毛启静.利用风力发电机的无功功率补偿风电场无功损耗[J].电网技术,2009,33(19):175-180.Mao Qijing.Compensating reactive power loss of wind farm with reactive power generated by wind turbine generators[J].Power System Technology,2009,33(19):175-180 (in Chinese).
[2]
何世恩,董新洲.大规模风电机组脱网原因分析及对策[J].电力系统保护与控制,2012,40(1):131-138.He Shien,Dong Xinzhou.Cause analysis on large-scale wind turbine tripping and its countermeasures[J].Power System Protection and Control,2012,40(1):131-138(in Chinese).
[3]
叶希,鲁宗相,乔颖.大规模风电机组连锁脱网事故机理初探[J].电力系统自动化,2012,35(8):11-17.Ye Xi,Lu Zongxiang,QiaoYing.A primary analysis on mechanism of large scale cascading trip-off of wind turbine generators [J].Automation of Electric Power Systems,2012,35(8):11-17 (in Chinese).
[4]
李丹,贾琳,许晓菲.风电机组脱网原因及对策分析[J].电力系统自动化,2011,35(22):41-44.Li dan,Jia Lin,Xu Xiaofei.Cause and countermeasures analysis on wind turbines’ trip-off from grid[J].Automation of Electric Power Systems,2011,35(22):41-44(in Chinese) .
[5]
崔扬,严干贵,孟磊,等.双馈感应风电机组异常脱网及无功需求分析[J].电网技术,2011,35(1):158-163.Cui Yang,Yan Gangui,Meng Lei,et al.Analysis on abnormal disconnection of doubly fed induction generator wind turbines from power grid and its demand on reactive power[J].Power System Technology,2011,35(1):158-163 (in Chinese).
[6]
甘德强,胡江溢,韩祯祥.2003年国际若干停电事故思考[J].电力系统自动化,2004,28(3):1-4.Gan Deqiang,Hu Jiangyi,Han Zhenxiang.Thinking over several blackouts in 2003[J].Automation of Electric Power Systems,2004, 28(3):1-4(in Chinese).
[7]
印永华,郭剑波,赵建军,等.美加“8.14”大停电事故初步分析以及应吸取的教训[J].电网技术,2003,27(10):8-11.Yin Yonghua,Guo Jianbo,Zhao Jianjun,et a1.Preliminary analysis of large scale blackout in interconnected North America power system grid on August 14 and lessons to be drawn[J].Power System Technology,2003,27(10):8-11(in Chinese).
[8]
薛禹胜.综合防御由偶然故障演化为电力灾难:北美“8.14”大停电的警示[J].电力系统自动化,2003,27(18):1-5.Xue Yusheng.The way from a simple contingency to system wide disaster lessons from the eastern interconnection blackout in 2003 [J].Automation of Electric Power Systems,2003,27(18):1-5(in Chinese).
[9]
薛禹胜.时空协调的大停电防御框架:(一)从孤立防线到综合防御[J].电力系统自动化,2006,30(1):8-16.Xue Yusheng.Space-time cooperative framework for defending blackouts:Part I From isolated defense lines to coordinated defending [J].Automation of Electric Power Systems,2006,30(1):8-16(in Chinese).
[10]
何大愚,一年以后对美加“8.14”大停电事故的反思[J].电网技术,2004,28(21):1-5.He Dayu.Rethinking over“8.14”US-Canada blackout after one year[J].Power System Technology,2004,28(21):1-5(in Chinese) .
[11]
傅书遢.1EEE PES 2004会议电网安全问题综述及防止大面积停电事故建议[J].电力系统自动化,2005,29(8):1-4.Fu Shuti.Summary on power system security problems on 2004 IEEE PES meeting and recommendation for developing defense measures [J].Automation of Electric Power Systems,2005,29(8):1-4(in Chinese).
[12]
唐斯庆,张弥,李建设,等.海南电网“9.26”大面积停电事故的分析与总结[J].电力系统自动化,2006,30(1):1-7.Tang Siqing,Zhang Mi,Li Jianshe,et a1.Review of blackout in Hainan on September 26th Causes and Recommendations [J].Automation of Electric Power Systems,2006,30(1):1-7(in Chinese).
[13]
林伟芳,孙华东,汤涌,等.巴西“11.10”大停电事故分析及启示. [J].电力系统自动化,2010,34(7):1-5.Lin Weifang,Sun Huadong,Tang Yong,et al. Analysis and lessons of the blackout in Brazil power grid on Nov.10, 2009[J]. Automation of Electric Power Systems,2010,34(7):1-5(in Chinese).
[14]
林伟芳,汤涌,孙华东,等.巴西“2.4”大停电事故分析及对我国电网安全运行的启示[J].电力系统自动化,2011,35(9):1-5.Lin Weifang, Tang Yong, Sun Huadong, et al. Blackout in Brazil power grid on February 4,2011 and inspirations for stable operation of power grid[J].Automation of Electric Power Systems,2011,35(9):1-5(in Chinese).
[15]
吴义纯,丁明.风电引起的电压波动与闪变的仿真研究[J].电网技术,2009,33(20):125-130.Wu Yichun,Ding Ming.Simulation study on voltage fluctuations and flicker caused by wind farms[J].Power System Technology,2009,33(20):125-130(in Chinese).