康重庆,陈启鑫,夏清.低碳电力技术的研究展望[J].电网技术,2009,33(2):1-7. Kang Chongqing,Chen Qixin,Xia Qing.Prospects of low-carbon electricity[J].Power System Technology,2009,33(2):1-7(in Chinese).
[2]
刘贞,施於人,阎建明.低碳电力市场运行模式仿真研究[J].电网技术,2013,36(3):604-609. Liu Zhen,Shi Yuren,Yan Jianming.Simulation study on operation mode of low-carbon electricity market[J].Power System Technology,2013,36(3):604-609(in Chinese).
[3]
王建学,王锡凡,张显.电力市场中弹性运行备用研究[J].中国电机工程学报,2005,25(18):20-27. Wang Jianxue,Wang Xifan,Zhang Xian.The flexible operating reserve model in the power market[J].Proceedings of the CSEE,2005,25(18):20-27(in Chinese).
USA PJM.Electricity market synchronized reserve[EB/OL].[2014-05-04].http://www.Pjm.com/markets-and-operations/ancillary-services/synchronized-service.aspx.
[6]
葛炬,张粒子.可中断负荷参与的备用市场的帕累托优化模型[J].电力系统自动化,2006,30(9):34-37. Ge Ju,Zhang Lizi.Pareto optimally model of reserve market including interruptible load as participants[J].Automation of Electric Power Systems,2006,30(9):34-37(in Chinese).
[7]
康重庆,陈启鑫,夏清.应用于电力系统的碳捕集技术及其带来的变革[J].电力系统自动化,2010,34(1):1-7. Kang Chongqing,Chen Qixin,Xia Qing.Innovation incurred by carbon capture technologies utilized in power systems[J].Automation of Electric Power Systems,2010,34(1):1-7(in Chinese).
[8]
寻斌斌,文福拴,黎小林,等.计及排污权交易和多种不确定性的发电投资决策[J].电力系统自动化,2014,38(1):51-56. Xun Binbin,Wen Fushuan,Li Xiaolin,et al.Generation investment decision-making in emission trading environment with multiple uncertainties [J].Automation of Electric Power Systems,2014,38(1):51-56(in Chinese).
[9]
何永秀,黄文杰,谭忠富,等.电力备用市场化运营需求研究[J].中国电机工程学报,2004,24(3):46-50. He Yongxiu,Huang Wenjie,Tan Zhongfu,et al.A study on demand of electricity reserve market in marketing operation[J].Proceedings of the CSEE,2004,24(3):46-50(in Chinese).
[10]
王雁凌,许传龙,岳巍澎,等.时变可靠性约束下含风电系统旋转备用的随机规划模型[J].电网技术,2013,37(5):1311-1316. Wang Yanling,Xu Chuanlong,Yue Weipeng,et al.A stochastic programming model for spinning reserve of power grid containing wind farms under constraint of time-varying reliability[J].Power System Technology,2013,37(5):1311-1316(in Chinese).
[11]
张谦,史乐峰,任玉珑,等.计及V2G备用服务的交易式[J].中国电机工程学报,2012,32(31):59 -67. Zhang Qian,Shi Lefeng,Ren Yulong,et al.The reserve trading model considering vehicle-to-grid reserve[J].Proceedings of the CSEE,2012,32(31):59-67(in Chinese).
[12]
刘晓,艾欣,杨俊.考虑未来碳排放交易的需求侧备用竞价与调度模式设计[J].电力系统自动化,2011,35(2):38-42. Liu Xiao,Ai Xin,Yang Jun.Design of demand side reserve bid-scheduling strategy considering future carbon emission trading[J].
[13]
Automation of Electric Power Systems,2011,35(2):38-42.
[14]
蔡秋娜,文福拴,丁剑鹰,等.计及经济性、可靠性和排放因素的备用市场竞价模型[J].电力系统自动化,2012,36(8):38-44. Cai Qiuna,Wen Fushuan,Ding Jianying,et al.A reserve market bidding model considering economics,reliability and emissions[J].Automation of Electric Power Systems,2012,36(8):38-44(in Chinese).
[15]
陈启鑫,康重庆,夏清,等.低碳电力调度方式及其决策模型[J].电力系统自动化,2010,34(12):18-22. Chen Qixin,Kang Chongqing,Xia Qing,et al.Mechanism and modeling approach to low-carbon power dispatch[J].Automation of Electric Power Systems,2010,34(12):18-22(in Chinese).
[16]
Chen Q X,Kang C Q,Xia Q,et al.Optimal flexible operation of a CO2 capture power plant in a combined energy and carbon emission market[J].IEEE Transactions on Power Systems,2012,27(3):1062-1069.
[17]
朱泽磊,周京阳,韩忠旭,等.基于多阶段不同政策机制的低碳电力调度模型[J].电网技术,2013,37(2):287-294. Zhu Zelei,Zhou Jingyang,Han Zhongxu,et al.A low-carbon power dispatch model based on policy mechanisms corresponding to different stages[J].Power System Technology,2013,37(2):287-294 (in Chinese).
[18]
陈启鑫,季震,康重庆,等.碳捕集电厂不同运行方式的电碳特性分析[J].电力系统自动化,2012,36(18):109-115. Chen Qixin,Ji Zhen,Kang Chongqing,et al.Analysis on relation between power generation and carbon enission of carbon capture power plant in different operation modes[J].Automation of Electric Power Systems,2012,36(18):109-115(in Chinese).
[19]
周任军,刘阳升,成天乐,等.考虑碳排放权价格敏感区间的碳捕集水平优化建模[J].电力系统自动化,2013,37(11):46-50. Zhou Renjun,Liu Yangsheng,Cheng Tianle,et al.Carbon capture level optimization modeling considering sensitive internals of carbon emission allowance[J].Automation of Electric Power Systems,2013,37(11):46-50(in Chinese).
[20]
康重庆,季震,陈启鑫.碳捕集电厂灵活运行方法评述与展望[J].电力系统自动化,2012,36(6):1-10. Kang Chongqing,Ji Zhen,Chen Qixin.Review and prospects of flexible operation of carbon capture power plants[J].Automation of Electric Power Systems,2012,36(6):1-10(in Chinese).
[21]
陈启鑫,康重庆,夏清.碳捕集电厂的运行机制研究与调峰效益分析[J].中国电机工程学报,2010,30(7):22-28. Chen Qixin,Kang Chongqing,Xia Qing.Operation mechanism and peak-load shaving effects of carbon-capture power plant[J].Proceedings of the CSEE,2010,30(7):22-28(in Chinese).
[22]
David Soler,Pablo Frías,Tomás Gómez.Calculation of the elastic demand curve for a day-ahead secondary reserve market[J].IEEE Transactions on Power System,2010,25(2):615-623.
[23]
曼昆.经济学原理:微观经济学分册[M].梁小民,译.北京:北京大学出社,2006:212-223.
[24]
罗运虎,邢丽冬,王勤,等.可靠性需求市场中用户的风险决策[J].中国电机工程学报,2008,28(22):113-117. Luo Yunhu,Xing Lidong,Wang Qin,et al.Risk decision-marking for customer in reliability demand market[J].Proceedings of the CSEE,2008,28(22):113-117(in Chinese).