Thompson G L,Wall D L.A branch and bound model for choosing optimal substation locations [J].Transactions on Power Apparatus and Systems,1982,100(5):2683-2687.
[2]
杨丽徙,王家耀,贾德峰,等.GIS与模糊模式识别理论在变电站选址中的应用[J].电力系统自动化,2003,27(18):87-90.Yang Lixi,Wang Jiayao,Jia Defeng,et al.Application of GIS and fuzzy pattern recognition theory in substation locating[J].Automation of Electric Power Systems,2003,27(18):87-90(in Chinese).
[3]
王成山,刘涛,谢莹华.基于混合遗传算法的变电站选址定容[J].电力系统自动化,2006,30(6):30-34.Wang Chengshan,Liu Tao,Xie Yinghua.Substation locating and sizing on hybrid genetic and technology algorithm[J].Automation of Electric Power Systems,2006,30(6):30-34(in Chinese).
[4]
王成山,魏海洋,肖俊,等.变电站选址定容两阶段优化规划方法[J].电力系统自动化,2005,29(4):62-67.Wang Chengshan,Wei Haiyang,Xiao Jun,et al.Two-phase optimization planning approach to substation locating and sizing [J].Automation of Electric Power Systems,2005,29(4):62-67(in Chinese).
[5]
Ranjan R,Venkatesh D,Das D.A new algorithm for power distribution system planning [J].Elsevier Power Systems Research,2002,62 (25):55-65.
[6]
Hongwei D,Yixin Y.Optimal planning of distribution substation location and sizes-model and algorithm[J].Electrical Power & Energy Systems,1996,18(6):353-357.
[7]
孔涛,程浩忠.配电网规划研究综述[J].电网技术,2009,33(19):93-101.Kong Tao,Cheng Haozhong.Review of power distribution network planning[J].Power System Technology,2009,33(19):93-101(in Chinese).
[8]
柳国良,张新育.变电站模块化建设研究综述[J].电网技术,2008,32(14):37-41.Liu Guoliang,Zhang Xinyu.A survey on modularized construction of power substations[J].Power System Technology,2008,32(14):37-41(in Chinese).
[9]
罗凤章,王成山.上海市配电网规划辅助决策系统[J].电网技术,2009,33(3):80-86.Luo Fengzhang,Wang Chengshan.Decision-making support system for urban distribution network planning of Shanghai[J].Power System Technology,2009,33(3):80-86 (in Chinese).
[10]
卢志刚,陈金阳.基于负载率的配电网变电站与开闭所规划[J].电网技术,2009,33(6):63-69.Lu Zhigang,Chen Jinyang.Planning of substation and switching station for distribution network based on load rate[J].Power System Technology,2009,33(6):63-69 (in Chinese).