杨万开,印永华,曾南超,等.三峡—上海直流输电工程系统调试总结[J].电网技术,2007,31(19):9-12. Yang Wankai,Yin Yonghua,Zeng Nanchao,et al.Summary of commissioning test for HVDC power transmission project from Three Gorges hydropower plant to Shanghai[J].Power System Technology,2007,31(19):9-12(in Chinese).
[2]
杨万开,曾南超,王明新,等.三峡至广东直流输电工程系统调试关键技术[J].中国电力,2008,41(1):40-43. Yang Wankai,Zeng Nanchao,Wang Mingxin,et al.The key technologies of HVDC project system commissioning test for Three Gorges hydropower plant to Guangdong[J].Electric Power,2008,41(1):40-43(in Chinese).
[3]
孙波声,凌卫家.葛南直流系统大负荷试验中华中电网方式安排[J].华中电力,1999,32(2):23-28. Sun Bosheng,Ling Weijia,Scheme arrangement of CCPG network operated in heavy load testing of ±500 kV DC transmission line to Nanqiao[J].Central China Electric Power,1999,32(2):23-28(in Chinese).
[4]
黄要桂,崔云生,吕东晓.葛南直流输电系统额定容量输电考核试验华中电网的安全分析[J].电网技术,1999,23(8):21-23. Huang Yaogui,Cui Yunsheng,Lü Dongxiao.Security analysis of central China power grid in rated power operation tests of Genan HVDC transmission system[J].Power System Technology,1999,23(8):21-23(in Chinese).
[5]
呙虎,谢国平,朱艺颖,等.青藏直流接入西藏电网数模混合仿真[J].电网技术,2013,37(2):455-459. Guo Hu,Xie Guoping,Zhu Yiying,et al.Digital/analog hybrid simulation of Tibet grid integrated with ±400 kV DC transmission line from Qinghai to Tibet[J].Power System Technology,2013,37(2):455-459(in Chinese).
[6]
唐晓骏,刘东冉,陈麒宇,等.青藏直流接入后西藏地区电网电压/无功控制[J].电网技术,2010,34(9):94-99. Tang Xiaojun,Liu Dongran,Chen Qiyu,et al.Voltage and reactive power control of the Tibet regional power grid after Qinghai-Tibet DC connection[J].Power System Technology,2010,34(9):94-99(in Chinese).
[7]
徐式蕴,刘津,赵兵,等.藏中电网SVC配置方案及补偿策略 分析[J].电网技术,2013,37(8):2136-2142. Xu Shiyun,Liu Jin,Zhao Bing,et al.Configuration scheme of static var compensator for central Tibet power grid and analysis on compensation strategy[J].Power System Technology,2013,37(8):2136-2142(in Chinese)
[8]
杨万开,印永华,曾南超,等.向家坝—上海±800 kV特高压直流输电工程系统调试技术分析[J].电网技术,2011,35(7):19-23. Yang Wankai,Yin Yonghua,Zeng Nanchao,et al.Analysis on commissioning test of ±800 kV UHVDC transmission project from Xiangjiaba to Shanghai[J].Power System Technology,2011,35(7):19-23(in Chinese).
[9]
杨万开,印永华,曾南超.青藏直流输电工程系统试验研究[J].电网技术,2014,38(2):316-320. Yang Wankai,Yin Yonghua,Zeng Nanchao.Research of system test for HVDC transmission project from Qinghai to Tibet[J].Power System Technology,2014,38(2):316-320(in Chinese).
[10]
张鑫,彭卉.大功率穿越条件下重庆电网合理受电比例[J].中国电力,2011,44(11):9-13. Zhang Xin,Peng Hui.Rational power receiving proportion of Chongqing grid on high power through condition[J].Electric Power,2011,44(11):9-13(in Chinese).
[11]
郭小江,郑超,尚慧玉,等.西藏中部同步电网安全稳定性研究[J].电网技术,2010,34(6):87-92. Guo Xiaojiang,Zheng Chao,Shang Huiyu,et al.Research on security and stability of central Tibet synchronous power grid[J].Power System Technology,2010,34(6):87-92(in Chinese).
[12]
马玉龙,徐玲玲,石岩,等.三广直流工程融冰运行方式仿真试验[J].电网技术,2008,32(19):22-25. Ma Yulong,Xu Lingling,Shi Yan,et al.Simulation test of ice-melting operation mode for HVDC power transmission project from the Three Gorges hydropower station to Guangdong[J].Power System Technology,2008,32(19):22-25(in Chinese).
[13]
庞广恒,曾南超,杨万开.特高压直流系统融冰运行方式试验与工程调试[J].电网技术,2014,38(1):3625-3629. Pang Guangheng,Zeng Nanchao,Yang Wankai.Test of de-icing operating mode for UHVDC power transmission system and its practice in engineering commissioning[J].Power System Technology,2014,38(1):3625-3629(in Chinese).
[14]
任祖怡,左洪波,吴小辰,等.用于安全稳定控制的高压直流极闭锁判据[J].电力系统自动化,2007,31(10):41-44. Ren Zuyi,Zuo Hongbo,Wu Xiaochen,et al.HVDC pole blocking detection for security and stability control [J].Automation of Electric Power Systems,2007,31(10):41-44(in Chinese).
[15]
高守义,房光华,夏尚学,等.±660 kV银东直流输电山东侧安全稳定控制策略[J].电力系统自动化,2012,36(4):101-104. Gao Shouyi,Fang Guanghua,Xia Shangxue,et al.Control strategy of security and stability control system on Shandong side of Yin-Dong HVDC transmission project[J].Automation of Electric Power Systems,2012,36(4):101-104(in Chinese).