罗恒,刘涤尘,史秋芸,等.基于暂态能量函数的核电机组接入电网暂态稳定性研究[J].电网技术,2013,37(1):119-125.Luo Heng,Liu Dichen,Shi Qiuyun,et al.Study on transient stability of nuclear power plant connected to power grid based on transient energy function[J].Power System Technology,2013,37(1):119-125(in Chinese).
[2]
赵洁,刘涤尘,欧阳利平,等.大型压水堆核电机组与电网相互影响机制的研究[J].中国电机工程学报,2012,32(1):64-70.Zhao Jie,Liu Dichen,Ouyang Liping,et al.Interaction between large-scale pressurized water reactor nuclear power plants and power systems[J].Proceedings of the CSEE,2012,32(1):64-70(in Chinese).
赵洁,刘涤尘,吴耀文.压水堆核电厂接入电力系统建模[J].中国电机工程学报,2009,29(31):8-13.Zhao Jie,Liu Dichen,Wu Yaowen,et al.Modelling of pressurized water reactor nuclear power plant integrated into power system simulation[J].Proceedings of the CSEE,2009,29(31):8-13(in Chinese).
[7]
王建成,张涛,商幼民.秦山第二核电厂650 MW发电机波动原因分析及解决措施[J].继电器,2004,32(19):59-63.Wang Jiancheng,Zhang Tao,Shang Youmin.Analysis and countermeasures on fluctuation of 650 MW generator of Qinshan nuclear power plant II[J].Automation of Electric Power Systems,2004,32(19):59-63(in Chinese).
[8]
赵强.核电厂反应堆堆芯物理在线仿真系统研究[D].哈尔滨:哈尔滨工程大学,2006.
[9]
Dustin R O,Hou Jia,Gary G,et al.Development of a modern pressurized water reactor simulator:instrumentation,design and data acquisition[C]//Nuclear Science Symposium Conference.Honolulu,USA,2007:556-558.
[10]
Huang Huiwen,Shih Chunkuan,Swu Yih,et al.Model extension and improvement for simulator-based software safety analysis[J].Nuclear Engineering and Design,2007,237(9):955-971.
[11]
Cheng Y H,Shih Chunkuan,Chiang S C,et al.Introducing PCTRAN as an evaluation tool for nuclear power plant emergency responses[J].Annals of Nuclear Energy,2012,40(1):122-129.
[12]
叶成,郑明光,韩旭,等.AP1000核电站非能动安全系统的比较优势[J].原子能科学技术,2012,46(10):1221-1225.Ye Cheng,Zheng Mingguang,Han Xu,et al.Comparative advantages of AP1000 passive safety system[J].Atomic Energy Science and Technology,2012,46(10):1221-1225(in Chinese).
[13]
张学成.用于电力系统动态模拟的压水堆核电厂数学模型[J].电网技术,1990,14(4):71-77.Zhang Xuecheng.Pressurized water reactor nuclear power plant model for power system dynamics simulation[J].Power System Technology,1990,14(4):71-77(in Chinese).
[14]
Hu Xuehao,Zhang Xuecheng,Zhou Xiuming,et al.Pressurized water reactor nuclear power plant (NPP) modeling and the midterm dynamic simulation after NPP has been introduced into Power System[C]//1993 IEEE Region 10 Conference on Computer, Communication, Control and Power Engineering.Beijing,China:IEEE,1993:367-370.
[15]
赵洁,刘涤尘,熊莉,等.基于PSASP自定义模型的核电机组动态响应仿真[J].核动力工程,2010,31(3):113-117,142.Zhao Jie,Liu Dichen,Xiong Li,et al.Simulation of dynamic response of nuclear power plant based on user-defined model in PSASP[J].Nuclear Power Engineering,2010,31(3):113-117,142(in Chinese).
[16]
Schulz T L.Westinghouse AP1000 advanced passive plant[J].Nuclear Engineering and Design,2006,236(14-16):1547-1557.
[17]
李亚楼,吴中习.Matlab模型接入PSASP暂态稳定计算模块的方法[J].电网技术,2008,32(19):31-36.Li Yalou,Wu Zhongxi.An approach to interface Matlab model with PSASP transient stability module[J].Power System Technology,2008,32(19):31-36(in Chinese).