电网技术  2014 

电力系统恢复初期考虑动态特性的负荷恢复优化

DOI: 10.13335/j.1000-3673.pst.2014.09.020, PP. 2441-2448

Keywords: 电力系统恢复初期,负荷恢复,动态特性,暂态能量函数,负荷冲击能量

Full-Text   Cite this paper   Add to My Lib

Abstract:

电力系统恢复初期,对如何在薄弱小电网下最大限度地恢复负荷进行了研究。考虑到投入负荷后的系统过渡过程中各种状态量的巨大变化,从非自治系统暂态能量函数的角度分析其动态变化过程,能更好地揭示系统恢复初期的物理本质。引入负荷冲击能量和动态频率来指导制定最大限度的负荷恢复方案,由此提出考虑动态特性的负荷恢复方案制定方法。通过该方法能够制定出满足系统动态特性要求的最大限度负荷恢复方案,同时可以发现用负荷冲击能量能更准确地反映负荷投入对系统的影响,为负荷恢复策略制定及评估提供有益的指导。

References

[1]  林济铿,么莉,孟宪萌,等.天津电网黑启动试验研究[J].电网技术,2008,32(5):55-58.
[2]  Lin Jikeng,Yao Li,Meng Xianpeng,et al.Test research of black start of Tianjin power grid[J].Power System Technology,2008,32(5):55-58(in Chinese).
[3]  阮前途,王伟,黄玉,等.基于燃机机组的上海电网黑启动系列试验[J].电网技术,2006,30(2):19-22.
[4]  Ruan Qiantu,Wang Wei,Huang Yu,et al.A series of blackstart tests based on gas turbine generators in Shanghai power grid[J].Power System Technology,2006,30(2):19-22(in Chinese).
[5]  梁海平,顾雪平.基于谱聚类的黑启动子系统划分[J].电网技术,2013,37(2):372-377.
[6]  Liang Haiping,Gu Xueping.Black-start network partitioning based on spectral clustering[J].Power System Technology,2013,37(2):372-377(in Chinese).
[7]  朱冬雪,顾雪平,钟慧荣.电力系统大停电后机组恢复的多目标优化方法[J].电网技术,2013,37(3):814-820.
[8]  Zhu Dongxue,Gu Xueping,Zhong Huirong.A multi-objective optimization method for post-blackout unit restoration[J].Power System Technology,2013,37(3):814-820(in Chinese).
[9]  张志毅,陈允平,刘敏忠,等.用改进遗传算法求解电力系统负荷恢复[J].华中科技大学学报:自然科学版,2007,35(7):102-104.
[10]  Zhang Zhiyi,Chen Yunping,Liu Minzhong,et al.Modified genetic algorithm for load restoration in power systems[J].Huazhong Univ of Sci & Tech:Nature Science Edition,2007,35(7):102-104(in Chinese).
[11]  杨可,刘俊勇,贺星棋,等.黑启动中考虑动态过程的负荷最优恢复[J].电力自动化设备,2009,29(10):88-92.
[12]  Yang Ke,Liu Junyong,He Xingqi,et al.Optimal load restoration considering dynamic constraints during black-start[J].Electric Power Automation Equipment,2009,29(10):88-92(in Chinese).
[13]  程改红,徐政.基于粒子群优化的最优负荷恢复算法[J].电力系统自动化,2007,31(16):62-66.
[14]  Cheng Gaihong,Xu Zheng.Optimal load restoration based on particle swarm optimization[J].Automation of Electric Power Systems,2007,31(16):62-66(in Chinese).
[15]  刘映尚,吴文传,冯永青,等.黑启动过程中的负荷恢复[J].电网技术,2007,31(13):17-22.
[16]  Liu Yingshang,Wu Wenchuan,Feng Yongqing,et al.Load recovery during power system blackstart[J].Power System Technology,2007,31(13):17-22(in Chinese).
[17]  周云海,闵勇.负荷的快速恢复算法研究[J].中国电机工程学报,2003,23(3):74-79.
[18]  Zhou Yunhai,Min Yong.Optimal algorithm for fast load recovery[J].Proceedings of the CSEE,2003,23(3):74-79(in Chinese).
[19]  瞿寒冰,刘玉田.计及暂态电压约束的负荷恢复能力快速计算[J].电力系统自动化,2009,33(15):8-12.
[20]  Qu Hanbing,Liu Yutian.Fast calculation of load restoration capability considering transient voltage constraint [J].Automation of Electric Power Systems,2009,33(15):8-12(in Chinese).
