[1] | Zhang Peng,Wang Shouxiang.Novel interval methods in power system reliability economics[J].Proceedings of the CSEE,2004,24(2):7l-77(in Chinese).
|
[2] | 吴素农,吴文传,张伯明.考虑传输容量约束的配电网可靠性快速评估[J].电网技术,2009,33(14):21-25,41.
|
[3] | 束洪春,刘宗兵,朱文涛.基于图论的复杂配电网可靠性评估方法[J].电网技术,2006,30(21):46-49.
|
[4] | Shu Hongchun,Liu Zongbing,Zhu Wentao.A new method of reliability Evaluation for complex distribution network based on graph theory[J].Power System Technology,2006,30(21):46-49(in Chinese).
|
[5] | Billinton R.Reliability evaluation of power system[M].London(UK):Pitman Advanced Publishing Program,1984:260-266.
|
[6] | 王新花,唐巍.考虑元件可靠性参数修正的配电网可靠性研究[J].电网技术,2008,32(19):62-65.
|
[7] | Wang Xinhua,Tang Wei.Evaluation of distribution network reliability considering modification of component reliability parameters[J].Power System Technology,2008,32(19):62-65(in Chinese).
|
[8] | 宋晓通,谭震宇.大型发输电组合系统可靠性评估方法[J].高电压技术,2007,33(7):191-194.
|
[9] | Song Xiaotong,Tan Zhenyu.Methodology for reliability evaluation of bulk composite generation-transmission system[J].High Voltage Engineering,2007,33(7):191-194(in Chinese).
|
[10] | 赵渊,周家启,刘洋.发输电组合系统可靠性评估中的最优负荷削减模型分析[J].电网技术,2004,28(10):34-37.
|
[11] | Zhao Yuan,Zhou Jiaqi,Liu Yang.Analysis on optimal load shedding model in reliability evaluation of composite generation and transmission system[J].Power System Technology,2004,28(10):34-37(in Chinese).
|
[12] | Billinton R,Kumar S,Chowdhury N,et al.A reliability test system for educational purposes-basic data[J].IEEE Transactions on Power Systems,1989,4(3):1238-1244.
|
[13] | 张鹏,王守相.电力系统可靠性经济评估的区间分析方法[J].中国电机工程学报,2004,24(2):7l-77.
|
[14] | Wu Sunong,Wu Wenchuan,Zhang Boming.An efficient reliability evaluation method for distribution system with transmission capacity constraints[J].Power System Technology,2009,33(14):21-25,41(in Chinese).
|
[15] | 王遂,任震,蒋金良.混合法在高压直流输电系统可靠性评估中的应用[J].电网技术,2007,31(12):42-46.
|
[16] | Wang Sui,Ren Zhen,Jiang Jinliang.Application of hybrid reliability evaluation method for HVDC transmission systems[J].Power System Technology,2007,31(12):42-46(in Chinese).
|
[17] | 贾燕冰,严正.基于改进快速排序法的发电系统可靠性评估[J].电网技术,2010,34(6):144-148.
|
[18] | Jia Yanbing,Yan Zheng.An improving fast sorting technique for generating system reliability evaluation[J].Power System Technology,2010,34(6):144-148(in Chinese).
|
[19] | 赵克勤.集对分析及其初步应用[M].杭州:浙江科技出版社,2000:9-33.
|
[20] | 赵克勤,宜爱理.集对论:一种新的不确定性理论方法与应用[J].系统工程,1996,14(1):18-23.
|
[21] | Zhao Keqin,Yi Aili.Set pair theory:A new theory method of non define and its application[J].Systems Engineering,1996,14(1):18-23(in Chinese).
|
[22] | 赵克勤.联系数及其应用[J].吉林师范学院学报,1996,17(8):50-53.
|
[23] | Zhao Keqin.Connection number and its application[J].Journal of Jilin Teachers College,1996,17(8):50-53(in Chinese).
|
[24] | 赵克勤.集对分析(SPA)中的联系数与不确定量[J].大自然探索,1997,16(2):91.
|
[25] | Zhao Keqin.Connection number and uncertainties in the set pair analysis (SPA)[J].Exploration of Nature,1997,16(2):91(in Chinese).
|
[26] | 吴开贵,吴中福.基于灵敏度分析的电网可靠性算法[J].中国电机工程学报,2003,23(4):53-56.
|
[27] | Wu Kaigui,Wu Zhongfu.Reliability evaluation algorithm of electric power systems using sensitivity analysis[J].Proceedings of the CSEE,2003,23(4):53-56(in Chinese).
|
[28] | 张硕,李庚银,周明.基于序贯蒙特卡罗仿真的发输电系统充裕度评估算法[J].中国电力,2009,42(7):10-14.
|
[29] | Zhang Shuo,Li Gengyin,Zhou Ming.Research on adequacy evaluation algorithm of generation and transmission systems based on the sequential Monte-Carlo simulation[J].Electric Power,2009,42(7):10-14(in Chinese).
|