施冲,余杏林,吴正义,等.水电厂自动发电控制的工程设计与分析[J].电力系统自动化,2001,25(4):57-59. Shi Chong,Yu Xinglin,Wu Zhengyi,et al.Engineering design and analysis of the automatic generation control for hydropower stations[J].Automation of Electric Power Systems,2001,25(4):57-59(in Chinese).
[4]
单鹏珠,石冰,刘永华.天生桥一级水电厂AGC振动区处理策略[J].水电自动化与大坝监测,2010,34(3):5-7. Shan Pengzhu,Shi Bing,Liu Yonghua.Vibration zone treatment strategy for the AGC in Tianshengqiao hydropower plant [J].Hydropower Automation and Dam Monitoring,2010,34(3):5-7(in Chinese).
[5]
冯顺田.混流式水轮机振动分析与优化运行[J].水电自动化与大坝监测,2005,29(1):26-28. Feng Shuntian.Vibration analysis and optimal operation of francis hydro turbine[J].Hydropower Automation and Dam Monitoring,2005,29(1):26-28(in Chinese).
[6]
黄蕾.区域电力市场下AGC控制模式研究[J].电网技术,2006,30(S2):84-88. Huang Lei.Research of AGC control mode in regional electric market [J].Power System Technology,2006,30(S2):84-88(in Chinese).
[7]
李予州,吴文传,张伯明,等.多时间尺度协调的区域控制偏差超前控制方法[J].电网技术,2009,33(3):15-19,24. Li Yuzhou,Wu Wenchuan,Zhang Boming,et al.A multi-timescale coordination method for area control error advanced control[J].Power System Technology,2009,33(3):15-19,24(in Chinese).
[8]
尚学伟,李立新,卓峻峰,等.特高压交流示范工程投运后华北电网AGC 策略的改进[J].电网技术,2010,34(9):31-34. Shang Xuewei,Li Lixin,Zhuo Junfeng,et al.Improvement of strategies of AGC in North China Power Grid after UHV AC pilot project operation[J].Power System Technology,2010,34(9):31-34 (in Chinese).
[9]
赵泰峰,孙继杰.调度主站AGC软件负荷分配的研究[J].电网技术,2005,29(18):46-52. Zhao Taifeng,Sun Jijie.Research on electric grid dispatching center AGC software load allocation [J].Power System Technology,2005,29(18):46-52(in Chinese).
[10]
谢旭,刘国旗,杨小煜.基于CC-2000系统的华北电网AGC机组调节效能在线测定软件的开发[J].电网技术,2005,29(18):22-25. Xie Xu,Liu Guoqi,Yang Xiaoyu.Development of online measurement software for adjustment efficiency of AGC units in North China power grid based on CC-2000 platform[J].Power System Technology,2005,29(18):22-25(in Chinese).
[11]
韩少晓,孙嘉,延峰.AGC机组辅助服务定量评估[J].电网技术,2005,29(18):26-29. Han Shaoxiao,Sun Jia,Yan Feng.AGC generator auxiliary service quantitative evaluation[J].Power System Technology,2005,29(18):26-29(in Chinese).
[12]
周永灿,李扬,王蓓蓓.电力市场环境下2种调度方法对AGC机组调配的影响[J].电网技术,2010,34(7):154-159. Zhou Yongcan,Li Yang,Wang Beibei.Impact of two dispatching methods on AGC unit dispatch in electricity market environment [J].Power System Technology,2010,34(7):154-159(in Chinese).
[13]
刘进生,王绪柱,张宝玉.区间数排序[J].工程数学学报,2001,18(4):103-109. Liu Jinsheng,Wang Xuzhu,Zhang Baoyu.The ranking of interval numbers[J].Journal of Engineering Mathematics,2001,18(4):103-109(in Chinese).
[14]
袁飞,滕贤亮,张小白,等.调度主站AGC中水电机组振动区的动态建模与跨越方法[J].电力系统自动化,2011,35(1):87-90,99. Yuan Fei,Teng Xianliang,Zhang Xiaobai,et al.Dynamic modeling and striding methods of vibration zone for hydro electric units in electric dispatch main station AGC[J].Automation of Electric Power Systems,2011,35(1):87-90,99(in Chinese).