[1] | 肖峻,罗凤章,王成山,等.电网规划综合评判决策系统的设计与应用[J].电网技术,2005,29(2):9-13.
|
[2] | Xiao Jun,Luo Fengzhang,Wang Chenshan et al.Design and application of a multi-attribute decision-making system for power system planning[J].Power System Technology,2005,29(2):9-13(in Chinese).
|
[3] | 孔涛,程浩忠,李钢,等.配电网规划研究综述[J].电网技术,2009,33(19):92-99.
|
[4] | Kong Tao,Cheng Haozhong,Li Gang,et al.Review of power distribution network planning[J].Power System Technology,2009,33(19):92-99(in Chinese).
|
[5] | 肖峻,罗凤章,王成山.一种基于区间分析的电网规划项目决策方法[J].电网技术,2004,28(7):62-67.
|
[6] | Xiao Jun,Luo Fengzhang,Wang Chenshan.An interval-based method for evaluation and decision-making of power system planning projects[J].Power System Technology,2004,28(7):62-67(in Chinese).
|
[7] | 朱旭凯,刘文颖,杨以涵.综合考虑可靠性因素的电网规划新方法[J].电网技术,2004,28(21):51-54.
|
[8] | Zhu Xukai,Liu Wenying,Yang Yihan.A new power network planning method by comprehensively considering system reliability factors[J].Power System Technology,2004,28(21):51-54(in Chinese).
|
[9] | 张弛,程浩忠,奚珣,等.基于层次分析和模糊综合评价法的配电网供电模式选型[J].电网技术,2006,30(22):67-71.
|
[10] | Zhang Chi,Cheng Haozhong,Xi Xun,et al.A study of distribution network feeding modes selection based on analytic hierarchy process and fuzzy comprehensive evaluation[J].Power System Technology,2006,30(22):67-71(in Chinese).
|
[11] | 盛万兴,向驰,赵冲.新农村变电站典型设计[M].北京:中国电力出版社,2008:1-10
|
[12] | 盛万兴,宋晓辉,张莲瑛,等.新农村典型供电模式[M].北京:中国电力出版社,2008:6-27.
|
[13] | 中国电力科学研究院.新农村典型供电模式方案研究报告[R].北京:中国电力科学研究院,2008.
|
[14] | 盛万兴,宋晓辉.新农村典型供电模式[J].农村电气化,2009(8):5-7.
|
[15] | 宋晓辉,盛万兴,史常凯,等.新农村电气化村典型供电模式[J].电力系统自动化,2008,32(17):104-107.
|
[16] | Liang Jinzhao,Xia Qing,Wang Dexing.A new thinking of group based power grid planning for cities with rapid growth[J].Power System Techonolgy,2009,33(17):70-75(in Chinese).
|
[17] | Song Xaiohui,Sheng Wanxing,Shi Changkai,et al.Typical Power supply modes for village electrification of the new rural [J].Automation of Electric Power Systems,2008,32(17):104-107(in Chinese).
|
[18] | 盛万兴,宋晓辉.单三相混合供电模式[M].北京:中国电力出版社,2010:85-87.
|
[19] | 宋晓辉.考虑需求侧管理的高压配电网规划[D].北京:中国电力科学研究院,2005.
|
[20] | 国家电网公司.国家电网农(2008)号 新农村电气化村典型供电模式[S].北京:国家电网公司,2008.
|
[21] | 国家电网公司.国家电网农[2007]326号 新农村电气化标准体系[S].北京:国家电网公司,2007.
|
[22] | 宋晓辉,盛万兴,史常凯,等.中国:201010234267.9,一种基于区域供电的电网规划设计方法[P].2010-07-23.
|
[23] | 程林,焦岗,田浩.可靠性与经济性相协调的配电网规划方法[J].电网技术,2010,34(11):106-110.
|
[24] | Cheng Lin,Jiao Gang,Tian Hao.A method of distribution network planning with coordination of reliability and economics[J].Power System Techonolgy,2010,34(11):106-110(in Chinese).
|
[25] | 王伟.基于环境承载力理论的电网规划信号研究[J].电网技术,2010,34(3):135-140.
|
[26] | Wang Wei.Study on environmental bearing capacity based signal of power transmission network planning in electricity market[J].Power System Techonolgy,2010,34(3):135-140(in Chinese).
|
[27] | 徐玉琴,李雪冬.考虑分布式电源的基于改进免疫克隆选择算法的配电网规划方法[J].电网技术,2010,34(8):97-101.
|
[28] | Xu Yuqin,Li Xuedong.An improved immune clonal selection algorithm based planning method for distribution network with distributed generators[J].Power System Techonolgy,2010,34(8):97-101(in Chinese).
|
[29] | 梁锦照,夏清,王德兴.快速发展城市的组团式电网规划新思路[J].电网技术,2009,33(17): 70-75.
|