汤涌,李晨光,朱方,等.川电东送工程系统调试[J].电网技术,2003,27(12):14-21. Tang Yong,Li Chenguang,Zhu Fang,et al.Commissioning tests for transmission project of power transport from Sichuan to eastern area of China[J].Power System Technology,2003,27(12):14-21(in Chinese).
[2]
祝瑞金,杨凌辉,傅业盛,等.福建—华东联网工程系统调试[J].华东电力,2002,30(7):1-5. Zhu Ruijin,Yang Linghui,Fu Yesheng,et al.Commissioning tests for connection project of Fujian and Huadong power grid[J].East China Electric Power,2002,30(7):1-5(in Chinese).
[3]
杨万开,印永华,曾南超,等.三峡输变电工程调试成果总结[J].电网技术,2008,32(15):6-10. Yang Wankai,Yin Yonghua,Zeng Nanchao,et al.Achievements summary of transmission and transformation project commissioning test for Three Gorges power station[J].Power System Technology,2008,32(15):6-10(in Chinese).
汤涌,侯俊贤,刘文焯.电力系统数字仿真负荷模型中配电网络及无功补偿与感应电动机的模拟[J]. 中国电机工程学报,2005,25(3):8-12. Tang Yong,Hou Junxian,Liu Wenzhuo.The modeling of distribution network and var compensator and induction motor in the load model for power system digital simulation[J].Proceedings of the CSEE,2005,25(3):8-12(in Chinese).
[6]
袁季修.试论防止电力系统大面积停电的紧急控制:电力系统安全稳定运行的第三道防线[J].电网技术,1999,23(4):1-4. Yuan Jixiu.Emergency control for preventing widespread blackout of power system:the third line of defence[J].Power System Technology,1999,23(4):1-4(in Chinese).
[7]
熊小伏,周永忠,周家启.计及负荷频率特性的低频减载方案研究[J].中国电机工程学报,2005,25(19):48-51. Xiong Xiaofu,Zhou Yongzhong,Zhou Jiaqi.Study of underfrequency load shedding scheme based on load frequency characteristics[J].Proceedings of the CSEE,2005,25(19):48-51(in Chinese).
[8]
赵强,王丽敏,刘肇旭.全国电网互联系统频率特性及低频减载方案[J].电网技术,2009,33(8):35-40. Zhao Qiang,Wang Limin,Liu Zhaoxu.Study on dynamic frequency characteristics and coordinative under-frequency load shedding scheme for nationwide interconnected power grid of China[J].Power System Technology,2009,33(8):35-40(in Chinese).
郑彬,班连庚,张媛媛,等.特高压交流试验示范工程过电压计算与测试结果的对比分析[J].电网技术,2009,33(16):24-28. Zheng Bin,Ban Liangeng,Zhang Yuanyuan,et al.Contrastive analysis on simulated and measured overvoltages of 1 000 kV AC pilot project in China[J].Power System Technology,2009,33(16):24-28 (in Chinese).
[15]
印永华,房喜,朱跃.750 kV输变电示范工程系统调试概况[J].电网技术,2005,29(20):1-9. Yin Yonghua,Fang Xi,Zhu Yue.General situation of system commissioning for 750 kV transmission pilot project[J].Power System Technology,2005,29(20):1-9(in Chinese).
[16]
张健,张文朝,肖扬,等.特高压交流试验示范工程调试仿真研究及验证分析[J].电网技术,2009,33(16):29-32. Zhang Jian,Zhang Wenchao,Xiao Yang,et al.Simulation and verification of system commissioning test for 1 000 kV AC pilot project[J].Power System Technology,2009,33(16):29-32(in Chinese).
[17]
徐式蕴,刘津,赵兵,等.藏中电网SVC配置方案及补偿策略分析[J].电网技术,2013,37(8):2136-2142. Xu Shiyun,Liu Jin,Zhao Bing,et al.Configuration scheme of static var compensator for Central Tibet Power Grid and analysis on compensation strategy[J].Power System Technology,2013,37(8):2136-2142(in Chinese).
[18]
左玉玺,王雅婷,邢琳,等.西北750 kV电网大容量新型FACTS设备应用研究[J].电网技术,2013,37(8):2349-2354. Zuo Yuxi,Wang Yating,Xing Lin,et al.Applied research on new types of high capacity FACTS devices in northwest 750 kV power grid[J].Power System Technology,2013,37(8):2349-2354(in Chinese).
[19]
邹强,李兴源.基于最优变目标策略的励磁系统与SVC协调控制[J].电网技术,2006,30(10):24-28. Zou Qiang,Li Xingyuan.Coordination control between generator excitation and SVC based on optimal variable aim strategy[J].Power System Technology,2006,30(10):24-28 (in Chinese).
[20]
刘隽,李兴源,姚大伟,等.静止同步串联补偿器与静止无功补偿器的相互作用分析与协调控制[J].电网技术,2008,32(1):20-25. Liu Jun,Li Xingyuan,Yao Dawei,et al.Analysis on interaction between static synchronous series compensator and static var compensator and their coordination control[J].Power System Technology,2008,32(1):20-25(in Chinese).