林章岁,罗利群.福建省风电出力特性及其对电网的影响分析[J].电力建设,2011,32(12):18-23. Lin Zhangsui,Luo Liqun.Analysis of wind power output characteristics in Fujian and its impact on power grid[J].Electric Power Construction,2011,32(12):18-23(in Chinese).
[2]
苏鹏,刘天琪,李兴源.含风电的系统最优旋转备用的确定[J].电网技术,2010,34 (12):158-162. Su Peng,Liu Tianqi,Li Xingyuan.Determination of optimal spinning reserve of power grid containing wind[J].Power System Technology,2010,34(12):158-162 (in Chinese).
[3]
Tsung-Ying L.Optimal spinning reserve for a wind-thermal power system using EIPSO [J].IEEE Trans on power Systems,2007,22(4):1612-1621.
[4]
孙元章,吴俊,李国杰.风力发电对电力系统的影响[J].电网技术,2007,31(20):55-62. Sun Yuanzhang,Wu Jun,Li Guojie.Influence research of wind power generation on power system[J].Power System Technology,2007,31(20):55-62(in Chinese).
[5]
张旭,罗先觉,赵峥,等.以风电场效益最大为目标的风电装机容量优化[J].电网技术,2012,36(1):237-240. Zhang Xu,Luo Xianjue,Zhao Zheng,et al.Installed capacity optimization of wind turbine generators considering maximum economic benefit of wind farm[J].Power System Technology,2012,36(1):237-240(in Chinese).
[6]
Bodo D R,Mauzy D M,Trefny F J.Economic generation dispatch with responsive spinning reserve constraints[J].IEEE Trans on Power Systems,1994,9(1):555-559.
[7]
张国全,王秀丽,王锡凡.电力市场中旋转备用的效益和成本分析[J].电力系统自动化,2000,24(10):14-18. Zhang Guoquan,Wang Xiuli,Wang Xifan.Study on benefits and costs of spinning reserve capacity in power market[J].Automation of Electric Power systems,2000,24(10):14-18(in Chinese).
[8]
张国强,吴文传,张伯明.考虑风电接入的有功运行备用协调优化[J].电力系统自动化,2011,35(12):15-19. Zhang Guoqiang,Wu Wenchuan,Zhang Boming.Optimization of operation reserve coordination considering wind power integration [J].Automation of Electric Power Systems,2011,35(12):15-19(in Chinese).
[9]
元博,周明,李庚银,等.基于可靠性指标的含风电电力系统的发电和运行备用的协调调度模型[J].电网技术,2013,37(2):800-807. Yuan Bo, Zhou Ming,Li Gengyin,et al.A coordinated dispatching model considering generation and operation reserve for wind power integrated power system based on ELNSR[J].Power System Technology,2013,37(2):800-807(in Chinese).
[10]
何剑,孙华东,刘明松.基于扩展状态空间分割法的含风电场电力系统运行备用风险评估[J].电网技术,2012,36(3):257-263. He Jian,Sun Huadong,Liu Mingsong.Extended state-space partitioning based operating reserve risk assessment for power grid connected with wind farms[J].Power System Technology,2012,36(3):257-263(in Chinese).
[11]
Liu P L,Der Kiureghian A.Multivariate distribution models with prescribed marginals and covariances[J].Probabilistic Engineering Mechanics,1986,1(2):105-112.
[12]
吕大刚.基于改进点估计法的结构整体概率抗震能力分析[J].世界地震工程,2008,24(4):7-14. Lü Dagang.Global probabilistic seismic capacity analysis based on an improved point estimation method[J].World Earthquake Engneering,2008,24(4):7-14(in Chinese).
[13]
王雁凌,许传龙,岳巍澎.时变可靠性约束下含风电系统旋转备用的随机规划模型[J].电网技术,2013,37(5):1311-1316. Wang Yanling,Xu Chuanlong,Yue Weipeng.A stochastic programming model for spinning reserve of power grid containing wind farms under constraint of time-varying reliability[J].Power System Technology,2013,37(5):1311-1316(in Chinese).