[1] | Tosato F,Quaia S.Reducing voltage sags through fault current limitation[J].IEEE Trans on Power Delivery,2001,16(1):12-17.
|
[2] | Driesen J,Green T,Craenenbroeck T V,et al.The development of power quality markets[C].Proceedings of IEEE PES Winter Meeting,New York,USA,2002.
|
[3] | Yang X D,Li G Y,Zhou M.Optimal allocation of electromagnetic pollution emission rights in power quality market[C].Proceedings of 2006 International Conference on Power System Technology,Chongqing,China,2006.
|
[4] | 金广厚,李庚银,周明.风险管理机制在电能质量市场中的应用[J].电网技术,2005,29(4):70-75.
|
[5] | Jin Guanghou,Li Gengyin,Zhou Ming.Application risk management in power quality market[J].Power System Technology,2005,29(4):70-75(in Chinese).
|
[6] | 金广厚,李庚银,周明.基于质量保险的多质量等级电能定价方法[J].中国电机工程学报,2006,26(9):113-119.
|
[7] | Jin Guanghou,Li Gengyin,Zhou Ming.Quality insurance based electric energy pricing with multi-quality grades[J].Proceedings of
|
[8] | the CSEE,2006,26(9):113-119(in Chinese).
|
[9] | 李寿德,黄桐城.交易成本条件下初始排污权免费分配的决策机制[J].系统工程理论方法应用,2006,15(4):318-322.
|
[10] | Li Shoude,Huang Tongcheng.Free allocation mechanism of initial emissions permits in the condition of transaction cost[J].Systems Engineering-Theory Methodology Applications,2006,15(4):318-322(in Chinese).
|
[11] | 李寿德,黄桐城.基于排污权交易的厂商污染治理投资控制策略及控制过程研究[J].系统工程理论与实践,2008,28(2):153-157.
|
[12] | Li Shoude,Huang Tongcheng.On control strategy and process of pollution abatement investment in the condition of emission trading [J].Systems Engineering-Theory & Practice,2008,28(2):153-157(in Chinese).
|
[13] | 宋海洲.基于相对目标接近度的多目标决策方法及其应用[J].数学的实践与认识,2004,34(5):30-36.
|
[14] | Song Haizhou.A method based on objective adjacent scale for multi-objective decision-making and its application[J].Mathematics in Practice and Theory,2004,34(5):30-36(in Chinese).
|
[15] | 张目,周宗放.一种基于联系度的改进TOPSIS法[J].系统工程,2008,26(8):102-107.
|
[16] | Zhang Mu,Zhou Zongfang.An improved TOPSIS method based on connection degree[J].Systems Engineering,2008,26(8):102-107(in Chinese).
|
[17] | 张堃,周德云.熵权与群组AHP相结合的TOPSIS法多目标威胁评估[J].系统仿真学报,2008,20(7):1661-1664.
|
[18] | Zhang Kun,Zhou Deyun.Application of TOPSIS based on entropy and GD-AHP in evaluating sequence of air target threat[J].Journal of System Simulation,2008,20(7):1661-1664(in Chinese).
|
[19] | Thallam R S,Heydt G T.Power acceptability and voltage sag indices in the three phase sense[C].Proceedings of IEEE PES 2000 Summer Meeting,Seattle,USA,2000.
|
[20] | Shen C C,Lu C N.A voltage sag index considering compatibility between equipment and supply[J].IEEE Trans on Power Delivery,2007,22(2):996-1002.
|
[21] | Lu C N,Shen C C.Estimation of sensitive equipment disruptions due to voltage sags[J].IEEE Trans on Power Delivery,2007,22(2):1122-1137.
|
[22] | Gupta C P,Milanovic J V.Probabilistic assessment of equipment trips due to voltage sags[J].IEEE Trans on Power Delivery,2006,21(2):711-718.
|
[23] | 梁樑,王国华.多层次交互式确定权重的方法[J].系统工程学报,2002,17(4):358-363.
|
[24] | Liang Liang,Wang Guohua.Method of solving weights based on hierarchical and interactive model[J].Journal of System Engineering,2002,17(4):358-363(in Chinese).
|
[25] | 周明,郑雅楠,李庚银,等.考虑分时电价和电能质量的大用户转运费用固定成本的综合分摊方法[J].中国电机工程学报,2008,28(19):125-130.
|
[26] | Zhou Ming,Zheng Yanan,Li Gengyin,et al.Synthetical method for allocating wheeling fixed cost for large consumers considering time-of-use pricing and power quality[J].Proceedings of the CSEE,2008,28(19):125-130(in Chinese).
|