刘树杰.支持“能效电厂”的电价政策建议[J].电力技术经济,2007,19(4):1-3.Liu Shujie.Policy proposals on electricity tariffs for supporting“energy-efficient power plants”[J].Electric Power Technologic Economics,2007,19(4):1-3(in Chinese).
[2]
郭丽丽,原毅军.区域性节能潜力测算:概念解释与方法综述[J].科技和产业,2010,10(2): 38-40.Guo Lili,Yuan Yijun.Regional energy conservation potential calculation:concepts explanation and methods survey[J].Science Technology and Industry,2011,10(2):38-40(in Chinese).
[3]
熊华文,郁聪.中小工业企业能效水平现状与节能潜力分析[J].电力需求侧管理,2009,11(6):5-8.Xiong Huawen,Yu Cong.The energy efficiency circumstances of small and medium sized industrial enterprises and their potential analysis for energy conservation[J].Power Demand Side Management,2009,11(6):5-8(in Chinese).
[4]
Iino Y.Consideration on systematic analysis and evaluation of energy system efficiency[C]//SICE Annual Conference (SICE).Tokyo,Japan:IEEE,2011:1390-1391.
[5]
王晓杰.工业企业节能潜力预测模型研究[D].大连:大连理工大学,2010.
[6]
Xu Yuhui,Lü Yanke.The construction strategies of public rental housing based on energy efficiency mechanism[C]//Computer Distributed Control and Intelligent Environmental Monitoring(CDCIEM).Changsha,China:IEEE,2011:1853-1857.
[7]
王志国,杨文哲,王竹筠,等.石油生产系统用能分析方法及节能潜力判别准则研究[J].中外能源,2009(14):112-116.Wang Zhiguo,Yang Wenzhe,Wang Zhujun,et al.A study into energy consumption analysis method and criteria for assessing energy-saving potential of petroleum production system[J].Sino-Global Energy,2009(14):112-116(in Chinese).
[8]
李莉,王建军,李宁,等.低碳经济下能效电厂的半方差风险投资组合优化模型[J].电网技术,2011,35(8):26-29.Li Li,Wang Jianjun,Li Ning,et al.A risk investment portfolio optimization model of energy efficiency power plant based on mean semi-variance theory in low-carbon economy environment[J].Power System Technology,2011,35(8):26-29(in Chinese).
[9]
李泓泽,王宝,郭森.智能电网条件下能效电厂参与市场竞价的分析模型及效益测算[J].电网技术,2012,36(7):111-116.Li Hongze,Wang Bao,Guo Sen.Analytic model and benefits measurement of efficiency power plant participating in market bidding transaction in smart grid environment[J].Power System Technology,2012,36(7):111-116(in Chinese).
[10]
周景宏,胡兆光,田建伟,等.含能效电厂的电力系统生产模拟[J].电力系统自动化,2010,34(18):27-31.Zhou Jinghong,Hu Zhaoguang,Tian Jianwei,et al.Power system production simulation including efficiency power plant[J].Automation of Electric Power Systems,2010,34(18):27-31(in Chinese).
[11]
谭显东,胡兆光,彭谦.考虑能效电厂的供需资源组合优化模型[J].电网技术,2009,33(20):108-112.Tan Xiandong,Hu Zhaoguang,Peng Qian.A resource combination optimization model considering efficiency power plant[J].Power System Technology,2009,33(20):108-112(in Chinese).
[12]
Zhang Qi,Cai Jiuju,Song Jun,et al.Study on energy efficiency and energy management in integrated iron and steel works[C]//Energy and Environment Technology,2009.ICEET'09.Guilin,Guangxi:IEEE,2009:341-343.
[13]
秦宏波.电机系统能效现状和节能潜力分析方法综述[J].上海节能.2009(2):4-7.Qin Hongbo.The analysis of current situation of energy efficiency and energy conservation potential motor system[J].Shanghai Energy Conservation,2009(2):4-7(in Chinese).
[14]
Du Xiaotong,Cai Wenjian,Jia Lei.Air-conditioning system energy efficiency and energy consumption evaluation[C]//Intelligent Control and Automation(WCICA).Jinan,China:IEEE,2010:1908-1913.
[15]
周景宏.能效电厂理论与综合资源战略规划模型研究[D].北京:华北电力大学,2011.
[16]
高祥峰.能效电厂理论与实施方案研究[D].北京:华北电力大学,2009.
[17]
向红伟,曾鸣,刘宏志,等.能效电厂项目市场运作模式及保障机制研究[J].水电能源科学,2013,31(3):224-227.Xiang Hongwei,Zeng Ming,Liu Hongzhi,et al.Research on operation mode and guarantee mechanism of efficiency power plant project[J].Water Resources and Power,2013,31(3):224-227(in Chinese).