[21]  陈小平,顾雪平.基于遗传模拟退火算法的负荷恢复计划制定[J].电工技术学报,2009,24(1):171-176.
[22]  Chen Xiaoping,Gu Xueping.Determination of the load restoration plans based on genetic simulated annealing algorithms[J].Transactions of China Electro Technical Society,2009,24(1):171-176(in Chinese).
[23]  Ketabi A,Ranjbar A M,Feuilletr.A new method of dynamically calculation of load steps during power system restoration
[24]  [C]//Proceedings of Canadian Conference on Electrical and Computer Engineering.Halifax,Canada:IEEE 2000:158-162.
[25]  Yari V,Nourizadeh S,Ranjbar A M.Determining the Best Sequence of Load Pickup During Power System Restoration[C]//Proceedings of 9 th International Conference on Environment and Electrical Engineering.Prague,Czech Republic:IEEE,2010:1-4.
[26]  Shahram J,Abolfazl S.Accurate model of hydroelectric power plant for load pickup during power system restoration[C]//IEEE Region 10 Conference.Chiang Mai,Thailang:2004:307-310.
[27]  El-werfelli M,Dunn R,Iravani P.Backbone-network Reconfiguration for Power System Restoration using Genetic Algorithm and Expert System[C]//Proceedings of SUPERGEN Conference on Sustainable Power Generation and Supply.Nanjing,China:2009:1-6.
[28]  方涛,刘俊勇,李宏亮,等.电力系统负荷恢复控制协调优化策略[J].电力系统保护与控制,2010,38(16):18-23.
[29]  Fang Tao,Liu Junyong,Li Hongliang,et al.Harmonious optimal strategies of power system load restoration control[J].Power System Protection and Control,2010,38(16):18-23(in Chinese).
[30]  钟慧荣,顾雪平,朱玲欣.黑启动恢复中网架重构阶段的负荷恢复优化[J].电力系统保护与控制,2011,39(17):26-32.
[31]  Zhong Huirong,Gu Xueping,Zhu Lingxin.Optimization of load restoration during network reconfiguring process of black-start restoration[J].Power System Protection and Control,2011,39(17):26-32(in Chinese).
[32]  石立宝,赤东阳,姚良忠,等.基于电网分区的负荷恢复智能优化策略[J].电力系统保护与控制,2011,39(2):1-8.
[33]  Shi Libao,Chi Dongyang,Yao Liangzhong,et al.Intelligent optimization strategy for load restoration considering power grid partitioning[J].Power System Protection and Control,2011,39(2):1-8(in Chinese).
[34]  赵达维,刘天琪,李兴源.电力系统恢复控制在线决策方法[J].电网技术,2013,37(10):2762-2770.
[35]  Zhao Dawei,Liu Tianqi,Li Xingyuan.An on-line decision-making method applicable to power system restoration control[J].Power System Technology,2013,37(10):2762-2770(in Chinese).
[36]  瞿寒冰,刘玉田.机组启动过程中的负荷恢复优化[J].电力系统自动化,2011,35(8):16-21.
[37]  Qu Hanbing,Liu Yutian.Load restoration optimization during unit start-up stage[J].Automation of Electric Power Systems,2011,35(8):16-21(in Chinese).
[38]  穆钢,黎平,蔡国伟.描述发电机暂态不稳定性的一种新指标[J].电力系统自动化,1995,19(9):16-21.
[39]  Mu Gang,Li Ping,Cai Guowei.A new index for indicating transient unstable degree of generators in power systems[J].Automation of Electric Power Systems,1995,19(9):16-21(in Chinese).
[40]  刘笙,汪静.电力系统暂态稳定的能量函数分析[M].上海:上海交通大学出版社,1996.