舒印彪,张文亮.特高压输电若干关键技术研究[J].中国电机工程学报,2007,27(31):1-6. Shu Yinbiao,Zhang Wenliang.Research of key technologies for UHV transmission[J].Proceedings of the CSEE,2007,27(31):1-6(in Chinese).
[4]
舒印彪,胡毅.交流特高压输电线路关键技术的研究及应用[J].中国电机工程学报,2007,27(36):1-7. Shu Yinbiao,Hu Yi.Research and application of the key technologies of UHV AC transmission line[J].Proceedings of the CSEE,2007,27(36):1-7(in Chinese).
[5]
舒印彪,张文亮,周孝信,等.特高压同步电网安全性评估[J].中国电机工程学报,2007,27(34):1-6. Shu Yinbiao,Zhang Wenliang,Zhou Xiaoxin,et a1.Security evaluation of UHV synchronized power grid[J].Proceedings of the CSEE,2007,27(34):1-6(in Chinese).
[6]
郭强,张运洲,吕健.我国未来同步电网构建研究[J].电网技术,2005,29(22):14-18. Guo Qiang,Zhang Yunzhou,lü Jian.Study on scheme for structure and construction of synchronous power grid in China from 2010 to 2020[J].Power System Technology,2005,29(22):14-18(in Chinese).
[7]
汤涌.电力系统安全稳定综合防御体系框架[J].电网技术,2012,36(8):1-5. Tang Yong.Framework of comprehensive defense architecture for power system security and stability[J].Power System Technology,2012,36(8):1-5(in Chinese).
[8]
任大伟,易俊,韩彬,等.皖电东送工程系统调试中电网运行方式的调整[J].电网技术,2014,38(6):1611-1615. Ren Dawei,Yi Jun,Han Bin,et al.Adjustment of power grid operating modes in system commissioning of UHV AC power transmission demonstration project from Huainan to Liantang[J].Power System Technology,2014,38(6):1611-1615(in Chinese).
[9]
王建明,孙华东,任大伟,等.锦屏-苏南特高压直流投运后电网的稳定特性及协调控制策略[J].电网技术,2012,36(12):66-70. Wang Jianming,Sun Huadong,Ren Dawei,et al.Stability characteristics and coordinated control strategy of interconnected grid integrated with UHVDC Transmission line from Jinping to Sunan[J].Power System Technology,2012,36(12):66-70(in Chinese).
[10]
郑彬,班连庚,项祖涛,等.合闸750 kV空载变压器引起的系统电压暂降现场实测与计算分析[J].电网技术,2012,36(9):203-208. Zheng Bin,Ban Liangeng,Xiang Zutao,et al.Analysis on field measured system voltage sag caused by energizing 750 kV no-load transformer and its simulation comparison[J].Power System Technology,2012,36(9):203-208(in Chinese).
[11]
汤涌.交直流电力系统多时间尺度全过程仿真和建模研究新进展[J].电网技术,2009,33(16):1-8. Tang Yong.New progress in research on multi-time scale unified simulation and modeling for AC/DC power systems[J].Power System Technology,2009,33(16):1-8(in Chinese).
[12]
郑彬,项祖涛,班连庚,等.特高压静止移相器应用的电磁暂态仿真分析[J].电网技术,2013,37(5):1372-1377. Zheng Bin,Xiang Zutao,Ban Liangeng,et al.Electromagnetic transient analysis on static phase shifter applied in UHV power grid[J].Power System Technology,2013,37(5):1372-1377(in Chinese).
[13]
张媛媛,班连庚,项祖涛,等.1 000 kV特高压固定串联补偿装置关键元件工作条件研究[J].电网技术,2013,37(8):2218-2224. Zhang Yuanyuan,Ban Liangeng,Xiang Zutao,et al.Research on working condition of key components for fixed series compensation in 1 000 kV UHVAC power transmission project[J].Power System Technology,2013,37(8):2218-2224(in Chinese).
张媛媛,班连庚,陈维江,等.特高压交流输电系统工频过电压差异性研究[J].电网技术,2014,38(7):1765-1771. Zhang Yuanyuan,Ban Liangeng,Chen Weijiang,et al.Research on diversities of power frequency overvoltage of UHV AC transmission system[J].Power System Technology,2014,38(7):1765-1771(in Chinese).
[17]
曾兵,张健,罗煦之,等.玉树与青海主网300 kV联网工程系统调试仿真研究及预控策略究[J].电网技术,2014,38(5):1223-1228. Zeng Bing,Zhang Jian,Luo Xuzhi,et al.Simulation on system commissioning for interconnection project of 330kV Qinghai Power Grid with 110 kV Yushu power system and analysis on its pre-control strategy[J].Power System Technology,2014,38(5):1223-1228(in Chinese).