电力系统规划和发展[J].电力系统自动化,2003,27(10):8-10.
|
[19] | Han Zhenxiang,Huang Minxiang.The report of CIGRE in 2002: planning for electric system expansion[J].Automation of Electric Power Systems,2003,27(10):8-10(in Chinese).
|
[20] | 张焰.电网规划中的可靠性成本–效益分析研究[J].电力系统自动化,1999,23(15):33-36.
|
[21] | Zhang Yan.Research on cost-benefit analysis of electric power network reliability planning[J].Automation of Electric Power Systems,1999,23(15):33-36(in Chinese).
|
[22] | 严陆光.我国能源体系发展的主要趋势与特点[J].电网与水力发电进展,2008,24(1):1-2.
|
[23] | Yan Luguang.Main trends and characteristics of energy system and its development in China[J].Advances of Power System & Hydroelectric Engineering,2008,24(1):1-2(in Chinese).
|
[24] | 朱成章.中国电源结构的进一步探讨[J].中外能源,2008,13(1): 2-10.
|
[25] | 曾鸣.电力需求侧管理[M].北京:中国电力出版社,2000:43-56.
|
[26] | 陆海燕.中国和其他发展中国家的综合资源规划及需求侧管理[J].电力需求侧管理,2001,3(5):59-61.
|
[27] | Lu Haiyan.IRP and DSM in China and other developing countries[J].Power Demand Side Management,2001,3(5):59-61(in Chinese).
|
[28] | 胡江溢,王鹤,周昭茂.电力需求侧管理的国际经验及对我国的启示[J].电网技术,2007,31(18):10-14.
|
[29] | Hu Jiangyi,Wang He,Zhou Zhaomao.International experience of power demand side management and enlightenment to China[J].Power System Technology,2007,31(18):10-14(in Chinese).
|
[30] | 张安华.清洁发展机制与电力需求侧管理[J].电力需求侧管理,2007,9(1):1-3.
|
[31] | Zhang Anhua.Clean development mechanism and DSM[J].Power Demand Side Management,2007,9(1):1-3(in Chinese).
|
[32] | 康重庆,相年德,夏清.综合资源规划及其热点问题[J].电网技术,1997,21(4):19-24.
|
[33] | 刘璐洁,胡荣,符杨,等.基于节约理念的配电网规划方案综合评价[J].电网技术,2008,32(16):66-70.
|
[34] | Liu Lujie,Hu Rong,Fu Yang,et al.Comprehensive evaluation of resource economy based distribution network planning scheme[J].Power System Technology,2008,32(16):66-70(in Chinese).
|
[35] | 陈树勇,宋书芳,李兰欣,等.智能电网综述[J].电网技术,2009,33(8):1-7.
|
[36] | Chen Shuyong,Song Shufang,Li Lanxin,et al.Survey on smart grid technology[J].Power System Technology,2009,33(8):1-7(in Chinese).
|
[37] | 谭忠富,陈广娟,乞建勋,等.基于电力资源优化配置的发电侧峰谷分时电价研究[J].电网技术,2008,32(7):61-65.
|
[38] | Tan Zhongfu,Chen Guangjuan,Qi Jianxun,et al.Research on time-of-use at generation side based on optimal configuration of power resources[J].Power System Technology,2008,32(7):61-65(in Chinese).
|
[39] | 刘友波,刘俊勇,唐杰明.计及需求侧电量电价弹性矩阵与风险的供电公司周市场购电优化决策模型[J].电网技术,2008,32(18):18-24.
|
[40] | 国家统计局.中国统计年鉴[EB/OL].http://www.stats.gov.cn/tjsj/ ndsj/2008/indexch.htm.
|