陈之栩,李丹,梁吉,等.华北电网日内发电计划及实时调度系统[J].电力系统自动化,2011,35(19):54-57. Chen Zhixu,Li Dan,Liang Ji,et al.Intraday generation plan and real-time dispatch system of north China grid[J].Automation of Electric Power Systems,2011,35(19):54-57(in Chinese).
[2]
王楠,张粒子,刘宝成,等.日前节能发电调度计划与实时控制的协调方式[J].电力系统自动化,2012,36(17):45-49. Wang Nan,Zhang Lizi,Liu Baocheng,et al.Coordination mode of day-ahead generation schedule considering energy saving and real-time control[J].Automation of Electric Power Systems,2012,36(17):45-49(in Chinese).
[3]
李丹,梁吉,孙荣富,等.并网电厂管理考核系统中AGC调节性能补偿措施[J].电力系统自动化,2010,34(4):107-111. Li Dan,Liang Ji,Sun Rongfu,et al.Compensation strategies of AGC regulation performance in plants management and assessment system
[4]
[J].Automation of Electric Power Systems,2010,34(4):107-111(in Chinese).
[5]
张程飞,袁越,张新松,等.考虑碳排放配额影响的含风电系统日前调度计划模型[J].电网技术,2014,38(8):2114-2120. Zhang Chengfei,Yuan Yue,Zhang Xinsong,et al.Day-ahead dispatching scheduling for power grid integrated with wind farm considering influence of carbon emission quota[J].Power System Technology,2014,38(8):2114-2120(in Chinese).
[6]
贺建波,胡志坚,仉梦林,等.考虑系统实时响应风险水平约束的风-火-水电力系统协调优化调度[J].电网技术,2014,38(7):1898-1906. He Jianbo,Hu Zhijian,Zhang Menglin,et al.Coordinated optimal dispatching of wind-thermal-hydro power system considering constraint of real-time expected demand not supplied[J].Power System Technology,2014,38(7):1898-1906(in Chinese).
[7]
陈铭,刘娆,吕泉,等.AGC机组分群控制策略[J].电网技术,2013,37(3):868-873. Chen Ming,Liu Rao,Lü Quan,et al.A grouping control strategy for AGC units[J].Power System Technology,2013,37(3):868-873(in Chinese).
[8]
向德军,陈根军,顾全,等.基于实测煤耗的AGC电厂负荷优化分配[J].电力系统自动化,2013,37(13):125-129. Xiang Dejun,Chen Genjun,Gu Quan,et al.Optimal load distribution for AGC power plant based on real-time coal consumption[J].Automation of Electric Power Systems,2013,37(13):125-129(in Chinese).
[9]
董晓天,严正,冯冬涵,等.计及风电出力惩罚成本的电力系统经济调度[J].电网技术,2012,36(8):76-80. Dong Xiaotian,Yan Zheng,Feng Donghan,et al.Power system economic dispatch considering penalty cost of wind farm output[J].Power System Technology,2012,36(8):76-80(in Chinese).
[10]
张晓辉,闫柯柯,卢志刚,等.基于碳交易的含风电系统低碳经济调度[J].电网技术,2013,37(10):2697-2704. Zhang Xiaohui,Yan Keke,Lu Zhingang,et al.Carbon trading based low-carbon economic dispatching for power grid integrated with wind power system[J].Power System Technology,2013,37(10):2697-2704(in Chinese).
[11]
李卫华,王玉山.大型火电机组在AGC运行方式下的控制特性分析[J].电网技术,2005,29(18):12-16. Li Weihua,Wang Yushan.Analysis on control characteristics of high capacity thermal power generation sets under AGC mode[J].Power System Technology,2005,29(18):12-16(in Chinese).
[12]
尚金成.基于时间尺度的节能发电优化调度协调模型及算法[J].电网技术,2008,32(15):56-61. Shang Jincheng.Coordination model and algorithm of energy-saving power generation dispatching based on time scale[J].Power System Technology,2008,32(15):56-61(in Chinese)
[13]
谢开,刘军,宁文元,等.华北电网-体化调度计划和实时发电控制系统的设计和实现[J].电网技术,2005,29(18):6-11. Xie Kai,Liu Jun,Ning Wenyuan,et al.Design and realization of integrated scheduling and dispatch system for north China power grid[J].Power System Technology,2005,29(18):6-11(in Chinese).
[14]
徐帆,陈之栩,张勇,等.实时发电计划模型及其应用[J].电力系统自动化,2013,37(6):117-121. Xu Fan,Chen Zhixu,Zhang Yong,et al.Real time generation scheduling model and application[J].Automation of Electric Power Systems,2013,37(6):117-121(in Chinese).
[15]
Jiang Ruiwei,Wang Jianhui,Guan Yongpei.Robust unit commitment with wind power and pumped storage hydro[J].IEEE Trans on Power Systems,2012,27(2):800-810.
[16]
Simoglou C K,Biskas P N,Bakirtzis A G.Optimal self-scheduling of thermal units during commissioning[J].IEEE Trans on Power Systems,2012,27(1):181-188.