Maroto I G,Pezic M.LOLE and EDNS calculation in presence of RES,pump units and interconnections[C]//European Energy Market (EEM) 9th International Conference.2012,Alcobendas,Spain.
[2]
元博,周明,李庚银,等.基于可靠性指标的含风电电力系统的发电和运行备用的协调调度模型[J].电网技术,2013,36(3):800-807.Yuan Bo,Zhou Ming,Li Gengyin,et al.A coordinated dispatching model considering generation and operating reserve for wind power integrated power system based on ELNSR[J].Power System Technology,2013,36(3):800-807(in Chinese).
[3]
Billinton R,Allan R N.Reliability evaluation of power systems[M].New York:Plenum Press,1984:150-160.
[4]
Billinton R,Karki B.Unit commitment risk analysis of wind integrated power systems[J].IEEE Transactions on Power Systems,2009,24(2):930-939.
[5]
Ding X Y,Lee W J,Wang J X,et al.Studies on stochastic unitcommitment formulation with flexible generating units[J].Electric Power Systems Research,2010,80(1):130-141.
[6]
赖业宁,薛禹胜,高翔,等.发电容量充裕度的风险模型与分析[J].电力系统自动化,2006,30(17):1-6.Lai Yening,Xue Yusheng,Gao Xiang,et al.Risk model and analysis of generation capacity adequacy[J].Automation of Electric Power Systems,2006,30(17):1-6(in Chinese).
[7]
周辉,娄素华,吴耀武,等.发电系统一致性运行可靠性指标及 其优化模型[J].中国电机工程学报,2009,29(13):72-79.Zhou Hui,Lou Suhua,Wu Yaowu,et al.Coherent reliability index for generation system operation and its optimization model[J].Proceedings of the CSEE,2009,29(13):72-79(in Chinese).
[8]
Rockafellar R T,Royset J O.On buffered failure probability in design and optimization of structures[J].Reliability Engineering & System Safety,2010,95(5):499-510.
[9]
Ongsaku W,Petcharaks N.Unit commitment by enhanced adaptive Lagrangian relaxation[J].IEEE Trans on Power Systems,2004,19(1):620-628.
[10]
Billinton R,Fotuhi-firuzabad M.Reliability framework for generating unit commitment[J].Electric Power System Research,2000,56(1):81-88.
[11]
盛骤,谢式千,潘承毅.概率论与数理统计[M].北京:高等教育出版社,1999:47-50.
[12]
周玮.含风电场的电力系统动态经济调度问题研究[D].大连:大连理工大学,2010.
[13]
Pagnoneelli B K,Ahmed S,Shapiro A.Sample average approximation method for chance constrained programming:theory and applications[J].Journal Optimal Theory Application,2009(142):399-416.
[14]
Rockafellar R T,Uryasev S.Optimization of conditional value-at-risk[J].Journal of risk,2000:21-41.
[15]
Billinton R,Kumar S,Chowdhury N,et al.A reliability test system for educational purposes-basic data[J].IEEE Transactions on Power Systems,1989,4(3):1238-1244.
[16]
Billinton R,Kumar S,Chowdhury N,et al.A reliability test system for educational purposes-basic results[J].IEEE Transactions on Power Systems,1990,5(1):319-325.
[17]
牛晨光,刘丛.基于相空间重构的神经网络短期风电预测模型[J].中国电力,2011,44(11):73-77.Niu Chenguang,Liu Cong.Neural network model for short-term wind power prediction based on phase space reconstruction[J].Electric Power,2011,44(11):73-77(in Chinese).