[1] | 刘晨虎,夏清,郭琳,等.以价格为控制变量的交易计划和阻塞管理算法[J].电网技术,2006,30(16):77-83.
|
[2] | Liu Chenhu,Xia Qing,Guo Lin,et al.Algorithm of transaction planning and congestion management using price as control variable [J].Power System Technology,2006,30(16):77-83(in Chinese).
|
[3] | Khatib S E,Galiana F D.Negotiating bilateral contracts in electricity markets[J].IEEE Trans on Power Systems,2007,22(2):553-562.
|
[4] | Nobile E,Bose A,Tomsovic K.Feasibility of a bilateral market for load following[J].IEEE Trans on Power Systems,2001,16(4) 782-787.
|
[5] | Enrico De Tuglie,Francesco Torelli.Load following control schemes for deregulated energy markets[J].IEEE Trans on Power Systems,2006,21(4):1691-1698.
|
[6] | 杨文佳,康重庆,夏清,等.基于预测误差分布特性统计分析的概率性短期负荷预测[J].电力系统自动化,2006,30(19):47-52.
|
[7] | Yang Wenjia,Kang Chongqing,Xia Qing,et al.Short term probabilistic load forecasting based on statistics of probability distribution of forecasting errors[J].Automation of Electric Power Systems,2006,30(19):47-52(in Chinese).
|
[8] | 周明,李庚银,严正,等.考虑备用需求和风险的供电企业最优购电计划[J].电网技术,2005,29(3):33-38.
|
[9] | Zhou Ming,Li Gengyin,Yan Zheng,et al.Optimal electricity procurement schedule and load service entities incorporating with reserve and risks[J].Power System Technology,2005,29(3):33-38(in Chinese).
|
[10] | 张保会,王立永,谭伦农,等.计及风险的市场环境下电力系统安全可靠性研究[J].电网技术,2005,29(3):44-49.
|
[11] | Zhang Baohui,Wang Liyong,Tan Lunnong,et al.Research of power system security and reliability considering risk under environment of electricity market[J].Power System Technology,2005,29(3):44-49(in Chinese).
|
[12] | 刘友波,刘俊勇,赵岩,等.基于多目标聚类的用电集群特征属性计算[J].电力系统自动化,2009,33 (19):46-51.
|
[13] | Liu Youbo,Liu Junyong,Zhao Yan,et al.Calculation of characteristic attributes of consumer aggregations based of muti-objective clustering [J].Automation of Electric Power Systems,2009,33 (19):46-51(in Chinese).
|
[14] | 冯丽,邱家驹.基于电力负荷模式分类的短期电力负荷预测[J].电网技术,2009,33(4):23-26.
|
[15] | Feng Li,Qiu Jiaju.Electrical load forecasting based on load patterns[J].Power System Technology,2009,33(4):23-26(in Chinese).
|
[16] | 庄彦,康重庆,胡江溢,等.售电市场质量及其综合评价[J].电力系统自动化,2009,33(3):25-29.
|
[17] | Zhuang Yan,Kang Chongqing,Hu Jiangyi,et al.Quality of power sale market and its comprehensive assessment[J].Automation of Electric Power Systems,2009,33(3):25-29(in Chinese).
|
[18] | 张森林,张尧,陈皓勇,等.大用户参与电力市场双边交易的一种新模式[J].华东电力,2010,38(1):6-10.
|
[19] | Zhang Senlin,Zhang Yao,Chen Haoyong,et al.New model of large power custom’s participation in power market bilateral transactions [J].East China Electric Power,2010,38(1):6-10(in Chinese).
|
[20] | 李锋,何洋.大用户放开后电力营销策略[J].中国电力,2007,40(6):56-60.
|
[21] | Li Feng,He Yang.Sales strategies in the opened whole sale market [J].Electric Power,2007,40(6):56-60(in Chinese).
|
[22] | 刘乐,刘娆,李卫东.电力市场的区域调频责任偏差交易机制[J].电网技术,2009,33(20):104-107.
|
[23] | Liu Le,Liu Rao,Li Weidong.Transaction mechanism of area frequency control responsibility error for electricity market[J].Power System Technology,2009,33(20):104-107(in Chinese).
|
[24] | 董军,张婧,陈小良,等.考虑需求侧响应的短期阻塞管理模型与激励机制研究[J].电力系统保护与控制,2010,38(3):24-28.
|
[25] | Dong Jun,Zhang Jing,Chen Xiaoliang,et al.Study on short-run congestion management model and incentive mechanism considering demand response[J].Power System Protection and Control,2010,38(3):24-28(in Chinese).
|
[26] | 方德斌,王先甲.电力市场下发电公司和大用户间电力交易的双方叫价拍卖模型[J].电网技术,2005,29(6):32-36.
|
[27] | Fang Debin,Wang Xianjia.A double auction model for transaction between generation[J].Power System Technology,2005,29(6):32-36(in Chinese).
|