赵珊珊,张东霞,印永华,等.风电的电价政策及风险管理策略[J].电网技术,2011,35(5):142-145. Zhao Shanshan,Zhang Dongxia,Yin Yonghua,et al.Pricing policy and risk management strategy for wind power considering wind integration[J].Power System Technology,2011,35(5):142-145(in Chinese).
[4]
周明,冉瑞江,李庚银.风电并网系统可用输电能力的评估[J].中国电机工程学报,2010,30(22):14-21. Zhou Ming,Ran Ruijiang,Li Gengyin.Assessment on available transfer capability of wind farm incorporated system[J].Proceedings of the CSEE,2010,30(22):14-21(in Chinese).
[5]
张宏宇,印永华.大规模风电接入后的系统调峰充裕性评估[J].中国电机工程学报,2011,31(22):26-31. Zhang Hongyu,Yin Yonghua.Peak-load regulating adequacy evaluation associated with large-scale wind power integration[J].Proceedings of the CSEE,2011,31(22):26-31(in Chinese).
[6]
王小海,齐军,侯佑华.内蒙古电网大规模风电并网运行分析和发展思路[J].电力系统自动化,2011,35(22):90-97. Wang Xiaohai,Qi Jun,Hou Youhua.Operation research for large scale wind power grid integration and further developments in Inner Mongolia[J].Automation of Electric Power Systems,2011,35(22):90-97(in Chinese).
[7]
徐玮,杨玉林,李政光,等.甘肃酒泉大规模风电参与电力市场模式及其消纳方案[J].电网技术,2010,34(6):71-77. Xu Wei,Yang Yulin,Li Zhengguang,et al.Participation mode of large-scale Jiuquan wind power farm in Gansu province to electricity market and its utilization scheme[J].Power System Technology,2010,34(6):71-77(in Chinese).
张丽英,叶廷路,辛耀中,等.大规模风电接入电网的相关问题及措施[J].中国电机工程学报,2010,35(25):1-9. Zhang Liying,Ye Tinglu,Xin Yaozhong,et al.Problems and measures of power grid accommodating large scale wind power[J].Proceedings of the CSEE,2010,35(25):1-9(in Chinese).
[11]
孙荣富,张涛,梁吉.电网接纳风电能力评估及应用[J].电力系统自动化,2011,35(4):70-76. Sun Rongfu,Zhang Tao,Liang Ji.Evaluation and application of wind power integration capacity in power grid[J].Automation of Electric Power Systems,2011,35(4):70-76(in Chinese).
[12]
陈炳森,胡华丽.我国风电发展概况及展望[J].电网技术,2008,32(增刊2):272-275. Chen Bingsen,Hu Huali.General situation and prospect of wind power in China[J].Power System Technology,2008,32(增刊2):272-275(in Chinese).
[13]
刘岱,庞松岭.风电集中接入对电网影响分析[J].电力系统自动化学报,2011,23(3):157-161. Liu Dai,PangSongling.System impacts analysis for interconnection of wind farm and power grid[J].Proceedings of the CSU-EPSA,2011,23(3):157-161(in Chinese).
[14]
朱凌志,陈宁,韩华玲.风电消纳关键问题及应对措施分析[J].电力系统自动化,2011,35(22):29-34. Zhu Lingzhi,Chen Ning,Han Hualing.Key problems and solutions of wind power accommodation[J].Automation of Electric Power Systems,2011,35(22):29-34(in Chinese).
[15]
张伯明,吴文传,郑太一,等.消纳大规模风电的多时间尺度协调的有功调度系统设计[J].电力系统自动化,2011,35(1):1-6. Zhang Boming,Wu Wenchuan,Zheng Taiyi,et al.Design of a multi-time scale coordinated active power dispatching system for accommodating large scale wind power penetration[J].Automation of Electric Power Systems,2011,35(1):1-6(in Chinese).
[16]
郑太一,冯利民,王绍然.一种计及电网安全约束的风电优化调度方法[J].电力系统自动化,2010,34(15):71-75. Zheng Taiyi,Feng Limin,Wang Shaoran.An optimized wind power dispatching method considering security constraints in the power grid[J].Automation of Electric Power Systems,2010,34(15):71-75(in Chinese).
[17]
田廓,曾鸣,鄢帆,等.考虑环保成本和风电接入影响的动态经 济调度模型[J].电网技术,2011,35(6):55-59. Tian Kuo,Zeng Ming,Yan Fan,et al.A dynamic economic scheduling model considering environmental protection cost and impact of connecting wind power to power grid[J].Power System Technology,2011,35(6):55-59(in Chinese).
[18]
曾鸣,吕春泉,邱柳青.风电并网时基于需求侧响应的输电规划模型[J].电网技术,2011,35(4):129-134. Zeng Ming,Lü Chunquan,Qiu Liuqing.A demand-side response-based transmission planning model with grid-connected wind farms[J].Power System Technology,2011,35(4):129-134(in Chinese).